About this file

This is a construction design document prepared by CHC Consulting for the City of Tustin, California, detailing conduit construction plans for the Armstrong Avenue Pedestrian Bridge and Neighborhood D South Phase 2 Package #2 Improvements project. The document comprises eleven layout sheets (L-1 through L-11) that illustrate underground conduit routing and construction details across the project area, which is bounded by Armstrong Avenue, Warner Avenue, Airship Avenue, and Compass Avenue in Santa Anna's Redhill Central Office exchange area. The plans depict conduit paths, manhole specifications (including one 12-foot by 6-foot by 7-foot structure with a capacity of 504), and curve data at multiple locations including intersections at Airship Avenue, John Johnson Way, Veterans Way, Compass Avenue, Peebler Way, Swaim Way, Helber Way, and Flight Way. The design engineer, exchange engineer, and subway inspector designations are indicated on each sheet, with the project identified as LE(70) A01QK1Y and DA# N/A.

The document serves as a technical reference for contractors and construction personnel responsible for implementing the underground utilities infrastructure supporting the pedestrian bridge and neighborhood improvements. No specific pricing information, contract values, performance timelines, or award details are contained within these engineering drawings. The plans focus exclusively on the physical layout and specifications necessary for proper conduit installation and coordination with existing infrastructure in the project corridor.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

A R

M S

TR

O

N G

A V E

AIRSHIP AVE AIRSHIP AVE

CURVE DATA

MH #2801

12' X 6' X 7'

CFV = 504

SOUTH WALL

LOOKING SOUTH

PICK UP 4-4" DUCTS

@ STA 10+73.49

H E

LB

E R W

A Y

WARNER AVE

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

N

L-1

AIRSHIP AVE

JOHN JOHNSON WAY

VE

TE

R A N

S W

A Y

CURVE DATA

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-2

JOHN JOHNSON WAY

VE

TE

R A N

S W

A Y

CURVE DATA

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-3

CURVE DATA

AIRSHIP AVE

C O

M P A S

S A

VE

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-4

C O

M P A S S A

VE

CURVE DATA

PEEBLER WAY

C O

M P A S S A

VE

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-5

SWAIM WAY

C O

M P A S S A

VE C

O

M P A S

S A

VE

CURVE DATADATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-6

H E

LB

E R

W A Y

CURVE DATA

PEEBLER WAYPEEBLER WAY

V E

TE

R A N

S W

A Y

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-7

CURVE DATA

VE

TE

R A N

S W

A Y

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-8

C O

M P A S S A

VE

CURVE DATA

FLIGHT WAY

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-9

FLIGHT WAY

VE

TE

R A N

S W

A Y

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-10

A R M

S T R O

N G

A V E

FLIGHT WAY

H E

LB

E R

W A Y

CURVE DATA

CURVE DATA

DATE REVISIONS

DWG.

SCALE

MAP #

T.G.M.

U.G. DESIGN ENGINEER:

EXCHANGE ENGINEER:

SUBWAY INSPECTOR:

LE(70) A01QK1Y

CONTRACTOR :

DA# N/A

CHC CONSULTING

CONDUIT CONSTRUCTION

California OF 11

SANTA ANA EXCHANGE

REDHILL C.O. AREA

CONSTRUCTION NOTES

L-11

Sheets and Views
LE(70) A01QK1Y LAYOUT-LAYOUT1 (2)
LE(70) A01QK1Y LAYOUT-LAYOUT1
LE(70) A01QK1Y LAYOUT-LAYOUT1 (5)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (3)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (4)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (6)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (7)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (8)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (9)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (10)
LE(70) A01QK1Y LAYOUT-LAYOUT1 (11)

File details come from the government source that posted it. Updated .