2026-08-14_MC_Blanchard_Boiler_and_Pump_Schedules.pdf

PDF 789 KB Posted

Attached to
Boiler Replacement - MC Blanchard Judicial Building - Equipment Only
Solicitation number
PD 25-26.114
Issued by
Escambia County, Florida

About this file

This is an equipment schedule document for the M.C. Blanchard Judicial Building Boiler Replacement Project in Pensacola, Florida, prepared by Dell Consulting for Escambia County. The project involves the procurement of an advanced equipment package consisting of boiler and pump systems to replace non-operational equipment at 190 West Government Street, Pensacola, FL 32502. The equipment package includes three AERCO Benchmark natural gas boilers (B-1, B-2, B-3), each rated at 2,500 MBH input with 87 percent thermal efficiency and 2,175 MBH gross output, and five pumps: three TACO KS3007 primary hot water loop vertical inline pumps (PHP-1, PHP-2, PHP-3) rated at 218 GPM and 45 feet of head, and two TACO FI4011 secondary hot water loop base-mounted end-suction pumps (SHP-1, SHP-2) rated at 654 GPM and 90 feet of head. Equipment delivery is directed to Escambia County Facilities Management at 100 E. Blount Street, Pensacola, FL 32501, with installation scheduled for completion prior to November 15, 2026.

The boiler and pump specifications include detailed performance requirements and design standards. All boilers must include motorized isolation valves, BACnet IP gateways for building automation system integration, condensate neutralization kits, and integral disconnect switches. Primary hot water loop pumps require NEMA premium efficiency motors, internal or factory-mounted grounding rings equivalent to AEGIS specification, split-coupled configurations to facilitate motor removal, and suction diffusers with integral strainers. Secondary hot water loop pumps require variable frequency drives (VFDs) to be furnished by the controls contractor with integral disconnect switches. All motors must operate at 480 volts, three-phase, 60 Hz, with the boiler electrical requirements at 460 volts, three-phase, 60 Hz. The design basis flow rate for boilers is 218 GPM at 160°F entering water temperature and 180°F leaving water temperature. This equipment-only procurement advances the purchase timeline to ensure delivery coordination with the installation phase of the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUMP SCHEDULE

MARK SERVICE PUMP CONFIGURATION

FLOW DATA PUMP SIZE MOTOR DATA MINIMUM

EFFICIENCY

DRIVE TYPE

BASIS OF DESIGN

FLOW

(GPM)

HEAD

(FT)

NPSH

(FT)

SHUTOFF HEAD

(FT)

SUCTION

(IN.)

DISCHARGE

(IN.) MAX BHP HP NOMINAL

RPM

ELEC.

V/PH/HZ MANUFACTURER MODEL

PHP-1 PRIMARY HOT WATER LOOP VERTICAL INLINE 218 45 4.6 50.5 3 3 3.05 5 1760 480/3/60 81 STANDARD TACO KS3007 PHP-2 PRIMARY HOT WATER LOOP VERTICAL INLINE 218 45 4.6 50.5 3 3 3.05 5 1760 480/3/60 81 STANDARD TACO KS3007 PHP-3 PRIMARY HOT WATER LOOP VERTICAL INLINE 218 45 4.6 50.5 3 3 3.05 5 1760 480/3/60 81 STANDARD TACO KS3007 SHP-1 SECONDARY HOT WATER LOOPBASE MOUNTED END-SUCTION 654 90 14.9 108.5 5 4 18.64 25 1760 480/3/60 80 VFD TACO FI4011 SHP-2 SECONDARY HOT WATER LOOPBASE MOUNTED END-SUCTION 654 90 14.9 108.5 5 4 18.64 25 1760 480/3/60 80 VFD TACO FI4011

NOTES:

1. PROVIDE NEMA PREMIUM EFFICIENCY MOTORS.

2. PROVIDE GROUNDING RINGS. GROUNDING RINGS SHALL BE INTERNAL TO MOTOR OR FACTORY-MOUNTED EXTERNAL EQUAL TO AEGIS.

3. PROVIDE SPLIT-COUPLED PUMP TO FACILITATE MOTOR REMOVAL AND SERVICE.

4. PROVIDE SUCTION DIFFUSER WITH INTEGRAL STRAINER.

5. PHP-1, -2, -3: PROVIDE MANUFACTURER'S FLOOR-MOUNTED PUMP SUPPORT OR FIELD-INSTALLED PIPE MOUNT.

6. PROVIDE MAXIMUM POSSIBLE IMPELLER SIZE FOR THE NON-OVERLOADING RATING OF THE SPECIFIED MOTOR.

7. VFDs SHALL BE FURNISHED BY THE CONTROLS CONTRACTOR. SEE SPECIFICATIONS FOR VFD FEATURES; INCLUDE INTEGRAL DISCONNECT SWITCHES.

BOILER SCHEDULE

MARK FUEL TYPE

INPUT (MBH) THERMAL

EFFICIENCY

GROSS

OUTPUT

(MBH)

TURNDOWN

WATER SIDE ELEC TOTAL

WEIGHT (LB)

PHYSICAL DIMENSIONS BASIS OF DESIGN

FLOW

(GPM)

EWT

(°F)

LWT

(°F)

WIDTH

(IN.)

DEPTH

(IN.)

HEIGHT

(IN.) MANUFACTURER MODELMAX MIN V/PH/HZ

B-1 NATURAL GAS 2,500 167 87.0 2,175 15:1 218 160 180 460/3/60 2,000 28 55 78 AERCO BENCHMARK B-2 NATURAL GAS 2,500 167 87.0 2,175 15:1 218 160 180 460/3/60 2,000 28 55 78 AERCO BENCHMARK B-3 NATURAL GAS 2,500 167 87.0 2,175 15:1 218 160 180 460/3/60 2,000 28 55 78 AERCO BENCHMARK

NOTES:

1. COORDINATE WITH CONTROLS FOR EMERGENCY BOILER SHUTDOWN.

2. PROVIDE MOTORIZED ISOLATION VALVE.

3. PROVIDE BACNET IP GATEWAY FOR INTEGRATION TO BUILDING AUTOMATION SYSTEM.

4. PROVIDE CONDENSATE NEUTRALIZATION KIT.

5. PROVIDE INTEGRAL DISCONNECT SWITCH.

M.

C.

B

LA

NC

HA

RD

JU

DI

CI

AL

B

UI

LD

IN

G

BO

ILE

R

RE

PL

AC

EM

EN

T

PR

OJ

EC

T

0 W

ES

T

GO

VE

RN

ME

NT

S

TR

EE

T, P

EN

SA

CO

LA

, F

L 3

SEAL

NU

MB

ER

RE

VI

SI

ON

RE

VI

SI

ON

D

ES

CR

IP

TI

ON

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SHEET TITLE:

SHEET:

08-14-2026

EARLY RELEASE EQUIPMENT PACKAGE

P:

\2

6\

-0

M

C B la nc ha rd

B oi le r R ep la ce m en t P ro je ct \2

6-

2\ C on st ru ct s\ M

EC

H

AN

IC

AL

\M

EC

H

AN

IC

AL

.d w g/

8/

/2

6/ G re g

C la rk dell consulting MEP Engineering

Florida License Number 28404 129 E. Government Street

Pensacola, FL 32502 P:850-332-5687 F:850-332-6629

DELL CONSULTING PROJECT: 26-022

Jason A. Matiacio 75489

BGA

BGA

SCHEDULES

JAM

M-601

Sheets and Views
MECHANICAL-M-601

File details come from the government source that posted it. Updated .