BL013-24, H-21 Dam Outlet Control Structure Maintenance.

Awarded State & local contract opportunity Posted

Solicitation number
PE-77023-NONST-2024-000000083
State
Georgia
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

This state and local contract opportunity is for the rehabilitation of the existing primary spillway at the Haynes Creek Site No. 21 (H-21) Dam located in Gwinnett County, Georgia. The project includes the replacement of the outlet control structure's low-level gate, repair of the outlet plunge pool, clearing of vegetation, and resurfacing of the parking area. The solicitation is being issued by the Gwinnett County Board of Commissioners, and sealed bids will be accepted until January 19, 2024. A pre-bid conference is scheduled for January 4, 2024. The project has a substantial completion period of 210 days and a final completion period of 240 days. Contractors must have a current valid Utility Contractors License to perform the utility work. The County will award the contract to the lowest "qualified" bidder, with the right to reject any or all bids.

The bid documents require a 5% bid bond, and the successful bidder will be required to furnish a 100% performance and payment bond. The contract will be funded through the County's general fund budget, though the specific funding amounts are not provided. The bid tabulation indicates the recommended vendor is North Georgia Concrete, Inc., with a base bid of $1,117,201.68 and owner-directed items totaling $83,687.90, for an overall total of $1,200,889.58. No other details are provided regarding pricing terms, set asides, incumbents, or contract duration.

Opportunity text

Project provides for rehabilitation of the existing primary spillway at the Haynes Creek Site No. 21 (H-21) Dam. Rehabilitation of the primary spillway includes replacement of the outlet control structure¿s low-level gate and repair of the outlet plunge pool. The project also includes clearing of vegetation in areas including the toe of the dam and the dam¿s auxiliary spillway and resurfacing of the parking area at the site access point.

Files

File Type Posted
BL013_24 Award Notice.pdf PDF
BL013_24 Addendum No 1.pdf PDF
BL013_24 Notice.pdf PDF
BL013_24 Addendum No 2.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity