Kenosha Shelter Project - Mandatory Pre-Bid Meeting - Attendance - 11-19-2026 200PM MST - FINAL 11-19-2026.pdf

PDF 64 KB Posted

Attached to
AFB - New Shelter Replacement Project - Kenosha
Solicitation number
IFB1 RFAA 2027000051 6
Issued by
Prowers County, Denver City, Colorado

About this file

This document is a Mandatory Pre-Bid Meeting attendance roster for the Kenosha Shelter Project, issued by the State of Colorado on November 19, 2026. The meeting was held at 2:00 PM Mountain Standard Time and was mandatory for prospective bidders to attend and remain on time to maintain bid eligibility. The meeting served as an opportunity for interested contractors and vendors from companies such as Network Infrastructure Construction Company, Northern Pride Communications, STAR Construction Group, Ridgeline Engineering Company, and others to gather project information and clarifications. Thirty-six individuals from various companies and state agencies attended or were invited to the meeting, with attendance tracked by entry time and participation status.

Of the attendees listed, two participants were disqualified for late arrival: Dan Hancock from ET TOWER, who entered at 2:07 PM, and Shreyans Jain, who entered at 2:03 PM. The majority of qualified attendees entered the meeting between 1:43 PM and 1:59 PM, confirming timely participation. Several State of Colorado (SOC) personnel were listed as invitees but did not attend the meeting. The roster captures contact information including email addresses and phone numbers for follow-up communications regarding bid submission requirements and project specifications for the Kenosha Shelter Project.

View the file

Other files

File Type Posted
KenoshaNewShelter_PreBidPrez.pdf PDF
Kenosha Shelter Bid Schedule BLANK For Bidders 11-18-2026.xlsx XLSX spreadsheet
Ad for Bid.pdf PDF
Kenosha Pass Shelter Addenda 1.docx DOCX document
Bid Package_Kenosha Pass Shelter.pdf PDF
W-9 - March 2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kenosha Shelter Project - Mandatory Pre-Bid Meeting - Attendance - 2:00PM MST - 11-19-2026 First Name Last Name Company EMAIL ADDRESS TIME ENTERED MEETING (MT) Phone Number Attended Y/N Attended, but late & Disqualified Invited

Alex Goussarov Network Infrastructure Construction Company, LLC. DBA "NICX" alexg@nicxco.com 1:54PM 303-946-3351 Y Y Benjamin Thomley Northern Pride Communications (Parent Company) benjamin.thomley@northernpridecommunications.com 727- 389-8768 N Y Bill Voges SOC bill.voges@state.co.us 1:43 PM 303-589-2205 Y Y Bill Mattingly STAR Construction Group/ Star Fiber Wireless Bill@starfiberwireless.com 304-412-6366 N Y Bryce Engen Ridgeline Engineering Company bryce@rdgline.com 1:59PM 612-991-9146 Y Y Dan Hancock ET TOWER dan.hancock@ontivity.com 2:07PM 719-900-8329 Y Was not on time and disqualified. Y Daniel Pell Northern Pride Communications Daniel@celnet.com 1:59PM 408-466-4060 Y Y David Staehlin TC2 inc david@kkrbs.com 1:55PM 303-478-0807 Y Y Dustin Roberts SOC dustin.roberts@state.co.us N Y Edwin Schmidt Hayduke Environmental LLC eschmidt@haydukeenvironmental.com 1:47PM 720-660-7986 Y Y Evan Luthenauer SECOND SIGHT SYSTEMS evan.luthenauer@sssrf.com 1:59PM 844-789-9111 Y Y Ian Terryah Advanced Tower Services, LLC iterryah@advtower.com 1:55PM 505-445-6400 Y Y J R jr@greatlandconstruction.com N Y Joel Deis Ridgeline Engineering Company joel@rdgline.com 303-638-1394 N Y John Santistevan SOC john.santistevan@state.co.us N Y Jon Diack Neucomm Solutions jon@neucommsolutions.com 1:57PM 303.829.0023 Y Y Josh Tucker josh@rockymtndevelopment.com 1:57PM Y Y Karen Diack Neucomm Solutions karen@neucommsolutions.com 1:57PM 303.829.0023 Y Y Mary Broder SOC mary.broder@state.co.us 1:57PM 303-775-0736 Y Y Matt Pekarek SECOND SIGHT SYSTEMS matt.pekarek@sssrf.com 1:59PM 844-789-9111 Y Y Mike McQueen SOC mike.mcqueen@state.co.us 1:58PM 719-248-4727 Y Y Mike Moore SOC michaela.moore@state.co.us N Y Mike Habic SECOND SIGHT SYSTEMS mike.habic@sssrf.com 1:59PM 844-789-9111 Y Y Nancy Guzman SOC nancy.guzman@state.co.us N Y Nathan Tezak Mike Tezak Construction tezaknathan@yahoo.com 1:49PM 719 371-4270 Y Y Roger Laperna rl@rmgcllc.net 1:59PM 727-355-6886 Y Y Sam Taylor STAR Construction Group/ Star Fiber Wireless sam@starfiberwireless.com 1:58PM 480-240-9344 Y Y Scott Wendland Network Infrastructure Construction Company, LLC. DBA "NICX" scottw@nicxco.com 1:58PM 303-332-1933 Y Y Shreyans Jain shreyans@celnet.com 2:03PM Y Was not on time and disqualified. Y Syed Shah Hussain Qadri Northern Pride Communications Inc. Syed@celnet.com 1:43PM 972 310 2618 Y Y Xavier Hernandez Northern Pride Communications (Parent Company) Xavier.hernandez@northernpridecommunications.com 1:58PM 727-355-6886 Y Y mailto:bill.voges@state.co.us mailto:eschmidt@haydukeenvironmental.com mailto:evan.luthenauer@sssrf.com

Kenosha Shelter

File details come from the government source that posted it. Updated .