About this opportunity

The Washington Suburban Sanitary Commission (WSSC) in Prince George's County, Maryland is soliciting sealed bids for the Anacostia II Wastewater Pump Station (WWPS) PLC Upgrades project (Contract No. CP7725A24), with responses due by 2:00 p.m. on March 26, 2026, via WSSC's eProcurement Portal at https://procurement.opengov.com/portal/wsscwater. This construction project involves the replacement, modification, and upgrade of the Distributed Process Control System (DPCS) at the Anacostia #2 Wastewater Pump Station located at 1700 Andalusia Lane, Capitol Heights, Maryland. The scope of work includes installation of a new WSSC-furnished Pumping System PLC panel; demolition and upgrade of UPS and power panels; replacement of instrumentation including level meters, switches, transmitters, and pressure gauges; modification of Remote Terminal Units (RTU) and Remote Input/Output (RIO) units; relocation of pump motor starters; installation of new DPCS network cabling and fiber-optic communications infrastructure; and all associated electrical, control system integration, testing, and comprehensive documentation activities. Bidders must be licensed as General Contractors in Maryland with a minimum of six years of experience in wastewater treatment or pumping station construction, including at least two completed projects valued at $500,000 or greater within the past five years; key personnel including a Project Manager and Foreman/Field Supervisor must each have a minimum of five years of relevant experience. The contractor must employ a Control Systems Integrator subcontractor with minimum seven years' experience in municipal wastewater control systems and UL 508/508A fabrication capabilities. A mandatory site visit is scheduled for March 11, 2026, at 10:00 a.m., with questions due by March 12, 2026, at 2:00 p.m. The project requires strict maintenance of plant operations (MOPO) procedures throughout construction, given the facility's continuous 24/7 operations, with specific constraints including maximum two simultaneous pump shutdowns, 21-day advance notice requirements, and minimum one business day between shutdowns. The contract structure includes a fixed lump-sum base bid with contingent unit-price items available as directed during construction, and evaluation criteria include technical qualifications, scheduling, project management approach, and compliance with WSSC standards.

Bidders must be registered in WSSC's Supplier Portal System and are subject to Maryland Prevailing Wage requirements, with mandatory hourly wage rates ranging from $20.00 to $57.16 depending on classification, fringe benefits, and mandatory electronic payroll submission within 14 calendar days of each payroll period; contractors face liquidated damages of $10.00 per calendar day for delinquent payroll submissions and civil penalties up to $50.00 per violation for non-compliance. The solicitation includes a 15 percent Minority-Owned Business Enterprise (MBE) and Small Local Business Enterprise (SLBE) subcontracting goal, and only apprentices registered with the Maryland Apprenticeship and Training Council may be employed, with a mandatory one-to-one ratio of journey persons to apprentices. A 5 percent bid guarantee is required, along with 100 percent performance, payment, and maintenance bonds; contractors must maintain comprehensive insurance coverage including workers' compensation, commercial general liability, business auto liability, and builders risk insurance equal to 100 percent of the contract value, with WSSC named as additional insured. The contract has a three-year base term with no renewal options, and all pricing must remain firm during the base term. The total contract value is $2,500,000.00 for the complete construction services, with WSSC retaining 5 percent retainage from progress payments in accordance with the Maryland Little Miller Act and final payment due within 30 days of acceptance. The project includes a 20-day final acceptance test period demonstrating continuous system operation, with the contractor responsible for equipment testing costs and inspector overtime for work outside standard business hours (Monday-Friday, 8:00 a.m. to 5:00 p.m.).

Opportunity text

2 versions

Update #2 · Latest ·

The Washington Suburban Sanitary Commission, MD (the "WSSC"), is soliciting sealed responses for Anacostia II WWPS PLC Upgrades project Anacostia II WWPS PLC Upgrades project. Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO 2:00 pm on Thursday, April 9, 2026. Late responses will not be accepted.

