This is an equipment schedule document for the M.C. Blanchard Judicial Building Boiler Replacement Project in Pensacola, Florida, prepared by Dell Consulting for Escambia County. The project involves the procurement of an advanced equipment package consisting of boiler and pump systems to replace non-operational equipment at 190 West Government Street, Pensacola, FL 32502. The equipment package includes three AERCO Benchmark natural gas boilers (B-1, B-2, B-3), each rated at 2,500 MBH input with 87 percent thermal efficiency and 2,175 MBH gross output, and five pumps: three TACO KS3007 primary hot water loop vertical inline pumps (PHP-1, PHP-2, PHP-3) rated at 218 GPM and 45 feet of head, and two TACO FI4011 secondary hot water loop base-mounted end-suction pumps (SHP-1, SHP-2) rated at 654 GPM and 90 feet of head. Equipment delivery is directed to Escambia County Facilities Management at 100 E. Blount Street, Pensacola, FL 32501, with installation scheduled for completion prior to November 15, 2026.
The boiler and pump specifications include detailed performance requirements and design standards. All boilers must include motorized isolation valves, BACnet IP gateways for building automation system integration, condensate neutralization kits, and integral disconnect switches. Primary hot water loop pumps require NEMA premium efficiency motors, internal or factory-mounted grounding rings equivalent to AEGIS specification, split-coupled configurations to facilitate motor removal, and suction diffusers with integral strainers. Secondary hot water loop pumps require variable frequency drives (VFDs) to be furnished by the controls contractor with integral disconnect switches. All motors must operate at 480 volts, three-phase, 60 Hz, with the boiler electrical requirements at 460 volts, three-phase, 60 Hz. The design basis flow rate for boilers is 218 GPM at 160°F entering water temperature and 180°F leaving water temperature. This equipment-only procurement advances the purchase timeline to ensure delivery coordination with the installation phase of the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PUMP SCHEDULE
MARK SERVICE PUMP CONFIGURATION
FLOW DATA PUMP SIZE MOTOR DATA MINIMUM
EFFICIENCY
DRIVE TYPE
BASIS OF DESIGN
FLOW
(GPM)
HEAD
(FT)
NPSH
(FT)
SHUTOFF HEAD
(FT)
SUCTION
(IN.)
DISCHARGE
(IN.) MAX BHP HP NOMINAL
RPM
ELEC.
V/PH/HZ MANUFACTURER MODEL
PHP-1 PRIMARY HOT WATER LOOP VERTICAL INLINE 218 45 4.6 50.5 3 3 3.05 5 1760 480/3/60 81 STANDARD TACO KS3007 PHP-2 PRIMARY HOT WATER LOOP VERTICAL INLINE 218 45 4.6 50.5 3 3 3.05 5 1760 480/3/60 81 STANDARD TACO KS3007 PHP-3 PRIMARY HOT WATER LOOP VERTICAL INLINE 218 45 4.6 50.5 3 3 3.05 5 1760 480/3/60 81 STANDARD TACO KS3007 SHP-1 SECONDARY HOT WATER LOOPBASE MOUNTED END-SUCTION 654 90 14.9 108.5 5 4 18.64 25 1760 480/3/60 80 VFD TACO FI4011 SHP-2 SECONDARY HOT WATER LOOPBASE MOUNTED END-SUCTION 654 90 14.9 108.5 5 4 18.64 25 1760 480/3/60 80 VFD TACO FI4011
NOTES:
1. PROVIDE NEMA PREMIUM EFFICIENCY MOTORS.
2. PROVIDE GROUNDING RINGS. GROUNDING RINGS SHALL BE INTERNAL TO MOTOR OR FACTORY-MOUNTED EXTERNAL EQUAL TO AEGIS.
3. PROVIDE SPLIT-COUPLED PUMP TO FACILITATE MOTOR REMOVAL AND SERVICE.
4. PROVIDE SUCTION DIFFUSER WITH INTEGRAL STRAINER.
5. PHP-1, -2, -3: PROVIDE MANUFACTURER'S FLOOR-MOUNTED PUMP SUPPORT OR FIELD-INSTALLED PIPE MOUNT.
6. PROVIDE MAXIMUM POSSIBLE IMPELLER SIZE FOR THE NON-OVERLOADING RATING OF THE SPECIFIED MOTOR.
7. VFDs SHALL BE FURNISHED BY THE CONTROLS CONTRACTOR. SEE SPECIFICATIONS FOR VFD FEATURES; INCLUDE INTEGRAL DISCONNECT SWITCHES.
BOILER SCHEDULE
MARK FUEL TYPE
INPUT (MBH) THERMAL
EFFICIENCY
GROSS
OUTPUT
(MBH)
TURNDOWN
WATER SIDE ELEC TOTAL
WEIGHT (LB)
PHYSICAL DIMENSIONS BASIS OF DESIGN
FLOW
(GPM)
EWT
(°F)
LWT
(°F)
WIDTH
(IN.)
DEPTH
(IN.)
HEIGHT
(IN.) MANUFACTURER MODELMAX MIN V/PH/HZ
B-1 NATURAL GAS 2,500 167 87.0 2,175 15:1 218 160 180 460/3/60 2,000 28 55 78 AERCO BENCHMARK B-2 NATURAL GAS 2,500 167 87.0 2,175 15:1 218 160 180 460/3/60 2,000 28 55 78 AERCO BENCHMARK B-3 NATURAL GAS 2,500 167 87.0 2,175 15:1 218 160 180 460/3/60 2,000 28 55 78 AERCO BENCHMARK
NOTES:
1. COORDINATE WITH CONTROLS FOR EMERGENCY BOILER SHUTDOWN.
2. PROVIDE MOTORIZED ISOLATION VALVE.
3. PROVIDE BACNET IP GATEWAY FOR INTEGRATION TO BUILDING AUTOMATION SYSTEM.
4. PROVIDE CONDENSATE NEUTRALIZATION KIT.
5. PROVIDE INTEGRAL DISCONNECT SWITCH.
M.
C.
B
LA
NC
HA
RD
JU
DI
CI
AL
B
UI
LD
IN
G
BO
ILE
R
RE
PL
AC
EM
EN
T
PR
OJ
EC
T
0 W
ES
T
GO
VE
RN
ME
NT
S
TR
EE
T, P
EN
SA
CO
LA
, F
L 3
SEAL
NU
MB
ER
RE
VI
SI
ON
RE
VI
SI
ON
D
ES
CR
IP
TI
ON
DESIGNED BY:
DRAWN BY:
CHECKED BY:
DATE:
SHEET TITLE:
SHEET:
08-14-2026
EARLY RELEASE EQUIPMENT PACKAGE
P:
\2
6\
-0
M
C B la nc ha rd
B oi le r R ep la ce m en t P ro je ct \2
6-
2\ C on st ru ct s\ M
EC
H
AN
IC
AL
\M
EC
H
AN
IC
AL
.d w g/
8/
/2
6/ G re g
C la rk dell consulting MEP Engineering
Florida License Number 28404 129 E. Government Street
Pensacola, FL 32502 P:850-332-5687 F:850-332-6629
DELL CONSULTING PROJECT: 26-022
Jason A. Matiacio 75489
BGA
BGA
SCHEDULES
JAM
M-601
| Sheets and Views |