05_Bid_Schedule_12.12.25.docx
DOCX document 42 KB Posted
- Attached to
- Anacostia II WWPS PLC Upgrades project
- Solicitation number
- 98587
- Issued by
- Prince George's County, Maryland
About this file
This is a Bid Schedule for Contract No. CP7725A24 issued by the Washington Suburban Sanitary Commission (WSSC) in Maryland for the Anacostia II WWPS PLC Upgrades project. The project involves the replacement, modification, and upgrade of the Distributed Process Control System at the Anacostia #2 Wastewater Pump Station, including installation of a new WSSC-furnished Pumping System PLC panel, upgrading UPS and power panels, replacing instrumentation, modifying RTU, RIO, and motor starters, installing new DPCS network cabling and raceways, and performing all associated electrical, control, integration, testing, and documentation activities. Sealed bid responses must be submitted via WSSC's eProcurement Portal at https://procurement.opengov.com/portal/wsscwater prior to 2:00 p.m. on Thursday, March 26, 2026, with late responses not accepted. The contractor is responsible for full installation, demolition, wiring, coordination, and testing in accordance with WSSC standards.
The bid schedule is structured in three components: Schedule A comprises two lump sum bid items—Item A-1 for Anacostia II WWPS PLC Upgrade Lump Sum Work and Item A-2 for Control System Integration Lump Sum Work; Schedule B contains unit price items (currently showing none); and Schedule C includes contingent unit price items, specifically Item C-1 for Drop Ceiling Per Appendix—Ceiling Tiles per Bar Screens project CP6868A20 and Item C-2 for a $100,000 contingency lump sum. The Total Base Bid is calculated as the sum of all lump sum items from Schedule A and contingent unit price items from Schedule C. Bidders acknowledge that estimated quantities are not guaranteed and serve solely for bid comparison purposes, with final payment for unit price items based on actual quantities as determined by the Engineer and authorized in the Contract Documents.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
CONTRACT NO. CP7725A24
SCHEDULE A: LUMP SUM BID ITEMS
Item A-1, Anacostia II WWPS PLC Upgrade Lump Sum Work: Bidder agrees to provide all work specified in the Contract Documents and not itemized in Item A-2, Schedule B, or Schedule C.
| ITEM NO. |
| DESCRIPTION |
| TOTAL PRICE |
| A-1 |
| Anacostia II WWPS PLC Upgrade Lump Sum Work |
| A-2 |
| Control System Integration Lump Sum Work |
| Subtotal |
| SUM of Total for Lump Sum Items A-1 through A-2 |
SCHEDULE B: UNIT PRICES ITEMS
Bidder proposes to accept as full payment for the Unit Price Work proposed herein, the amounts computed under the conditions of the Bidding Documents and based on the following Unit Price Amounts, it is being expressly understood that the unit prices are independent of the exact quantities involved. Bidder agrees that the unit prices represent a true measure of the labor, materials, equipment, and services required to provide the specified item, including overhead and profit for each type and unit of Work called for in these Bidding Documents.
NONE
SCHEDULE C: CONTINGENT UNIT PRICES ITEMS
Bidder proposes to accept as full payment for the Contingent Unit Price Work proposed herein, the amounts computed under the conditions of the Bidding Documents and based on the following Contingent Unit Price Amounts, it is being expressly understood that the unit prices are independent of the exact quantities involved. Bidder agrees that the unit prices represent a true measure of the labor, materials, equipment, and services required to provide the specified item, including overhead and profit for each type and unit of Work provided.
Contingent item work will be performed and paid for only at the express written authorization of the Engineer. Quantities for contingent unit price work represent quantities that are above and beyond that required by the Contract Documents.
| ITEM NO. |
| DESCRIPTION |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| TOTAL PRICE |
| C-1 |
| Drop Ceiling |
Per Appendix – Ceiling Tiles per Bar Screens project CP6868A20
| LS |
| 1 |
| C-2 |
| Contingency |
| LS |
| 1 |
| N/A |
| $100,000 |
| Subtotal |
| SUM of Extended Total for Contingent Unit Price Items C-1 through C-4 |
| N/A |
| N/A |
| N/A |
SCHEDULE D: TOTAL BASE BID
Award of Contract shall be based on the Total Base Bid amount as computed below.
| DESCRIPTION |
| TOTAL |
Lump Sum Items Total (Subtotal from Schedule A)
Contingent Unit Price Items Total (Subtotal from Schedule C)
TOTAL BASE BID = SUM of All Bid Items
TOTAL BASE BID (in words)
A. Unit Prices have been computed in accordance with the General Conditions.
B. Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids.
C. Final payment for all Unit Price Bid items will be based on actual quantities, determined as provided in the Contract Documents and authorized by the Engineer.
BF-1 of 3
File details come from the government source that posted it. Updated .