Kenosha Pass Shelter Addenda 1.docx

DOCX document 303 KB Posted

Attached to
AFB - New Shelter Replacement Project - Kenosha
Solicitation number
IFB1 RFAA 2027000051 6
Issued by
Prowers County, Denver City, Colorado

About this file

This addendum to the Kenosha Pass Shelter Replacement project, issued by Park County on November 19, 2026, provides six detailed specifications and requirements for work related to shelter replacement infrastructure. The addendum addresses technical requirements for antenna feedlines, LP gas line testing and installation, line sweep testing documentation, generator testing procedures, and decommissioning of existing power infrastructure. The document establishes mandatory standards for pneumatic pressure testing of gas lines per NFPA 58 and IFGC-24 codes, requiring licensed contractor performance with inspector or owner's representative oversight. Generator testing must be conducted by a certified, licensed firm with submission of test plans and installation checklists one week prior to testing and test reports delivered within one week of completion. All line sweep test reports must be provided in PDF format.

The addendum specifies material requirements for underground LP gas piping, mandating plastic piping rated for LP gas with above-ground termination using anodeless risers and USA-made black iron piping for second-stage lines to the generator with stainless steel flexible isolation lines. Damaged antenna feedlines and waveguides are to be replaced by the design-build entity at their expense. The existing overhead power line from the transformer to the shelter must be de-energized, removed, and scrapped off-site following completion of work. One item regarding decommissioning existing power is noted as "Response Pending," indicating ongoing clarification or coordination with the project owner.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDA 1

Project: Kenosha Pass – Shelter Replacement Date: 11/19/2026

Item
Topic
Detailed Comment
1
Antenna feedlines
Antenna feedlines and waveguides that are damaged during this scope of work shall be replaced by the DBE at their expense.
2
LP Gas Line Testing
Prior to gas line trench backfill, perform a pneumatic pressure test from the 1st stage regulator outlet, located near the LP tanks, to the 2nd stage regulator inlet, located at the shelter exterior. Regulators shall not be pressure tested.

Perform testing per NFPA 58, IFGC-24, and Park County requirements.

Testing shall be performed and documented by a licensed contractor and witnessed by an inspector or Owner’s Representative.

Document start/end times, start/end pressure, test medium, test findings and repairs, and photographs of gas lines and fittings.

Test pressure must be 1.5x the maximum working pressure, minimum.

Test duration shall be 30 minutes, minimum.

Allow 15 minutes prior to timer start for temperature stabilization.

Test medium shall be compressed air or dry nitrogen.

Test gauge shall be scaled to 5x the test pressure, max.

With system pressurized, apply a non-corrosive commercial leak-detection solution to joints, risers, and fittings.

After successful testing and all necessary repairs made, backfill trenches.

Perform a final end-to-end soap/sniffer check of entire installation; system to be pressurized to operational pressure with LP gas.

3
LP Gas Lines
Underground plastic piping must be rated for LP gas.

Must terminate above ground using anodeless risers.

Second stage piping to generator: use only USA made 1” Sch. 40 black iron plus a 1” SS flexible line (to isolate engine vibration).

4
Line Sweep Test Reports
Must be provided in PDF format.
5
Generator Testing
Must be performed by a certified, licensed, reputable testing firm.

Must provide Owner with the proposed test plan and installation checklist at least one week prior to planned test date.

Tester shall document tests performed with a Test Report.

Test Report shall be provided to Owner within one week of testing.

6
Decom existing power to existing shelter
(Response Pending) After de-energizing the existing overhead line from the transformer to the existing shelter, the line shall be removed and scrapped off-site.

image1.png