AHEC-26910-B - Administration Building (AD) 253 Server Room Upgrades
Closed State & local contract opportunity Posted
- Solicitation number
- P1003887
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- Point of contact
-
- Stacy Tino stacy.tino@ahec.edu (303) 556-3289
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Auraria Higher Education Center (AHEC) is soliciting bids for a comprehensive server room upgrade project at the Administration Building in Denver, Colorado. The procurement is seeking an HVAC contractor with an electrical subcontractor to conduct critical infrastructure improvements in Room 253, which involves demolishing existing condensing units and installing a new Uninterruptible Power Supply (UPS) and two Computer Room Air Conditioning (CRAC) units. Qualified bidders must attend a mandatory pre-bid conference on October 14, 2025, at 10:00 AM and submit final bids by October 27, 2025, at 2:00 PM. Contractors must demonstrate specific qualifications, including two years of continuous business operation, proven experience with at least two projects over $400,000, and bonding capabilities up to $400,000. The project requires a bid bond of at least 5% of the total bid and has a projected construction timeline of 180 days, with an anticipated start date of December 1, 2025, and completion by May 31, 2026. Evaluation will be based on the "lowest responsible bidder" criteria, considering factors such as technical compliance, experience, and financial stability.
The contract opportunity includes several Colorado-specific labor and business requirements, including a mandate to employ Colorado labor for at least 80% of the work and providing preference to Colorado resident bidders. Contractors must be prepared to provide payment and performance bonds not less than 50% of the contract value for contracts exceeding $150,000. While no specific set-aside designations for disadvantaged enterprises are explicitly highlighted, the bid documents suggest potential opportunities for service-disabled veteran-owned small businesses. The estimated project cost is $370,369.00, with potential for additional adjustments based on alternate pricing and specific project requirements. The project drawings and specifications, prepared by RMH Group and dated September 11, 2025, have been reviewed and approved by AEC-West, the authority having jurisdiction. Potential bidders should note that the state reserves the right to request additional verification of submitted information and may waive informalities or reject any and all bids.
Opportunity text
The Auraria Higher Education Center (AHEC) is requesting bids from an HVAC Contractor (with an electrical subcontractor) to conduct upgrades to an existing IT server room. This includes the demolition of the existing condensing units and installation of a new UPS and two (2) CRAC units that serve an IT server room at the Auraria Administration Building (AD). Drawings and specifications are dated 9/11/2025 by RMH Group; drawings have been reviewed by the authority having jurisdiction, AEC-West, and are approved for construction.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity