Escambia County is requesting bids on an equipment-only purchase for boiler and pump replacement at the MC Blanchard Judicial Building under ITB #PD 25-26.114, with bids due September 17, 2026 at 9:30 a.m. and a question deadline of September 9, 2026 at 8:00 a.m. This is a single-source specification procurement requiring AERCO Benchmark 3000 Low NOx natural gas-fired boilers and TACO pump models; no other manufacturers are acceptable.

The scope comprises three AERCO Benchmark 3000 boilers (each rated 2,500 MBH input, 2,175 MBH gross output, 87% thermal efficiency) with factory-installed BACnet MS/TP gateway interface, Boiler Sequencing Technology, motorized isolation valves, condensate neutralization kits, and integral disconnect switches; three TACO KS3007 vertical inline primary hot water loop pumps (218 GPM, 45 feet of head) with NEMA premium efficiency motors and split-coupled configurations; and two TACO FI4011 secondary hot water loop base-mounted end-suction pumps (654 GPM, 90 feet of head) with VFDs furnished by the controls contractor. All motors operate at 480 volts, three-phase, 60 Hz; boiler electrical at 460 volts, three-phase, 60 Hz. Boilers must bear ASME stamps, carry AGA certification per NFPA Code 54, include fully modulating burner systems with spark ignition and 100% main-valve shutoff, and utilize 316L stainless steel construction. Warranty requirements include 10-year heat exchanger, lifetime thermal shock, five-year burner, two-year edge controller, and 18-month parts coverage. Equipment delivery to Escambia County Facilities Management, 100 E. Blount Street, Pensacola, FL 32501; installation completion scheduled prior to November 15, 2026. Bidders must submit lump sum pricing including all packing, handling, shipping, and delivery within Escambia County; provide one day of manufacturer technical representative training at no cost; and deliver a signed commissioning report. Workers' compensation (statutory limits) and $1,000,000 commercial auto liability are required. Bids remain valid for 90 calendar days following opening. The County reserves the right to award on an all-or-none or item-by-item basis and reject any bid.

Opportunity text

The procurement is an advanced equipment package purchase for the replacement of multiple non-operational boilers and pump equipment. This is an equipment purchase ONLY. The equipment should be delivered to Escambia County Facilities Management 100 E. Blount Street, Pensacola, FL 32501.

The non-operational equipment is beyond life expectancy and needs immediate replacement. Although the installation of this equipment is in the professional design phase, the County is seeking to advance purchase the equipment in order to time delivery with installation scheduled to be complete prior to November 15, 2026.

The design for this project is based on AERCO BENCHMARK 3000 Low NOx Boilers (natural gas fired) and TACO KS3007 vertical inline Pumps. New boiler equipment to match existing equipment at downtown Governmental Complex installed in 2026.