This project provides for the replacement, modification, and upgrade of the Distributed Process Control System (DPCS) at the Anacostia #2 Wastewater Pump Station. Work includes installing a new WSSC-furnished Pumping System PLC panel; upgrading UPS and power panels; replacing instrumentation; modifying RTU, RIO, and motor starters; installing new DPCS network cabling and raceways; and performing all associated electrical, control, integration, testing, and documentation activities. The Contractor is responsible for full installation, demolition, wiring, coordination, and testing in accordance with WSSC standards to modernize the station's control systems and ensure continued reliable pumping operations.

Update #1 ·

The Washington Suburban Sanitary Commission, MD (the "WSSC"), is soliciting sealed responses for Anacostia II WWPS PLC Upgrades project Anacostia II WWPS PLC Upgrades project. Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO 2:00 pm on Thursday, March 26, 2026. Late responses will not be accepted.

This project provides for the replacement, modification, and upgrade of the Distributed Process Control System (DPCS) at the Anacostia #2 Wastewater Pump Station. Work includes installing a new WSSC-furnished Pumping System PLC panel; upgrading UPS and power panels; replacing instrumentation; modifying RTU, RIO, and motor starters; installing new DPCS network cabling and raceways; and performing all associated electrical, control, integration, testing, and documentation activities. The Contractor is responsible for full installation, demolition, wiring, coordination, and testing in accordance with WSSC standards to modernize the station's control systems and ensure continued reliable pumping operations.

Files

File Type Posted
Anacostia_II_WWPS_PLC_Upgrades_project_(Addendum_#10_Revision).pdf PDF
H_-_Photos_of_PP2_and_PP3.pdf PDF
F_-_16375_Underground_Distribution_System.pdf PDF
Addendum_No._9.pdf PDF
E_-_Revision_1_Electrical_Drawings.pdf PDF
Anacostia_II_WWPS_PLC_Upgrades_project_(Addendum_#4_Revision).pdf PDF
Plans_and_Drawings.pdf PDF
Plans_and_Drawings.pdf PDF
ANACOSTIA_2_WWPS_PLC_BID_PLANS_11052025_sealed_final_package_(4).pdf PDF
ANACOSTIA_2_WWPS_PLC_BID_PLANS_11052025_sealed_final_package_(4).pdf PDF
Prevailing_Wage_Requirements.pdf PDF
Attachment_X__Bid_Specifications_(1).pdf PDF
Appendix_-_Ceiling_Tiles_per_Bar_Screens.pdf PDF
Attachment_X__Bid_Specifications_(1).pdf PDF
Appendix_-_Ceiling_Tiles_per_Bar_Screens.pdf PDF
Prevailing_Wage_Requirements.pdf PDF
ANACOSTIA_2_WWPS_PLC_BID_PLANS_11052025_sealed_final_package.pdf PDF
ANACOSTIA_2_WWPS_PLC_BID_PLANS_11052025_sealed_final_package.pdf PDF
OSDI_Memo_#117414_Anacostia_2_WWPS_PLC_Upgrades_House.pdf PDF
05_Bid_Schedule_12.12.25.docx DOCX document
Attachment_X_-WSSC_Bid_Specifications.pdf PDF
05_Bid_Schedule_12.12.25.docx DOCX document
Appendix_-_Ceiling_Tiles_per_Bar_Screens_project_CP6868A20.pdf PDF
Attachment_X_-WSSC_Bid_Specifications.pdf PDF
Mid-Atlantic_Purchasing_Team_Intergovernmental_&_Cooperative_Purchasing_Clause.pdf PDF
Mid-Atlantic_Purchasing_Team_Intergovernmental_&_Cooperative_Purchasing_Clause.pdf PDF
Appendix_-_Ceiling_Tiles_per_Bar_Screens_project_CP6868A20.pdf PDF
OSDI_Memo_#117414_Anacostia_2_WWPS_PLC_Upgrades_House.pdf PDF
Show all 28

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity