AFB - New Shelter Replacement Project - Kenosha

Open State & local contract opportunity Posted

Solicitation number
IFB1 RFAA 2027000051 6
State
Colorado
Responses due

Opportunity facts

Jurisdictions
NIGP code
Point of contact

Updated .

About this opportunity

The Colorado Department of Public Safety, through its Office of Public Safety Communications, is soliciting sealed construction bids to remove and replace the communications shelter at Kenosha Pass, with clarification requests due November 30, 2026 at 4:00 p.m. MT. At least 80% of work must be performed by Colorado labor under Colorado Revised Statutes, and attendance at the mandatory pre-bid conference and site tour held November 19, 2026 was a condition of bid eligibility, with late arrivals disqualified.

Scope covers demolishing the existing shelter, constructing a new foundation, picking up a prefabricated shelter in Golden, Colorado, transporting it to the site, and installing it. The work also includes a 20-foot ice bridge to a tower, feedlines and grounding, two LP tanks with gas lines, and new power service connections. Addendum 1 adds gas-line pressure testing under NFPA 58 and IFGC-24, generator testing with a cold start and two-hour load test, and removal of the existing overhead power line. The Buy Clean Colorado Act requires Environmental Product Declarations for eligible materials, and Colorado prevailing wage and apprenticeship requirements apply. Access is over a 1.2-mile U.S. Forest Service-maintained road, with the final 0.3 miles narrow and possibly requiring roadwork, and all work must follow USFS lease terms. Bidders must have five years in business under the same name, two similar projects exceeding $250,000, bonding capacity up to $258,400, and no prior State termination for non-performance. A bid bond of not less than 5% is required, and the awardee must furnish performance and labor and material payment bonds of not less than 50% of contract value within ten days of the Notice of Award.

The estimated project cost is $258,400, excluding federal and state sales and use taxes, and the project receives no federal funds. Award goes to the lowest responsible bidder based on a base bid, time of completion, and a detailed project schedule with weekly updates. No incumbent is named. Construction is anticipated to run from May 10, 2027 through October 1, 2027.

Final addenda are anticipated December 7, 2026 at 4:00 p.m. MT. Sealed bids are due January 11, 2027 at 10:00 a.m. MT through the Vendor Self-Service portal, followed by a public virtual bid opening at 3:00 p.m. MT. Award intent notification is anticipated January 14, 2027, and contract approval is anticipated February 19, 2027.