Bird Island Cove Shoreline Protection Phase II CEPRA Project No. 1713

Closed State & local contract opportunity Posted

Solicitation number
RFP2524-LP
State
Texas
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 49

Opportunity details come from txsmartbuy.com. Updated .

About this opportunity

The Texas General Land Office (GLO) is seeking a highly skilled contractor to provide coastal construction services for the Bird Island Cove Shoreline Protection Phase II CEPRA Project No. 1713 in Galveston County, Texas. The project involves the construction of approximately 8,836 linear feet of rock breakwater to protect and enhance the existing estuarine habitats within Bird Island Cove. The project aims to protect and restore the estuarine environment, and if necessary, beneficially use dredge material to create marsh mounds. The GLO estimates the construction cost to range from $7,500,000 to $8,900,000. Proposals are due by September 10, 2024, and the GLO anticipates awarding the contract by October 16, 2024, with a construction period of approximately 220 calendar days. Respondents must meet minimum qualifications related to coastal construction experience, project completion history, and breakwater construction expertise. The contract will be awarded to the respondent providing the "best value" to the state based on factors such as cost, relevant experience, technical approach, and safety/quality programs.

The RFP requires respondents to submit a Historically Underutilized Business (HUB) Subcontracting Plan as part of their proposal. The current incumbent contractor or any existing infrastructure or technology that requires integration is not specified. The RFP does not mention any set-aside designations or restrictions on the types of organizations that can respond, and the available budget range for the project is $7,500,000 to $8,900,000.

Opportunity text

The Texas General Land Office ("GLO") seeks a highly skilledcontractor for coastal construction services for the construction of approximately8,836 Linear Feet (LF) of rock breakwater to protect and enhance estuarinehabitat within Bird Island Cove located within Galveston Bay at the mouth ofOstermayer Bayou, in Galveston County, Texas (the "Project").The project goal is to protect and enhance the existing estuarine habitats. If aflotation channel is needed for construction, the dredge material would bebeneficially used to create marsh mounds providing additional habitat. Theapproximate cost range for construction of the Project is $7,500,000 to $8,900,000.The Contract Documents which include the Project Manual with the specifications and drawings are posted on the MillerIDS site: https://planroom.millerids.com/

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors