KenoshaNewShelter_PreBidPrez.pdf

PDF 3 MB Posted

Attached to
AFB - New Shelter Replacement Project - Kenosha
Solicitation number
IFB1 RFAA 2027000051 6
Issued by
Prowers County, Denver City, Colorado

About this file

This is a pre-bid presentation document for the Kenosha Pass Shelter Replacement Project, a construction project managed by the State of Colorado Department of Public Safety (CDPS) in coordination with the U.S. Forest Service (USFS) and involving Park County. The project requires construction of a new shelter foundation, installation of a prefabricated shelter measuring 22'-4" x 11'10" x 11'10" (weighing 63,000 lbs), construction of a 20-foot ice bridge to a tower, installation of feedlines and grounding systems, demolition of existing structures, installation of two LP tanks with associated gas lines, and coordination of new power service connections. The shelter is currently located at CGW (Golden) and will be transported to the project site at Kenosha Pass (elevation 10,200 feet, coordinates 39.411, -105.749). Site access requires traversal of a 1.2-mile USFS-maintained road, with the final 0.3 miles being narrow with potential rutting and requiring possible roadwork. The typical construction window runs May through October. The project will be awarded to the lowest responsible bidder and requires submission of a base bid, time of completion (Notice to Proceed to Substantial Completion and Substantial to Final Completion), and a detailed project schedule with weekly updates during construction.

Bidders must comply with prevailing wage requirements if the project award exceeds $500,000, and the Buy Clean Colorado Act if applicable. The expected project cost is under $500,000. All work must comply with OSHA standards, State of Colorado requirements, and USFS lease agreement terms, including erosion control, sensitive resource protection, wildfire prevention, equipment washdown before delivery, and road restoration. Submittals must follow specification Section 15, and inspections must follow specification Section 16, with testing requirements for feedlines, generator power (including cold start and two-hour load test), and gas line pressure. Site cleanup must be completed within 30 days of substantial completion. Bidders are strongly recommended to conduct a pre-bid site walk of the access road. Questions must be submitted in writing via email to CDPS_EDO_bids@state.co.us. Post-presentation documents, including the pre-bid presentation, project bid schedule worksheet (Excel), addenda, and responses to bidder questions, will be uploaded to the VSS (Vendor Self-Service) portal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kenosha Pass Shelter Replacement Project

Pre-Bid “Virtual” Site Walk & Presentation (30 min)

Questions: send via email to CDPS_EDO_bids@state.co.us (after presentation) mailto:CDPS_EDO_bids@state.co.us

Scope of Work

❏ Construct new shelter foundation

❏ Install shelter (and ext. equipment)

❏ Construct new 20’ long ice bridge to tower

❏ Install feedlines from shelter (trapeze) to antennas

❏ Install grounding, connect w/ existing

❏ Demo ice bridge, small shelter

❏ Install (2) LP tanks, gas line

❏ Coordinate new power service connection

Information for Bidders

Item 1 - Bidders are required to use the Bid Form attached to the bidding documents.

● Provide Base Bid

● Provide Time of Completion

○ NTP -> Substantial

○ Substantial -> Final

● Method Of Award

○ Lowest Responsible Bidder

RFP and Project Schedule

Project Requirements

❏ Provide submittals, as per spec Section 15 ❏ Perform inspections, as per spec Section 16 ❏ Provide a project schedule (update weekly during construction) ❏ Comply with Prevailing Wage and Buy Clean Colorado (if >$500k) ❏ Work safely (per OSHA, State of CO, USFS) ❏ Work per USFS lease agreement (will be provided to winning bidder) ❏ Keep jobsite tidy and clean ❏ Washdown equipment before delivery (USFS requirements) ❏ Communicate with Owner throughout project

Prefab Shelter

Size: 22’-4” x 11’10” x 11’10”

Weight: 63,000 lb

Located at CGW (Golden)

Transport to site Equip Rm.

Gen. Rm.

Project Site (Elev: 10,200’ GPS: 39.411, -105.749)

Site Access Road Start: 39.412, -105.758 (Highway 285) Total Length: 1.2 miles

Last 0.3 miles (from gate) narrow (trees), ruts, camber - may need roadwork prior to construction

Bidders recommended to walk the access road prior to bidding

Nearby Towers: Fairplay (22 miles); Golden (55 miles)

0.65mi

0.3 mi

FS-126

Gate

Jurisdictions / Agencies

County: Park

Municipality: none

Land owned/managed by: USFS (Pike-San Isabel)

Access road owned/maintained by: USFS

Site access coordination: locked gate (USFS)

Local Climate and Weather

Construction Window: May to October (typical)

Snow: expected October to late May

Weather: Use weather.gov. Search by GPS coordinates.

Climate graphs:

Kenosha Pass

Geotech Report Completed By: Kumar & Associates, 09/2022

On VSS, in the “Bid Package” pdf document

Note: Shallow bedrock (hence, slab foundation, ground radials)

Geotech Boring Log

Review - Construction Drawings

Review - Project Specifications

Permits and Inspections

Scope Permitting Inspections

Project USFS N/A

Electrical None Done by State of CO

Mech, Plumbing None None

Foundations, Soils by State (OSA Code Consultant) Per Spec Section 16

Testing

Scope Test Requirements

Feedlines Line Sweeps (in pdf format)

Generator Power Failure, Cold Start, 2h Load Test

Gas Line Pressure Test, end-to-end

USFS Requirements

● Equipment to Site

○ Wash before delivery (noxious weeds)

● Access Road

○ No sleds or skidding

○ No access when road is “muddy”

○ Ruts > 2” not allowed

○ Road must be restored at end of project

○ Pre/Post work road documentation

● Wildfire: Prevent and Suppress

● Protect sensitive resources

● Erosion Control

● Tower: dull galvanized finish

● Site Cleanup: within 30 days of Substantial

Completion

Office of the State Architect - Compliance

Contract Award > $500,000 → Prevailing Wage Rqmts (use LCP tracker) & Buy Clean Colorado Act

Contract Award > $1million → PW and Apprenticeship utilization

1. Prevailing Wages (web)

a. Wage Determinations (click here)

b. Construction Classification = Building

c. Labor Poster (wages) posted at job site; daily log of employees

2. Buy Clean Colorado Act (web)

a. Constructions materials must comply with regulations

Expected Project Cost < $500k https://osa.colorado.gov/state-buildings/prevailing-wage-and-apprenticeship https://osa.colorado.gov/state-buildings/prevailing-wage-and-apprenticeship/wage-determinations https://osa.colorado.gov/energy-environment/buy-clean-colorado-act#:~:text=The%20Buy%20Clean%20Colorado%20(BCCO,or%20after%20January%201%2C%202024.

Bid Schedule

❏ Excel worksheet on VSS ❏ Adjust the red text ❏ Totals will auto-calc

Project Communication

Submittals: email to Ridgeline/State for review/approval

Project Meetings: weekly during Cx

Daily Progress Reports: each day site work is performed (summary of work, photos)

Project DocBox: keep on site; include CDs, inspection reports, maintenance documents (as needed)

Drawing Redlines: keep on site; update during construction.

Markup with red. Provide final as PDF.

*Doc Box will be placed on site by State

Post-Presentation Documents

To be uploaded to VSS

❏ Copy of this pre-bid presentation ❏ Project Bid Schedule worksheet (Excel) ❏ Addenda to the Drawings/Specs ❏ Responses to Bidder Questions

THANK YOU

Send questions to: CDPS_EDO_bids@state.co.us

Must be submitted/answered in writing mailto:CDPS_EDO_bids@state.co.us

File details come from the government source that posted it. Updated .