BL013_24 Award Notice.pdf

PDF 179 KB Posted

Attached to
BL013-24, H-21 Dam Outlet Control Structure Maintenance.
Solicitation number
PE-77023-NONST-2024-000000083
Issued by
Gwinnett County, Georgia

About this file

This document is a Bid Tabulation for contract BL013-24 H-21 Dam Outlet Control Structure Maintenance, issued by the Department of Water Resources. The contract includes items such as mobilization, construction survey, dewatering, erosion and sediment control, fish removal, demolition and installation of water control gates, excavation, earthfill, and rock riprap. The contract quantities include units such as lump sum, linear feet, acres, and tons. The recommended vendor is North Georgia Concrete, Inc.

The base bid items total $1,117,201.68, and the owner-directed items total $83,687.90, for an overall total of $1,200,889.58. The bid tabulation provides unit prices and total prices for each bid item. No other details are provided regarding pricing terms, set asides, incumbents, funding requirements, or contract duration.

View the file

Other files

File Type Posted
BL013_24 Notice.pdf PDF
BL013_24 Addendum No 2.pdf PDF
BL013_24 Addendum No 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TABULATION Page 1 of 1

BL013-24

H-21 Dam Outlet Control Structure Maintenance Department of Water Resources

ITEM # DESCRIPTION UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE

1 Mobilization / De-Mobilization (M&P Item #1) 1 LS $48,868.00 $48,868.00 $84,000.00 $84,000.00

2 Construction Survey (M&P Item #2) 1 LS $37,802.00 $37,802.00 $55,520.00 $55,520.00

3 Dewatering/Diversion/Control of Water (M&P Item #3) 1 LS $444,773.00 $444,773.00 $870,630.00 $870,630.00

4 Erosion, Sediment and Pollution Controls (M&P Item #4)

4a Silt Fence (Sd1) 2,000 LF $7.30 $14,600.00 $27.00 $54,000.00

4b Temporary Sediment Basin (Sd3) 1 EA $8,805.00 $8,805.00 $2,400.00 $2,400.00

4c Slope Stabilization (Ss) 0.4 AC $10,744.80 $4,297.92 $47,625.00 $19,050.00

4d Construction Exit (Co) 1 EA $6,096.00 $6,096.00 $4,800.00 $4,800.00

4e Turbidity Curtain (Tc) 1 EA $35,396.00 $35,396.00 $44,000.00 $44,000.00

4f Topsoiling (Tp) 2,200 SY $14.80 $32,560.00 $4.00 $8,800.00

4g Tree Protection (Tr) 450 LF $5.60 $2,520.00 $6.00 $2,700.00

4h Temporary Seeding (Ds2) 1.1 AC $3,360.00 $3,696.00 $4,000.00 $4,400.00

4i Permanent Seeding (Ds3) 0.9 AC $5,880.00 $5,292.00 $4,100.00 $3,690.00

4j Sodding (Ds4) 0.2 AC $80,755.80 $16,151.16 $73,843.00 $14,768.60

5 Fish Removal (M&P Item #5) 1 LS $15,038.00 $15,038.00 $25,640.00 $25,640.00

6 Clearing and Grubbing (M&P Item #6) 0.8 AC $74,832.00 $59,865.60 $95,400.00 $76,320.00

7 Demolition and/or Removal of Existing Water Control Gate and Riprap (M&P Item #7) 1 LS $30,474.00 $30,474.00 $175,000.00 $175,000.00

8 Installation of Boat Cleats (M&P Item #8) 1 LS $2,157.00 $2,157.00 $7,650.00 $7,650.00

9 Water Control Slide Gate (M&P Item #9) 1 EA $66,860.00 $66,860.00 $90,000.00 $90,000.00

10 Excavation (M&P Item #10) 500 CY $131.90 $65,950.00 $65.00 $32,500.00

11 Earthfill (M&P Item #11) 300 CY $245.40 $73,620.00 $65.00 $19,500.00

12 Rock Riprap (Type I) (M&P Item #12) 650 TONS $120.90 $78,585.00 $64.00 $41,600.00

13 Access Road Gate (M&P Item #13) 1 LS $9,235.00 $9,235.00 $7,000.00 $7,000.00

14 Asphalt Milling & Resurfacing (M&P Item #14) 1,100 SY $49.60 $54,560.00 $82.00 $90,200.00

15a Excavation 100 CY $131.90 $13,190.00 $65.00 $6,500.00

15b Earthfill 50 CY $245.40 $12,270.00 $65.00 $3,250.00

15c Rock Riprap (Type III) 150 TONS $99.40 $14,910.00 $64.00 $9,600.00

15d Seeding & Mulching 0.5 AC $5,880.00 $2,940.00 $2,260.00 $1,130.00

15e Sod 0.5 AC $80,755.80 $40,377.90 $73,843.00 $36,921.50

Recommended Vendor:

North Georgia Concrete, Inc.

Attn: Jeffrey Rudiger 85 Chestatee Industrial Park Drive Dahlonega, GA 30533 Phone: 706-867-1774 Jrudiger@northgeorgiaconcrete.com

$83,687.90 $57,401.50

PART 1 - BASE BID ITEMS

OVERALL TOTAL (PART 1 + PART 2) $1,791,570.10$1,200,889.58

PART 1 TOTAL $1,117,201.68 $1,734,168.60

PART 2 TOTAL

PART 2 - OWNER DIRECTED ITEMS

Ruby-Collins, Inc.

(OC)

APPROX.

QTY

North Georgia Concrete, Inc.

(OC)

mailto:Jrudiger@northgeorgiaconcrete.com

20240319161515434.pdf
BL013-24 Tab.pdf
Sheet1