- Detroit Community School is requesting proposals for removal and installation of three HVAC units under RFP DCS 2026 HVAC REPLACEMENTS, with sealed proposals due July 24, 2026 at 12:00 p.m. and a voluntary walk-through on July 15 at 10:00 a.m. at 12675 Burt Road, Detroit, Michigan. The scope requires furnishing and installing three new Trane HVAC units (Model YCD480D4H, 40 ton) with dual-stage heating and cooling, variable frequency drives, ultra-high efficiency components, and dual sense...
- Anchor Bay School District is requesting sealed bids for boiler and hot water pump replacement under RFP Boiler Phase 3, with bids due July 29, 2026 at 1:00 p.m. EDT at the district's Administrative Office in Casco, Michigan, and a mandatory pre-bid walkthrough on July 13, 2026 at 9:00 a.m. EDT at the Transportation Building. The scope covers replacement of existing boilers and hot water pumps with sealed-combustion high-efficiency units across four locations: Lighthouse Elementary, Lottie...
- Anchor Bay School District in Wayne County, Michigan is requesting sealed bids for boiler and hot water pump replacements across four facilities under an Energy Savings Performance Contract, with bids due July 29, 2026 at 1:00 PM EDT and a pre-bid walkthrough scheduled for July 13, 2026 at 9:00 AM EDT. Bids must include a 2.5 percent bid bond, sworn familial disclosure, Iran Economic Sanctions Act certification, and acknowledgment of Addendum No. 1 (issued July 15). The scope spans...
- Academy of Warren, a Michigan charter school, is requesting proposals for HVAC replacement and installation at its facility at 13943 E 8 Mile Road, Warren, with sealed proposals due July 17, 2026 at 12:00 p.m. and a voluntary walk-through on July 9, 2026 at 10:00 a.m. The scope includes removal and disposal of nine existing HVAC units and three air handling units, followed by furnishing and installation of nine new HVAC units and three new Make-Up Air units with all required components,...
- The Michigan Department of Technology, Management, and Budget (DTMB) is requesting sealed bids for HVAC system replacement and repairs at the MDOT Coldwater Welcome Center on I-69 Northbound (Mile Marker 6) in Coldwater, Michigan, with bids due August 12, 2026 at 2:00 p.m. Eastern time. A 10% pricing preference applies to Service Disabled Veteran Owned Businesses (SDVOBs) that submit required documentation — proof of service-connected disability via DD214 or Veterans Administration Rating...
- The Michigan Department of Technology, Management and Budget, State Facilities Administration, Design & Construction Division is requesting bids for HVAC system replacement at the Michigan Department of Transportation Superior Region Office in Escanaba, Michigan, under DTMB File No. 591/25416.AGY, with bids due August 5, 2026 at 2:00 p.m. Eastern Time and a mandatory pre-bid walkthrough on July 21, 2026 at 3:00 p.m. A 10% pricing preference applies to Service Disabled Veteran Owned...
- Academy of Warren is requesting proposals for HVAC and air handling unit replacement with sealed proposals due July 17, 2026 at 12:00 p.m., a voluntary walk-through on July 9, 2026 at 10:00 a.m., and questions due July 13, 2026. Addendum #1, posted July 9, 2026, corrects the unit count and specifications; bidders must acknowledge receipt of the addendum on their quote forms or face rejection. The scope covers removal and disposal of 12 existing HVAC units and air handling units, followed by...
Anchor Bay School District in Michigan is requesting sealed bids for Direct Digital Control (DDC) system upgrades and building automation system installations across five school facilities, with bids due July 31, 2026 at 1:00 p.m. and a pre-bid walkthrough scheduled for July 22, 2026 at 9:00 a.m. at the Maintenance Building in New Baltimore. Michigan Prevailing Wage for State Projects Act requirements apply. The scope covers DDC controller and component installation to replace legacy HVAC controls at Lighthouse Elementary, Naldrett Elementary, Lottie Schmidt Elementary, Maconce Elementary, and the Transportation Building, with integration to Automated Logic Corporation (ALC) systems. Work includes new DDC controllers, wiring, programming, functional testing, troubleshooting, and a $30,000 contingency for failed valves, actuators, and sensors. The Sequence of Operations specification establishes detailed control parameters for variable air volume air handling units, rooftop units, fan coil units, and terminal equipment, including occupied heating setpoints of 68–70°F and cooling setpoints of 74–76°F, economizer functions, demand control ventilation with specified CO2 thresholds, freeze protection, and smoke detection integration. Contractors must confirm all setpoints and schedules with the District's facilities team prior to implementation. Bidders must demonstrate a minimum of five years documented HVAC control systems experience with DDC system installations. Training comprising two four-hour sessions in different operating seasons is required, along with a one-year warranty including two complete seasonal inspections with written reports. Bid submissions in duplicate must include a 2.5% bid bond, list of warranted projects completed within the last five years, subcontractor list, notarized familial disclosure forms, Iran Economic Sanctions Act certification, and written narratives detailing inclusions and exclusions. No electronic bids are accepted; submissions received after the deadline will not be considered. The successful bidder must provide payment and performance bonds covering the full proposal amount, plus liability and worker's compensation insurance certificates. Notice to Proceed is expected August 13, 2026 following the school board meeting, with construction commencing by August 31, 2026 and substantial completion required by December 1, 2026. Contact Todd Kananen at Centrix Energy Partners, LLC (todd.kananen@centrix-partners.com or 517-294-5386) for the complete RFP or Cori Wiley, Maintenance Supervisor, at 586-716-3622 for technical inquiries.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Lighthouse.pdf | 10MB | 7/17/26 | ||
ABSD BAS_DDC RFP Bid Notice 071726.pdf | 135KB | 7/17/26 | ||
Exhibit A. Subcontractor Master Agreement.pdf | 571KB | 7/17/26 | ||
Lottie.pdf | 13MB | 7/17/26 | ||
Exhibit C - Sequence of Operations_2026-07-17.pdf | 142KB | 7/17/26 |