Armstrong Avenue Pedestrian Bridge (CIP No. 70257) & Neighborhood D South Phase 2 Package #2 Improvements (CIP No. 70256)
Closed State & local contract opportunity Posted
- Solicitation number
- CIP No. 70257 and 70256
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91101 C.i.p., Advertising
- 91115 C.i.p., Construction/Rehabilitation, Other Than Buildings
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91313 Construction, Bridge And Drawbridge (Includes Reconstruction/Rehabilitation)
- 914 Construction Services, Trades, New Construction
- 91502 Advertising (Including Notice Of Bid Solicitation, Statutory Notices)
- 92513 Bridge Engineering
- 92517 Civil Engineering
- 968 Public Works And Related Services
- UNSPSC codes
- 72141205 Drainage system construction service
- 72141206 Dredging service
- 81101500 Civil engineering
- 95121627 Footbridge
- 95121625 Road bridge
- 72140000 Heavy construction services
- 72141107 Bridge construction and repair service
- 95121626 Railway bridge
- 95121638 Pedestrian overpass
- 95121639 Pipeline carrying bridge
- Point of contact
-
- Cheyenne Verduzco cverduzco@tustinca.org (714) 573-3170
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Tustin is requesting sealed bids for construction of the Armstrong Avenue Pedestrian Bridge (CIP No. 70257) and Neighborhood D South Phase 2 Package #2 Improvements (CIP No. 70256), with bids due August 25, 2026 at 2:00 p.m. via electronic submission through OpenGov and a non-mandatory pre-bid site walk-through on August 4, 2026 at 10:00 a.m.
The scope encompasses fine grading, asphalt rubberized hot mix roadway overlay, removals and adjustments, wet and dry utilities installation, hardscape and landscaping with irrigation systems, pavement striping, signing and delineation, traffic signal installation and interconnection, street lighting, pathway lighting, and construction of a pedestrian bridge spanning Armstrong Avenue. The project area covers the Neighborhood D South region bounded by Armstrong Avenue, Warner Avenue, Airship Avenue, and Compass Avenue, with a Linear Park area west of Armstrong Avenue and north of Airship Avenue. Specific deliverables include 224 linear feet of 12-inch PVC storm drain pipe, 2,570 tons of asphalt rubberized hot mix overlay, traffic signal installation at Warner Avenue and Veterans Way, and structural concrete work including cast-in-drilled-hole piling and 190,114 pounds of reinforcing steel. The pedestrian bridge deck spans approximately 236 feet with 43 railing posts and integrated LED lighting; foundation design features 48-inch and 72-inch cast-in-drilled-hole piles based on geotechnical investigation.
The Engineer's Estimate is $10 million. The project schedule allows 250 working days for completion, with contract execution required within ten working days of award notification. Liquidated damages are set at $6,700 per calendar day. Contractors must hold a valid California Class A Contractor's License and comply with prevailing wage requirements under California Labor Code sections 1770 et seq., submitting certified payroll records every two weeks. Bid security equal to 10 percent of the total bid amount, performance bonds and payment bonds each at 100 percent of contract amount, and minimum workers' compensation and liability insurance coverage of $2,000,000 single-limit are required. Questions are due August 13, 2026. Award will be made to the lowest responsive and responsible bidder.
Opportunity text
NOTICE IS HEREBY GIVEN that the CITY OF TUSTIN, as AGENCY, invites sealed bids for the above stated project and will receive bids for construction, materials, supplies, equipment, and/or services set forth herein, subject to all conditions outlined in the Bid Package.
Scope of Work: This work shall consist in part of furnishing all labor, materials, tools, equipment and incidentals as required by the plans, specifications and contract documents for the above stated project.
The work to be done hereunder consists of fine grading, ARHM roadway overlay, removals and adjustments, dry utilities, hardscape, landscaping and irrigation, pavement striping, signing and delineation, traffic signal installation and interconnect, street lighting, pathway lighting, and the construction of a pedestrian bridge:
- The Neighborhood D South area is generally bounded by Armstrong Ave, Warner Avenue, Airship Ave and Compass Avenue.
- The Linear Park area is generally west of Armstrong Ave and north of Airship Ave.
- Armstrong Pedestrian Bridge spans over Armstrong Avenue, southwest of Warner Avenue and north of Airship Avenue.