Kenosha Shelter Bid Schedule BLANK For Bidders 11-18-2026.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- AFB - New Shelter Replacement Project - Kenosha
- Solicitation number
- IFB1 RFAA 2027000051 6
- Issued by
- Prowers County, Denver City, Colorado
About this file
This is a bid schedule template for the Kenosha Shelter project, a construction project involving site preparation, shelter installation, and transmission equipment work. The document provides a blank estimate form for bidders to submit cost proposals across multiple work categories. The project encompasses general items such as insurance, bonds, mobilization, and site equipment rental; site civil and demolition work including access road improvements, site grading, building demolition, propane tank installation, grounding work, and erosion control; shelter delivery and foundation installation with associated inspections and connections; and transmission equipment work including cable installation and waveguide rerouting. Bidders are instructed to enter labor, materials, and equipment costs for each line item, with subtotals and project totals calculated automatically. The template allows for the addition of miscellaneous items as needed with explanation on a separate sheet.
The bid schedule incorporates an 8.0% overhead rate and an 8.0% profit margin applied to the subtotal before calculating the final project total. All line items are initialized at $1.00 as placeholder values for bidder completion. The document does not specify response dates, due dates, site visit requirements, bidder conference information, award dates, contract terms, pricing terms, set-asides, incumbent information, or funding sources. This is a blank template designed for bidders to populate with actual project costs and their anticipated overhead and profit percentages.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Bid Schedule
| Project: Kenosha Shelter |
| BID ESTIMATE |
| Sheet Instructions: Enter values for red text only. Include labor, materials and equipment costs to perform the following tasks. Subtotals and Project Total are auto calculated. Enter values for overhead and profit. Add rows as needed (for missing line items). Explain miscellaneous items on a separate sheet. |
| General | Item Cost | |
| Insurance/Bonds | $ 1.00 | |
| Mobilization | $ 1.00 | |
| Lodging/Per Diem | $ 1.00 | |
| Site Equip. Rental | $ 1.00 | |
| Project Closeout | $ 1.00 | |
| Misc. (please specify) | $ - 0 | |
| General Subtotal | $ 5.00 |
| Site Civil & Demo | Item Cost | |
| Access Road Improvements (pre-con) | $ 1.00 | |
| Access Road Repair (post-con) | $ 1.00 | |
| Site Grading | $ 1.00 | |
| Bldg Demo & Removal | $ 1.00 | |
| (E) Ice Bridge Removal | $ 1.00 | |
| Propane Tank Install (2 tanks) | $ 1.00 | |
| Propane Tanks - Fuel | $ 1.00 | |
| Gas Line / Conduit | $ 1.00 | |
| Grounding: Trenching, Wire | $ 1.00 | |
| Grounding: Conductive Concrete | $ 1.00 | |
| Ice Bridge Install | $ 1.00 | |
| Excess Spoils Removal | $ 1.00 | |
| Erosion Control & Re-seeding | $ 1.00 | |
| Misc. (please specify) | ||
| Site Civil Subtotal | $ 13.00 | |
| Shelter | ||
| Delivery to Site | $ 1.00 | |
| Foundation Install | $ 1.00 | |
| Concrete Inspection & Testing | $ 1.00 | |
| Imported Backfill & Rock | $ 1.00 | |
| Commercial Power Connect | $ 1.00 | |
| Shelter Grounding/Bonding | $ 1.00 | |
| Hood(s) Install | $ 1.00 | |
| Gen/ATS - Testing | $ 1.00 | |
| Misc. (please specify) | ||
| Shelter Subtotal | $ 8.00 |
| Transmission Equipment | ||
| New Cables, Connectors, GND Kits | $ 1.00 | |
| Reroute Waveguides | $ 1.00 | |
| Line Sweep Testing | $ 1.00 | |
| Misc. (please specify) | ||
| TE Subtotal | $ 3.00 |
| Subtotal 1 | $ 29.00 | |
| Admin / Overhead | 8.0% | |
| Subtotal 2 | $ 31.32 | |
| Profit | 8.0% | |
| Project Total | $ 34 |
File details come from the government source that posted it. Updated .