Design-Build Services for the Iron Bridge Regional Water Reclamation Facility Clarifier Mechanism Replacement

Closed State & local contract opportunity

Solicitation number
RFP24-0160
State
Florida
Responses due

Opportunity facts

Jurisdictions
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Orlando is seeking design-build services for the Iron Bridge Regional Water Reclamation Facility Clarifier Mechanism Replacement project through RFP24-0160. The procurement involves a comprehensive replacement of eight secondary clarifier mechanisms at the facility located in Oviedo, Florida. Respondents must provide all labor, equipment, and materials to remove existing clarifier mechanisms and install new ones, including full-surface scum collection systems and Los Angeles Energy Dissipating Inlets (LA-EDI). Qualified proposers must be a Florida-licensed Design-Build Firm with either a licensed architectural or engineering professional on their team. The evaluation criteria include experience, qualifications, past performance, and MBE/WBE/VBE participation, with a maximum score of 100 points. Proposal responses are due electronically by 2:00 p.m. local time on February 28, 2024, with a project question submission deadline of February 19, 2024. The total project is scheduled for a maximum of 730 days, with a two-phase approach focusing first on preconstruction and design, followed by permitting and construction.

The procurement includes specific set-aside and participation requirements for minority, women-owned, and veteran-owned businesses, with goals of 18% for Minority Business Enterprises and 6% for Women-Owned Business Enterprises. Respondents must comply with living wage requirements of at least $15.00 per hour and adhere to Davis-Bacon wage rates for the Orlando region. The project will utilize an "open book" method for developing the Guaranteed Maximum Price (GMP) and requires performance and payment bonds. Three manufacturers were previously contacted for budgetary estimates, including Ovivo, Walker Process, and WesTech, with equipment replacement costs ranging from $1,300,000 to $3,310,000 for four mechanisms. The total project budget is set at $8,000,000, with the City of Orlando expecting comprehensive design and construction services through a design-build contract. Proposers must demonstrate compliance with local ordinances, including non-discrimination requirements and specific minority business enterprise regulations.

Opportunity text

Notice is hereby given that City of Orlando is accepting sealed responses for RFP24-0160 Design-Build Services for the Iron Bridge Regional Water Reclamation Facility Clarifier Mechanism Replacement and they must be submitted electronically by 2:00 pm local time on Wednesday, February 28, 2024, in order for a Respondent to be considered for award of a contract.

Respondents are solely responsible for ensuring that their submittals are complete, uploaded, and submitted electronically via OpenGov by the due date and time. The City shall not be responsible for any submission delays or failures caused by any occurrence. Respondents are expected to examine this solicitation, specifications, associated drawings, if any, and all instructions. Failure to do so will be at the Respondent's risk.

Each Respondent shall furnish the information required on each submittal form and each accompanying sheet thereof on which an entry is made.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors