BL013_24 Addendum No 2.pdf
PDF 17 MB Posted
- Solicitation number
- PE-77023-NONST-2024-000000083
- Issued by
- Gwinnett County, Georgia
About this file
Addendum No. 2 to Bid #BL013_24 is issued by the City of Springfield Department of Public Works. This addendum provides clarification and changes to the original bid solicitation for the Road Resurfacing Project.
The addendum modifies the Scope of Work to include an additional 2 miles of roadway for resurfacing. The total quantities have been updated to reflect the increased scope, with an additional 10,000 tons of asphalt now required. The bid submission deadline has been extended by 2 weeks to allow for the changes. A second mandatory pre-bid conference has been scheduled for interested contractors. The contract term remains 1 year with an option to renew for up to 2 additional 1-year terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BL013_24 Notice.pdf | ||
| BL013_24 Award Notice.pdf | ||
| BL013_24 Addendum No 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
January 16, 2024
Addendum No. 2
BL013-24
H-21 Dam Outlet Control Structure Maintenance
The following addition/changes modify the Bid No. BL013-24 “H-21 Dam Outlet Control Structure Maintenance” Contract Documents, dated December 2023, as first advertised on December 13, 2023.
I. Questions
Q1.
A1.
Q2.
A2.
Q3.
A3.
Q4.
A4.
Q5.
A5.
Q6.
A6.
Will Gwinnett be hiring the CMT for this job? Can you share the name of the PM so we can reach out directly if you do not know?
Gwinnett County will be hiring a Construction Materials Testing (CMT) firm. The CMT contractor will be selected at a later date from the list of contractors currently available under the Gwinnett County annual contract, and this contract will be implemented separately from BL013-24.
Please provide the plan holders list.
Please see Attachment A1.
How can bid documents be requested?
Bid documents and a plan holders list can be provided by Freese and Nichols at Jennifer.Gaines@Freese.com.
Are any bonds required for this project?
Yes, please see below from the Bid notice.
Bonding and Insurance:
All Bidders are required to submit a Bid Bond, or a certified check made payable to the Gwinnett County Board of Commissioners in the amount of five percent (5%) of the total amount bid. The Bid Bond or certified check must be enclosed in the envelope with the sealed bid. The successful bidder will be required to furnish a contract Performance Bond and Payment Bond, each in the sum of 100% of the total amount bid and provide insurance coverage as required by the contract documents.
Does the County want the access roads removed after completion or should they be left as is for future use?
If the contractor deems it necessary to construct additional access roadway stabilization within the existing project access limits, the contractor will be required prior to project completion to remove any placed material and repair/replace site vegetation to match existing conditions. Additionally, the contractor shall provide access road details to the Engineer and County for approval prior to placement of any material.
Will the project be awarded based on part 1 of the bid items or the grand total of part 1 and 2?
For the purposes of determining the total bid price and selecting a contractor, the total project cost is taken as the grand total of sections 1 and 2 from the bid form.
mailto:Jennifer.Gaines@Freese.com
BL013-24
Q7.
A7.
Q8.
A8.
Q9.
A9.
Q10.
A10.
Q11.
A11.
Q12.
A12.
Q13.
A13.
Is a temporary berm around the OCS required if the scheduled work can be completed within a few days?
Construction Specification 11 – Removal of Water requires that maintenance work associated with the low-level gate be performed in the dry. The minimum required level of protection is the 2-year, 6-hour storm event, as specified in Section 8(1)(i) of CS-11. The temporary berm depicted on Sheet ESCP-1 of the Construction Drawings is for representation purposes only. Other means of protection, such as sheet piling or bladder dams, may be selected at the Contractor’s discretion.
Will the dewatering plan be required to be designed and stamped by a PE along with hydrology calculations?
The dewatering plan does not require a PE stamp. The dewatering plan, however, should meet all requirements presented in the plans and in Construction Specification - 11 Removal of Water. The Design Engineer and County will review the proposed dewatering plan for compliance with the contract documents prior to implementation of any proposed water control methods.
Is NPDES monitoring required on this project and who is responsible for it?
The contractor is responsible for the implementation of the Erosion and Sedimentation Control Plan provided as part of the construction plans. This includes (but is not limited to) placement of all erosion control Best Management Practices (BMPs) shown on the design plans, performing all required maintenance to erosion control BMPs, performing required inspections of in service BMPs, collecting site rainfall information, and performing turbidity sampling as detailed in the design plans. The contractor shall also provide turbidity sampling reports; the County will then submit these reports to the state. The contractor is not responsible for filing the project Notice of Intent (NOI) and not responsible for paying the NOI fee.
Please furnish the full pool surface area of the lake.
At normal pool elevation the surface area of the reservoir is approximately 12 acres and at normal pool the volume is approximately 56 acre-ft.
When does the County anticipate issuing a notice to proceed for this project?
Gwinnett anticipates issuing a notice to proceed for the project after approval from the Gwinnett Board of Commissioners and all required contract documents have been finalized. This is anticipated to be in the timeframe of May 2024.
What is the budgeted amount for construction of this project?
There is approved funding for this project. Gwinnett County expects each contractor to bid a competitive price. Award will be made to the lowest responsive and responsible bidder.
Will the contractor be required to furnish a temporary field office for the County’s use during construction of this project?
A temporary field office is not required for this project.
BL013-24
Q14. What permits will be obtained and paid for by the contractor?
A14. The following permits shall be obtained by GCDWR or are not required for this project. We do not anticipate the Contractor will be required to obtain any additional permits.
• United States Army Corps of Engineers (USACE) Nationwide Permit 3 for Maintenance
• Gwinnett County Planning and Development – Floodplain Permitting
• Exemption
• US Fish and Wildlife Service (USFWS) coordination – Official Species List report
• National Resource Conservation Service (NRCS) coordination
• NPDES Construction General Permit
• Georgia Department of Natural Resources Stream Buffer Variance exemption
• Georgia Safe Dams Program Permitting
Q15. Will fish re-stocking be required under the contract for this project?
A15. Fish restocking is not required for this project.
Q16. General Civil Note 23 (Plan Sheet G-3) and the specifications for both “Summary of Work” and “Measurement and Payment” refer to installation of a concrete monument. Please provide details and site location for this monument.
A16. The concrete monument is not required for this project. The referenced specifications have been revised accordingly and are attached. Please see attachment A3.
Q17. Item 4c in the bid form (Slope Stabilization) has an estimated quantity of 0.4 SY. Should the units for this be acres instead of square yards?
A17. The estimated slope stabilization quantity is 0.4 acres, or about 1,650 square yards. The bid form has been updated accordingly. Please use the revised bid forms in attachment A2.
Q18. What is the required minimum downstream water flow to be maintained throughout the construction process?
A18. Normal baseflow should be maintained downstream of the project throughout construction. Normal baseflow is estimated to be on the order of 3 cfs.
II. Attachment A1. BL013-24 Plan Holders List.
A2. Updated Bid Form A3. Updated Project Specifications
Acknowledge receipt of this addendum on the firm information page of the request for proposal.
Sincerely, Brittany Bryant, CPPB Purchasing Associate III
FNI Project No. GWR20409 Gwinnett County, Georgia
Record List of Document Holders
Date of Request Name Title Company Email Date of Document Transmission Sent By 12/14/2023 John Zelenka Pursuit Manager Kiewit John.Zelenka@kiewit.com 12/14/2023 JChapman 12/14/2023 Jamaica Bejagan Content Specialist ConstructConnect Jamaica.Bejagan@ConstructConnect 12/14/2023 JChapman 12/14/2023 Nikki Carr Preconstruction Manager Ruby-Collins, Inc. ncarr@ruby-collins.com 12/14/2023 JChapman 12/14/2023 Jeff Rudiger North Georgia Concrete Inc. jrudiger@northgeorgiaconcrete.com 12/14/2023 JChapman 12/15/2023 Samee Blankinship Project Administrator Zion Marine sblankinship@zionmarine.com 12/15/2023 JChapman 12/15/2023 Kevin Whitehead Sequoia Services LLC kevin.w@seqserv.com 12/15/2023 JChapman 12/18/2023 Emily Gulledge Estimating Coordinator Crowder Construction Company egulledge@crowderusa.com 12/18/2023 JChapman 12/19/2023 Tammy Johnston SE Diving Services LLC sedivingllc007@gmail.com 12/20/2023 JChapman 12/21/2023 Amdy Armento Suncoast Group Aarmento@suncoast-group.com 12/22/2023 JChapman 12/22/2023 Beth Davis Hess Construction bethdavis.hessconstruction@gmail.com 12/22/2023 JChapman 12/28/2023 Ray Cline Cline Service Corp. clineserv@aol.com 12/28/2023 J Gaines 12/27/2023 Andrew Berselli Business Dev. Manager ATB Riva Calzoni USA, Inc. andrew.berselli@atbrc.com 12/28/2023 J Gaines 12/29/2023 Kyle Adkins Southeast Area Manager Ballard Marine Construction kyle.adkins@ballardmc.com 1/2/2024 JChapman
1/2/2024 Robby Bowen Aquatics Restoration Inc robbybowen@windstream.net 1/2/2024 JChapman 1/5/2024 Jamaica Bejagan Content Specialist ConstructConnect Jamaica.Bejagan@ConstructConnect 1/5/2024 J Gaines 1/9/2024 Cory Whiten Project Manager Metro Waterproofing, Inc. cory.whiten@metrowp.com 1/9/2024 J Gaines
BID FORM
BID NUMBER: BL013-24
BID DATE: JANUARY 19, 2024
COMPANY NAME:
BIDDER’S SIGNATURE:
Addendum #2 Revised Bid Form
4. Bidder submits the following unit price work bid prices for the H-21 Dam Outlet Control Structure Maintenance identified in Bid Form as part of this Bid. Work included within each Bid Item is described in the Specification Section listed for that Bid Item. Payment for each Bid Item is described in Contract Specification Section 01 22 15 – Measurement and Payment listed for that Bid Item.
BID SCHEDULE
BID
ITEM
NO.
SPEC.
SECTION
DESCRIPTION
ESTIMATED
QUANTITY
UNIT PRICE EXTENDED PRICE
PART 1 – BASE BID ITEMS
1 CS 8
Mobilization / De-mobilization (M&P Item #1)
1 LS $ $
2 CS 7 Construction Survey (M&P Item #2) 1 LS $ $
3 CS 11
Dewatering / Diversion / Control of Water (M&P Item #3)
1 LS $ $
4 CS 5
Erosion, Sediment and Pollution Controls (M&P Item #4)
4a Silt Fence (Sd1) 2,000 LF $ $
4b Temporary Sediment Basin (Sd3) 1 EA $ $
4c Slope Stabilization (Ss) 0.4 AC $ $
4d Construction Exit (Co) 1 EA $ $
4e Turbidity Curtain (Tc) 1 EA $ $
4f Topsoiling (Tp) 2,200 SY $ $
4g Tree Protection (Tr) 450 LF $ $
4h Temporary Seeding (Ds2) 1.1 AC $ $
4i Permanent Seeding (Ds3) 0.9 AC $ $
4j Sodding (Ds4) 0.2 AC $ $
5 10 89 01 Fish Removal (M&P Item #5) 1 LS $ $
6 CS 2 Clearing and Grubbing (M&P Item #6) 0.8 AC $ $
7 CS 3
Demolition and/or Removal of Existing Water Control Gate and Riprap (M&P Item #7)
1 LS $ $
8 CS 81
Installation of Boat Cleats (M&P Item #8)
1 LS
BID FORM
BID NUMBER: BL013-24
BID DATE: JANUARY 19, 2024
COMPANY NAME:
BIDDER’S SIGNATURE:
Addendum #2 Revised Bid Form
BID SCHEDULE CONTINUED
*M&P: Measurement & Payment Item #
BID
ITEM
NO.
SPEC.
SECTION
DESCRIPTION
ESTIMATED
QUANTITY
UNIT PRICE EXTENDED PRICE
9 CS 71 Water Control Slide Gate (M&P Item #9) 1 EA $ $
10 CS 21 Excavation (M&P Item #10) 500 CY $ $
11 CS 23 Earthfill (M&P Item #11) 300CY $ $
12 25, 61, 95 Rock Riprap (Type I) (M&P Item #12) 650 TONS
13 92 Access Road Gate (M&P Item #13) 1 LS $ $
14 32 12 16 Asphalt Milling & Resurfacing (M&P Item #14)
1,100 SY $ $
PART 1 TOTAL $
PART 2 – OWNER-DIRECTED ITEMS
15a Excavation 100 CY $ $
15b Earthfill 50 CY $ $
15c Rock Riprap (Type III) 150 TONS $ $
15d Seeding & Mulching 0.5 AC $ $
15e Sod 0.5 AC $ $
PART 2 TOTAL $
OVERALL TOTAL (PART 1 + PART 2) $
Maintenance Project for
Haynes Creek Site 21 Outlet Works
Project Specifications
November 8, 2023
Prepared For:
Gwinnett County Department of Water Resources
684 Winder Highway Lawrenceville, Georgia 30045
(678) 376-6700
Prepared By:
GA Registered Engineering Firm PEF004433
Freese and Nichols, Inc.
2180 Satellite Blvd, Suite 235 Duluth, Georgia 30097
(470) 645-3092
Maintenance Project for Haynes Creek Site 21 Outlet Works
TABLE OF CONTENTS
Project Specifications
Division 01
Section Title 01 00 00 01 11 00 01 22 15 01 26 00 01 29 00 01 31 19 01 32 33 01 33 00 01 41 00 01 42 19 01 43 00 01 45 29 01 50 00 01 65 00 01 66 00 01 74 19 01 74 23 01 78 36 01 78 39
General Requirements Summary of Work Measurement and Payment Change Management Application for Payment Procedures Project Meetings Photographic Documentation Submittal Procedures Regulatory Requirements Reference Standards Quality Assurance Testing Laboratory Services Temporary Facilities and Controls Product Delivery Requirements Product Storage and Handling Requirements Construction Waste Management and Disposal Final Cleaning Warranties Project Record Documents
Division 10
Section Title 10 89 01 Fish Stocking and Removal
Division 32
Section Title 32 12 16 Asphalt Paving
Maintenance Project for Haynes Creek Site 21 Outlet Works
Technical Specifications
Construction Specifications
Section Title 2 Clearing and Grubbing 3 Structural Removal 5 Pollution Control 6 Seeding, Sprigging, and Mulching 7 Construction Surveys 8 Mobilization and Demobilization 11 Removal of Water 21 Excavation
Earthfill Rockfill
26 Topsoiling 61 Rock Riprap 71 Water Control Gates 81 Metal Fabrication and Installation 92 Field Fence 94 Contractor Quality Control 95 Geotextile
Material Specifications
Section Title 521 Aggregates for Drainfill and Filters 523 Rock for Riprap 571 Slide Gates 581 Metal 582 Galvanizing 591 Field Fencing Material 592 Geotextile
Maintenance Project for Haynes Creek Site H-21 Outlet Works November 2023
01 00 00-1
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 – GENERAL
1.1 SUMMARY
A. SECTION INCLUDES:
Section Title
1.2 References
1.3 Definitions
1.4 System Description
1.5 Contract Drawings
1.6 Schedules
1.7 Or Equals
1.8 Submittals
3.1 Access
3.2 Aid to the Injured
3.3 Buildings and Shanties
3.4 Cleaning
3.5 Cleaning and Crowning of Streets
3.6 Cleaning Surfaces
3.7 Contractor’s Office
3.8 Dimensions and Elevations
3.9 Emergency Response
3.10 Environmental Contamination
3.11 Existing Irrigation and Sprinkler Systems
3.12 Existing Utilities
3.13 Inspections
3.14 Insufficiency of Safety Precautions
3.15 Intoxicating Substances
3.16 Landscape Protection
3.17 Lighting
3.18 Means and Methods
3.19 Measures and Weights
3.20 Mill and Shop Tests and Inspection
3.21 Monuments and Landmarks
3.22 Obstructions Encountered
3.23 Overtime Work
3.24 Ownership of Materials
3.25 Painting and Coatings
3.26 Power
3.27 Protecting Existing Buildings and Structures
3.28 Protection
3.29 Record Drawings
3.30 Roadway Right-of-Way, Working Facilities, and Easements
3.31 Safety
3.32 Sales Tax
3.33 Sanitary Measures.
3.34 Schedules
3.35 Shoring, Formwork, and Temporary Structures
3.36 Site Video
3.37 Sound Attenuation
01 00 00-2
3.38 Storage
3.39 Temporary Heat
3.40 Use of Facilities
3.41 Use of Streets
3.42 Utility Relocations or Modifications
3.43 Water Supply
3.44 Work in Inclement Weather
1.2 REFERENCES
A. Unless otherwise specified, references to documents shall mean the documents in effect at the time of Advertisement for Bids or Invitation to Bid (or on the effective date of the Agreement if there were no bids). If referenced documents have been discontinued by the issuing organization, references to those documents shall mean the replacement documents issued or otherwise identified by that organization or, if there are no replacement documents, the last version of the documents before it was discontinued shall apply.
1.3 DEFINITIONS
A. Whenever the following abbreviations are used, they shall refer to and designate:
“ACI” - American Concrete Institute “AISC” - American Institute of Steel Construction “ANSI” - American National Standards Institute “ASME” - American Society of Mechanical Engineers “ASTM” - American Society for Testing and Materials “AWWA” - American Water Works Association “GCDOT” – Gwinnett County Department of Transportation “GCDWR” – Gwinnett County Department of Water Resources “GDOT” – Georgia Department of Transportation “SDP” – Safe Dams Program of the State of Georgia Environmental Protection Agency
1.4 SYSTEM DESCRIPTION
A. Performance Requirements
The Work shall be comprised of and for the construction of GCDWR infrastructure as identified in the Bid Schedule, including but not limited to, safety, installation, connections, sterilizing, testing, and fabrication with any and all appurtenances in accordance with the Contract Documents, complete and fully operational in compliance with federal, state, county, and local codes and regulations, standards, and specifications as applicable at the time of bid unless otherwise directed in writing by GCDWR.
1.5 CONTRACT DRAWINGS
A. Existing conditions shown on the Contract Drawings were derived from the best available information at the time and preparation of the Contract Documents and do not purport to be completely correct. The Contractor is therefore directed to perform any and all field surveys that are deemed necessary to satisfy the Contractor to the actual surface and sub-surface conditions prior to submitting his/her bid, upon which his/her bid shall be based.
B. The Work proposed, its connections, routing, and design intent was based on the available information of the existing conditions. The Contractor shall field verify the nature and extent of the Work proposed prior to ordering any materials. No payment shall be authorized for materials not retained as part of GCDWR facilities and its appurtenances.
C. Additionally, GCDWR reserves the right to require deviations from the Contract during construction where such deviations are deemed necessary to provide for future connections or to provide flexibility in the maintenance and operation of the system and increase the efficiency and reliability of service to its customers. Deviations will be addressed using contract unit prices. If this cannot be accomplished see Article 10 of the General Conditions.
01 00 00-3
D. The Contractor shall maintain, on site, one (1) complete set of Contract Documents throughout the course of the Work and make available upon request by GCDWR or SDP.
1.6 SCHEDULES
A. Contractor shall prepare, furnish, distribute, and periodically update the Project Progress Schedule and Schedule of Submittals, as specified herein. Contractor shall also prepare and furnish a Schedule of Values, as specified herein.
B. Acceptance of the Contractor’s Project Progress Schedule, Schedule of Submittals, and Schedule of Values, and revisions thereto, shall in no way relieve Contractor of any duties and obligations under the Agreement. Such approval is limited to the format of the schedule, and does not in any way indicate approval of, or concurrence with, the Contractor’s means, methods, and ability to carry out the Work.
C. Submit a monthly update of the Project Progress Schedule and Schedule of Submittals with each request for payment.
D. Failure of the Contractor to meet the schedule submission milestones will result in withholding of monthly payments, until deliverables associated with the milestones are received. Payments will be withheld should the Contractor fail to deliver acceptable schedules within thirty (30) days after date of Notice to Proceed.
1.7 OR EQUALS
A. For the purposes of these Contract Documents, “or equal” item(s) shall be defined as:
1. A product or manufacturer offered as a replacement to a specified product or manufacturer where the term “or equal” is included after the list of acceptable manufacturers in the Specification.
B. An item which is offered where no specific product, manufacturer, means, methods, technique, sequence, or procedure of construction is specified or shown on the Drawings, shall not be considered a replacement, and shall be at the option of the Contractor, subject to the provisions in the Contract Documents for that item.
C. For products specified only by a referenced standard, the Contractor may select any product by any manufacturer, which meets the requirements of the Specifications, unless indicated otherwise in the Contract Documents.
D. If the manufacturer is named on the Drawings, or in the Specifications as an acceptable manufacturer, products of that manufacturer meeting all requirements of the Specifications and Drawings are acceptable.
E. Whenever the design is based on a specific product of a particular manufacturer, that manufacturer will be shown on the Drawings and/or listed in the list of approved manufacturers in the Specifications. Any Contractor intending to furnish products other than the listed acceptable manufacturer(s) shall:
1. Verify that the item being furnished will fit in the space allowed, perform the same function(s), and have the same capabilities as the item specified,
2. Include in the item price the cost of all accessory items, which may be required by the “or equal” product,
3. Include the cost of any architectural, structural, mechanical, piping, electrical, instrumentation, or other modifications required, and
4. Include the cost of required additional work by the Engineer, if any, to accommodate the item.
F. Approval by the Engineer and Owner of an “or equal” item as an acceptable manufacturer, is dependent on determination that the product offered:
1. Is essentially equal in function, performance, quality of manufacture, ease of maintenance, reliability, service life, availability of local technical support, and other criteria to that on which the design is based, and
2. Will require no major modifications to structures, electrical systems, control systems, or piping systems.
G. “Or equal” items will be considered only if the term “or equal” is included after the list of acceptable manufacturers in the Specification.
01 00 00-4
H. The Contractor shall submit shop drawings on the “or equal” item for the Engineer’s review in accordance with Specification Section 01 33 23 Submittal Procedures.
I. The cost of Engineer’s and Owner’s factory inspection, reference project tour, or mill inspection, required to evaluate the acceptance of the “or equal” product shall be borne by the Contractor.
1.8 SUBMITTALS
A. Specified submittals shall be to the Engineer, and submitted by the Contractor only, (i.e. NOT subcontractors, vendors, suppliers, etc.).
B. Each submittal, with variations from the requirements of the Contract Documents, shall make specific mention of such variations. Those declared variations found acceptable by the Engineer or GCDWR shall require the Contractor to take suitable action for the proper installation in accordance with the Contract Documents.
Variation not declared or suitable action not taken by the Contractor shall not relieve Contractor of error or the responsibility for executing the Work, and cost for remedial actions deemed necessary by the Engineer or
GCDWR.
PART 2 – PRODUCTS – (NOT USED)
PART 3 – EXECUTION
3.1 ACCESS
A. The Contractor shall enable and facilitate access to all parts of the Work to GCDWR and third parties to inspect, certify, or observe when required by law; or to those who require reasonable access to the Work by reason of specific contractual relationship to the Work.
3.2 AID TO THE INJURED
A. The Contractor shall furnish, maintain, and make ready and available for immediate use, first aid to the injured with standing arrangements for the immediate removal, transport, and hospital treatment of any personnel who may be injured on the Work, as required by federal, state, county and local laws, codes and regulations.
3.3 BUILDINGS AND SHANTIES
A. No provision shall be allowed for the housing of men/women employed for the Work on land owned or leased by the County, unless a permit in writing is secured from GCDWR. Should permission be asked and granted, the Contractor shall comply with all regulations regarding the construction and maintenance of such buildings.
3.4 CLEANING
A. With completion of the Work, the Contractor shall return the surface conditions of the work area to pre-work status, unless where otherwise specified in the Contract Documents. The finished surface Work shall leave the grounds in a neat and approved condition, including but not limited to, the removal of material, debris, equipment, structures, and the Contractor’s office.
B. Contractor shall terminate all temporary utilities as applicable or as required by the Contract Documents.
Contractor shall also clean out all drains, pipes, inlets, and miscellaneous and appurtenant structures of debris from his/her operations.
3.5 CLEANING AND CROWNING OF STREETS
As Work progresses and before the Work herein specified is accepted, the Contractor shall, upon notice from GCDWR, thoroughly clean all streets, roads, sidewalks, and lawns free from all debris and dirt accumulating from the construction, shall open all gutters so that free drainage may be had, and on unpaved streets and roads, shall completely crown the roadway within the limits of the herein specified Work.
01 00 00-5
3.6 CLEANING SURFACES
A. Contact surfaces between existing and new Work shall be free from debris, dirt, grease, or foreign matter to the extent of wire brushing and washing, and such surface preparation as recommended by the manufacturer or directed by GCDWR. The cost for cleaning shall be included in the Prices Bid and stipulated for the various items of the bid.
3.7 CONTRACTOR’S OFFICE
A. Facilities are not required to be on the project site. The Contractor may provide adequate indoor facilities for conducting project meetings; and at a minimum shall be equipped with power, water, lighting, heating ventilation and air conditioning, and a meeting area with table and chairs. If in the opinion of GCDWR, the location of the facility is not convenient to project personnel, GCDWR may provide suitable facilities for project meetings.
3.8 DIMENSIONS AND ELEVATIONS
A. In the Contract Documents, figured dimensions shall take precedence over scaled dimensions, detailed drawings shall take precedence over general drawings, and elevations and slopes shall be as indicated on the Drawings, or as directed by the Engineer.
3.9 EMERGENCY RESPONSE
A. The Contractor shall respond within four (4) hours to any emergency that may arise in connection with the Work on a twenty-four (24) hour per day, seven (7) days per week basis. Should County maintenance forces be called upon by the County to rectify a problem created by the Contractor, the Contractor shall be responsible for all costs incurred by the County, plus twenty-five (25) percent, with a minimum charge of one hundred
(100) dollars per occurrence. This charge is subject to change depending upon the severity of the emergency and will be determined by Gwinnett County.
3.10 ENVIRONMENTAL CONTAMINATION
A. Precautions against property endangerment and/or damages from water, sewage, seepage, storm, stormwater, and flood flows shall be active during the course of Work. Cost for precautions shall be included in the Prices Bid and stipulated for the items of Work.
3.11 EXISTING IRRIGATION AND SPRINKLER SYSTEMS
A. The Contractor shall be responsible for restoring the soundness to any portion of an existing irrigation or sprinkler system disturbed and/or damaged by the Work. No compensation shall be made for this Work.
3.12 EXISTING UTILITIES
A. Existing utilities shall be maintained, except when a utility or a utility feature requires moving. In such circumstances, the Contractor shall notify the utility before any such Work is started for approval. In the event that the utility grants approval for such movement that results in damage, it shall be repaired by the authorities having control of the same, and the expense of said repairs shall be paid by the Contractor or deducted from the monies which are due or to become due to said Contractor. No underground or overhead facilities encountered shall be disturbed without proper authority and then only in such manner as said owner may prescribe and approve.
Should it become necessary to change the position, or permanently or temporarily remove part of a utility in order to clear the structure being built or to permit the Contractor to use a particular method of construction, the Contractor shall notify GCDWR of the location and circumstances and shall cease work if necessary, until satisfactory arrangements have been made by the Owners of the said utility to properly care for or relocate the same as necessary to permit the Work to proceed as specified. No claims for damages shall be allowed the Contractor on account of any delay occasioned thereby. The entire cost of the changes or temporary or permanent removal of such utilities shall be borne by the Contractor and the cost thereof shall be included in the Prices Bid and stipulated for the various Items of the Bid.
01 00 00-6
B. Nothing contained herein shall relieve the Contractor of doing such Work at his cost and expense as is specifically included in the Contract Documents.
C. Anything contained herein shall not relieve the Contractor of his obligation to support and protect all pipes, conduits, and other structures which may be encountered during the construction of Work, and to make good all damages done to such pipes, conduits, and other structures, as provided in this specification. Any such damages must be repaired without delay and the cost of such repairs must be borne by the Contractor.
3.13 INSPECTIONS
A. GCDWR shall schedule a pre-construction meeting with the Contractor a minimum of 24-hours prior to construction. During construction the GCDWR Inspector shall be the lead person for witnessing construction including, but not limited to, taps, cores, bores, wet cut-ins, flow diversions, shutdowns, testing, chlorination, sampling and work that may be required or determined necessary by the Engineer. Should existing conditions necessitate a change or cost to the Contract Documents, the GCDWR Project Manager shall be notified for approval prior to proceeding.
B. The GCDWR Inspector shall review and approve quantities of unit items installed and/or materials stored in the Work by the Contractor prior to Contractor’s submittal for payment to GCDWR Project Manager. Failure to do so may result in delays in processing payments.
C. Upon notification by the Contractor, GCDWR shall perform an inspection of the finished surface features and conditions for acceptance of the Work. Should discrepancies exist, the Contractor shall make restorations as directed, until acceptance is granted by GCDWR, upon which final payment shall be made for the Work.
D. Contractor shall pay for second inspections, if so required by the County.
3.14 INSUFFICIENCY OF SAFETY PRECAUTIONS
A. If at any time, in the opinion of the County, the Work is not properly instituted or maintained and is not in accordance with federal, state, county and local laws, codes and regulations, the Contractor shall execute immediate measures to bring into compliance unsatisfactory surroundings. In the event that the Contractor is not readily available at the Work to be notified of the insufficiency of safety precautions, then the County may elect to institute or restore such Work to a state deemed safe. Such actions by the County shall in no way release the Contractor from judiciary duty specified. Costs to correct safety precautions shall be at the Contractor’s expense.
3.15 INTOXICATING SUBSTANCES
A. The Contractor shall neither permit nor suffer the introduction or use of intoxicating substances, such as but not limited to, alcohol or illegal drugs upon or about the Work jobsite.
3.16 LANDSCAPE PROTECTION
A. Landscaping, such as but not limited to, ornamental trees, shrubbery, hedges, flower beds, decorative berms, decorative rocks, ponds, timbers, and their appurtenances shall not be removed or disturbed without approval from GCDWR. However, should it be required to remove or disturb such items, the Contractor shall seek approval no later then 72 hours in advance of conflict. If and when approval is granted by GCDWR, the Contractor shall take the proper precautions to preserve, protect, and reestablish such items along the line of or contiguous to the Work. All landscaping shall be restored to the same or better general conditions as existed prior to commencement of the Work. If deemed by GCDWR to be damaged, each item damaged shall be replaced with the same type and like size. Cost for removal and relocation shall be considered as having been included in the Prices Bid and stipulated for the various items of Work. Cost for restitution shall be borne by the Contractor.
3.17 LIGHTING
A. Except for acts of nature, the Work shall be secured by such means to prevent loss to health, limb, and property. Adequate lighting shall be provided and maintained during periods of Overtime Work, from one-half (½) hour before sunset to one-half (½) hour after sunrise. Contractor shall provide adequate lighting for safety
01 00 00-7 and performance of construction operations and provide the necessary safety and other facilities required for work during normal working hours and for work at night.
3.18 MEANS AND METHODS
A. Unless otherwise expressly provided in the Contract Documents, the means and methods of construction shall be such as the Contractor may choose. However, GCDWR maintains the right to reject or alter the Contractor’s proposed means and methods, which shall not produce finished Work in accordance with the terms of the Contract, or to GCDWR right as administrator of the construction to direct the Contractor to more stringent means or methods.
B. If determined by GCDWR that the Contractor’s work methods, features, and/or equipment appears to be unsafe, insufficient, or improper, GCDWR may order the Contractor to improve their safety, sufficiency, and/or character, whereby the Contractor shall conform to such orders; but should GCDWR not demand any increase of such safety precautions, insufficiency, inadequacy or any improvement shall not release the Contractor from his obligation to secure the work methods, safety precautions, work features, and/or equipment for the safe conduct and quality of work specified, and shall not constitute a cause of action for damages.
C. The Contractor shall have the right to deny access to the Work during construction, except to GCDWR and third parties to inspect, certify, or observe when required by law; or to those who require reasonable access to the Work by reason of specific contractual relationship to the Work.
3.19 MEASURES AND WEIGHTS
A. Whenever so requested as deemed necessary by GCDWR, the Contractor shall provide accurate scales, adequate equipment, and the necessary assistance for weighing and/or measuring materials for the installed Work as specified. It is understood and agreed that a “ton” shall mean the short ton of two thousand (2,000) pounds.
3.20 MILL AND SHOP TESTS AND INSPECTION
A. Where the specifications call for mill or shop tests, the Contractor shall furnish triplicate copies of attested certificates signed by a duly authorized representative of the manufacturer, showing details of quality or performance sufficient to demonstrate compliance with the Contract Documents. Inspection of materials shall be made as required by these specifications.
3.21 MONUMENTS AND LANDMARKS
A. Monuments or landmarks shall not be damaged or removed by the Contractor or any of his/her employees without the written consent of GCDWR. Any monument or landmark so removed shall be replaced by GCDWR at the expense of the Contractor. The cost thereof shall be retained from the monies due or to become due the Contractor under this agreement.
3.22 OBSTRUCTION ENCOUNTERED
A. The giving of this information upon the Work Assignment Contract Drawings shall not relieve the Contractor of his/her obligation to support and protect all pipes, conduits, and other structures which may be encountered during the construction of Work, and to make good all damages done to such pipes, conduits, and other structures, as provided in this Specification. The Contractor shall locate obstructions ahead of the Work.
Should the Contractor determine that the existing information is not correct, and an obstruction shall be encountered, he/she shall immediately contact GCDWR.
3.23 OVERTIME WORK
It is the intent of the contract that the Contractor provide sufficient work force at all times during normal working hours and days of each week to complete the Work without resorting to overtime work. The definition of normal working hours and days is an eight (8) hour day, Monday through Friday, Gwinnett County-recognized legal holidays excepted, during a consecutive period as agreed upon in the area of the Work, not counting the lunch period; and the definition of normal work week is the aggregate of the five (5) consecutive eight (8) hour days, Monday through Friday inclusive, maximum, the same holidays excepted.
01 00 00-8
A. Night work or work on Saturdays, Sundays, or Gwinnett County-recognized legal holidays, requiring the presence of GCDWR personnel or an inspector, shall not be permitted except in case of emergency, and then only to such extent as is absolutely necessary, and with the written permission of GCDWR.
B. Should the Contractor, for his/her convenience, request permission to work overtime or to work on Saturdays, Sundays, or trade recognized legal holidays in the area of the Work, the County shall have the right to deduct sufficient sums from the monies due the Contractor to cover payment of additional salaries for the GCDWR personnel as are normally employed on the Work.
C. Should it become necessary for Work to be accomplished at the direction of GCDWR for the convenience and/or requirement of the GCDWR outside of normal working hours, then full inspection and engineering shall be provided at no additional cost to the Contractor during those hours.
D. During periods of overtime work, the Contractor shall provide the necessary facilities required for work during normal working hours and for work at night. The Contractor shall be in readiness in time of emergency even nights, Saturdays, Sundays, and holidays at no cost to the County.
3.24 OWNERSHIP OF MATERIALS
A. Existing material removed that shall not be relocated or reused in the Work shall be moved off site within 48 hours, becoming the property of the Contractor. The cost for such Work shall be as stipulated by the Prices Bid, for the various items of the Work.
B. Existing material recovered that shall be relocated or reused in the Work shall be refurbished or renovated as required, unless otherwise directed by GCDWR.
C. Existing material removed shall be disposed of in a manner approved by GCDWR at the Contractor’s expense.
D. New material not installed in the Work shall be moved offsite and remain the property of the Contractor. Only material that is installed by the Contractor will be paid for. However, the Contractor may submit pay applications for stored material in accordance with Section 14.02 of the General Conditions.
E. All manhole covers, salvaged fire hydrants and any other material bearing the name of Gwinnett County shall be returned to GCDWR.
3.25 PAINTING AND COATINGS
A. It is the intention of these specifications that metal permanently installed in the Work shall be protected by a durable coating of paint, or other approved material, and that all such metal surfaces not buried in the earth or masonry shall be left clean and well painted at the completion of the Contract, and in accordance with detailed requirements as may hereinafter be set forth.
3.26 POWER
A. The Contractor shall make his/her own arrangements for power. No payment shall be made for cost of obtaining power. The cost for power shall be as stipulated by the Prices Bid, for the various items of the Work.
3.27 PROTECTING EXISTING BUILDINGS AND STRUCTURES
The Contractor shall take the necessary precautions to protect, including but not limited to, buildings, bridges, structures, and substantial walls or fences which may be encountered or endangered in the execution of the Work, not otherwise provided for, shall repair and make good any damages caused by reason of his operations and restore such property to its state before the damages. Existing walls and fences that are removed due to the execution of the Work shall be replaced by the Contractor and, where required or directed by GCDWR, temporary fencing shall be installed by the Contractor. No payment shall be made for said Work or material.
3.28 PROTECTION
A. The Contractor shall furnish and maintain satisfactory protection to the Work against injury by weather, flooding, or breakage thereby permitting all Work to be left in a perfect condition at the completion of the Work.
01 00 00-9
3.29 RECORD DRAWINGS
A. The Contractor shall be furnished one set of Contract Drawings for the purpose of recording information on the as installed Work, as specified in Section 01 78 39 Project Record Documents. The information shall be correct and presented on the Drawings and returned to GCDWR for acceptance.
B. The Contractor shall provide Georgia State Plane, West Zone GPS coordinates for all appurtenances (fire hydrants, manholes, junction boxes, valves (new or existing), etc.) associated with the work.
3.30 ROADWAY RIGHT-OF-WAY, WORKING FACILITIES, AND EASEMENTS
A. Work within the limits of private property and rights-of-way, shall be done in conformity with all applicable permits and agreements with the County and the owners of such private property, easements, or rights-of-way. Whether or not such a condition be part of the agreement, care shall be taken to avoid injury to the premises entered, which premises shall be left in a neat and orderly condition by the removal of rubbish and the grading of surplus materials, and the restoration of said private property to the same or better general conditions as at the time of entry for Work to be performed under this contract. The Contractor shall not enter any easement without first confirming with GCDWR that such easement is fully executed.
B. The Contractor shall not (except after consent from the proper parties), enter or occupy with labor, tools, or equipment on any land outside the rights-of-way or property of the County.
C. The Contractor shall be allowed use of the site designated for construction as necessary for the Work.
However, existing access to properties shall be maintained or adequate access provided during the course of the Work. Cost for access shall be included in the Prices Bid and stipulated for the various items of the Work to be done under this contract.
D. Work that shall be performed on private property or easements that requires granted access beyond the established road right-of-ways shall be done in conformity with all permits and agreements between Gwinnett County and property owners. Should the Contractor desire or require additional space outside the limits of Work, he/she must arrange for such space with property and easement owners at his/her own expense. Legal binding agreements for such additional space must be in writing and a copy filed with GCDWR, prior to accessing such lands. In such agreements, care shall be taken to avoid injury to the premises entered and shall be left in a neat and orderly condition as existed at the time of entry for Work.
E. When working on easements, the Contractor shall install Tree Save Barriers along all boundaries of the work area, unless otherwise specifically directed by GCDWR, prior to any Work. Work premises shall be left in a neat and orderly condition by the removal of rubbish, debris, and the grading of surplus materials and the restoration of said private property to the same general conditions as existed at the time of entry for Work.
3.31 SAFETY
A. Unless otherwise specified, all federal, state and county regulations shall be maintained during the course of the Work.
3.32 SALES TAX
A. The Contractor shall furnish GCDWR with certified copies of paid invoices or their equivalent proof covering sales tax paid on items which GCDWR is eligible for tax refund; none of which shall be refunded or credited to the Contractor.
3.33 SANITARY MEASURES
Sanitary conveniences shall be employed prior to beginning the Work in sufficient number, in such manner and in such places as shall satisfy GCDWR. Such sanitary conveniences shall be operated and maintained in such a manner as to remove harmful effects to personnel or environment. All persons connected with the Work are obliged to use the conveniences provided and shall in no way violate these provisions. Violations shall result in an immediate dismissal of the employee and removal from the Work. Only upon written consent by GCDWR shall the violator regain access to the Work. Sanitary conveniences shall be maintained during the Work and in compliance with the local Health Department and GCDWR. When possible, sanitary conveniences shall be
01 00 00-10 placed in locations that least impact public view. Upon completion of the Work, the Contractor shall remove sanitary conveniences without deleterious effect.
3.34 SCHEDULES
A. The Project Progress Schedule shall be plotted on a minimum eleven-inch by seventeen-inch (11” x 17”) size sheets with the flow of activities from left to right. Printing shall be in color and suitable for half-size reproduction. No lettering or numbering shall be less than one-eighth-inch (1/8”) in height for capital letters and numbers. The critical path shall be clearly marked and readily identifiable.
B. The Project Progress Schedule shall be a Critical Path Method (CPM) Network Diagram, and include:
1. Furnish an updated diagram with all activities and restraints. This includes providing an “As-Built” Schedule with completion dates for all key monthly completion and delivery dates,
2. Provide updated Project Progress Schedule graphics in color showing progress-to-date and completion schedule. The critical path shall be clearly identified,
3. A legend clearly identifying each symbol used,
4. Be prepared in the form of a time-scaled CPM network,
5. Group activities by facility and major area of work. The identification number of the individual activities shall be coded such to provide the grouping,
6. Be prepared in chronological order of the beginning of each item of work,
7. Have a horizontal time scale based on calendar days and identify the Monday of each week,
8. Show the order and interdependencies of the activities and the sequence in which the work is to be accomplished as planned by the Contractor. The diagram shall show how the start of a given activity is dependent upon the completion of the preceding activities, and how its completion restricts the start of following activities. Float need not be shown on the network diagram,
9. Show all activities relating to the construction of the work, and include the following information related to the activities:
a. Activity number
b. Activity description
c. Percent complete
d. Estimated duration, in working days, of each activity
e. Start date
f. Finish date
10. Show all planned facility shutdowns, including temporary relocations, temporary bypasses, and transitions from existing to temporary, temporary to new, and the like.
a. For each anticipated shutdown included in the schedule, submit within thirty (30) days prior to the planned shutdown, a description of the shutdown, duration, anticipated start and completion dates, related preparation work, and related temporary facilities to be provided.
11. Show adverse weather days on the critical path.
a. The number of adverse weather days per month shown on the critical path of the schedule shall not be less than the mean number of days for that particular month, in which precipitation meets or exceeds 1/10-inch, liquid measure.
b. The mean number of days in which the precipitation meets or exceeds 1/10-inch, liquid measure, will be based upon a thirty (30) year average of precipitation recorded and described by the National Oceanic and Atmospheric Administration (NOAA).
01 00 00-11
c. The total number of adverse weather days shall be monitored and agreed to monthly by Contractor, Engineer, and Owner. The Project Progress Schedule shall be updated to reflect the accrual of adverse weather days agreed to and enacted by a Contract Time extension.
12. Show the following for specified submittals of Shop Drawings, product data, samples, and materials:
a. Submittal date,
b. Review period, based on fourteen (14) calendar day review period,
c. Fabrication duration,
d. Delivery dates.
13. Show the following events and milestones in addition to construction activities:
a. Notice to Proceed,
b. Milestones,
c. Schedule of Submittals
d. Operational Testing (including air testing, chlorination, CCTV, etc.)
e. Owner coordination
f. Notification Periods
g. Coordination with separate contracts/contractors
h. Owner activities impacting the Work.
C. The Project Progress Schedule update shall coincide with the end of the pay period. The update shall be used to create the monthly payment application request. No monthly payment request will be processed unless the Project Progress Schedule is updated and submitted to the Engineer.
D. The Schedule of Values shall be of the following form:
1. Type schedule on eight and one-half –inch by eleven-inch (8½” x 11”) white paper,
2. Contractor’s standard forms and automated printouts may be used,
3. Identify Schedule of Values information with:
a. Title of Project
b. Project Location
c. Purchase Order Number
d. Name of Engineer Firm
e. Name and Address of Contractor
f. Bid Number (BL)
g. Date of Submission
E. The Schedule of Values shall list the installed value of the component parts of the Work in sufficient detail to serve as a basis for computing values for progress payments during construction. Breakdown shall be by utility, then by CSI Format, for ease of field verification of quantities completed.
F. For Schedule of Values, follow the Bid Form as the format for listing component items. Identify each item with number and title of the respective major section of the Specifications.
G. For each major line item, list sub values of major products or operations under the item.
H. For the various portions of the Work:
1. Each item shall include a directly proportional amount of the Contractor’s overhead and profit.
2. For items on which progress payments will be requested for stored materials, breakdown the value into:
01 00 00-12
a. The delivered and unloaded cost of the materials, with taxes paid. Owner shall require invoices for proof of purchase.
b.
This is the start of the file's text. The full file is on GovTribe.