AE Services for the Guadalupe Medical Center
Awarded State & local contract opportunity Posted
- Solicitation number
- 0000356
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 90610 Buildings - Architectural Design
- 90628 Energy Conservation; New Energy Sources (Solar, Etc.) - Architectural Services
- 90644 Heating; Ventilating; Air Conditioning - Architectural Services
- 90652 Interior Design, Space Planning, And Exhibits/Displays
- 90658 Lighting (Interior, Exterior) - Architectural Services
- 90678 Security Systems; Intruder And Smoke Detection - Architectural
- 92533 Engineer Services, Professional
- 92567 Mechanical Engineering
- 92588 Structural Engineering
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
The Texas Facilities Commission (TFC) is seeking qualifications for prime professional architectural/engineering (A/E) services for the design and construction administration of a two-story, 27,000 square foot Medical Office Building to serve as the Guadalupe Regional Medical Center in Seguin, Texas. The A/E services will be comprehensive, including programming, conceptual design, schematic design, design development, construction documents, solicitation assistance, construction administration, warranty management, and project closeout. The project will utilize a Construction Manager at Risk (CMR) delivery method, and the A/E will be required to collaborate with the CMR and assist in the evaluation and selection process. Mandatory pre-submittal teleconferences will be held on November 28 and 29, 2023, and qualifications are due by December 20, 2023. The anticipated project duration is 943 days.
The A/E services must comply with non-discrimination requirements of the State of Texas. The RFQ does not provide details on any set-asides, but it does note that the A/E will be required to assist the CMR in developing a Comprehensive Outreach Program to attract Historically Underutilized Businesses (HUBs) to participate in the project. The RFQ does not specify any incumbent vendors or current contractors, nor does it provide details on the project's budget or anticipated award value.
Opportunity text
CLASS-ITEM
DESCRIPTION
906-44
Heating; Ventilating, Air Conditioning - Architectural Services
906-10
Buildings - Architectural design
906-28
Energy Conservation; New Energy sources
906-52
Interior Design and Space Planning
906-58
Lighting (Interior, Exterior) - Architectural Services
906-78
Security Systems - Architectural
907-38
Drafting Services
918-25
Compliance Consulting, American Disabilities Act (ADA)
925-33
Engineering Services, Professional
925-67
Mechanical Engineering
925-88
Structural Engineering
SCOPE: In accordance with the provisions of Texas Government Code, Chapter 2254, Subchapter A, Professional Services, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting submittal of qualifications to provide prime professional architectural/engineering (A/E) services for Project #24-005-4720
TFC 24 Guadalupe Regional Medical Center (GRMC). The address of the Guadalupe Medical Center is 104 Medical Dr., Seguin, TX 78155.
CONTRACT TERM: It is the intention of TFC to award a Contract for full prime professional architectural/engineering (A/E) services for the term of the project. Services undertaken pursuant to this RFQ will be required to commence within ten (10) calendar days of delivery of a Notice to Proceed. The Project associated with the services requested in this solicitation is anticipated to be nine hundred forty-three (943) days.
PROJECT DESCRIPTION: The Project scope of work includes, but is not limited to, design and construction administration of a two-story 27,000 square foot Medical Office Building to serve as a Medical Center for the residents of Guadalupe County, Texas, complete with all required infrastructure: furniture, equipment, telecommunication equipment, etc.
1. A/E Services shall be comprehensive in nature and will include programming, conceptual design, schematic design, design development, design renderings, construction documents, solicitation assistance, construction administration, warranty management, and project close-out assistance.
2. Specialized professional services will be required including, but not limited to: life cycle costing, utility infrastructure design, interior design, acoustics, lighting, interior wayfinding signage and graphics, and landscape design.
3. The construction of the project will be implemented using a Construction Manager at Risk (CMR) delivery method. The construction of the project is expected to be divided into different stages, each with different dates for implementation and completion under separate Guaranteed Maximum Price (GMP) contract amendments or separate contracts, which require the A/E's issuance of multiple design packages. The number of design packages will be determined by TFC in cooperation with the A/E and CMR as reasonably necessary to execute the project in a logical and efficient manner.
4. Phase 1: Architectural and Engineering scope of services shall include, but not be limited to, the following:
A. Design and Construction Administration of the two-story 27,000 square foot Medical Center.
B. The production of a detailed building design. AE to incorporate existing survey information into a Revit model via Autodesk Tandem and delivered to TFC at the end of Phase 1 portion of work for TFC's internal use.
C. Attend and participate in meetings with CMR, TFC and agency stakeholders.
D. A list of necessary testing and inspections to be provided to Owner including, but not limited to, Americans with Disabilities Act (ADA), Commissioning, Testing and Balancing, Environmental, and Construction Materials testing.
E. Assistance in evaluation and interview of Construction Manager-at-Risk selection.
F. Assistance to Construction Manager-at-Risk to prepare order-of-magnitude cost estimates for correction of deficiencies by repair or replacement, as recommended by the A/E.
G. Collaborate with CMR in developing or adjusting scope of work to match available funding and assist in coordination with the City of Seguin or other Authorities Having Jurisdiction (AHJ) as necessary.
H. Assistance in developing priorities for adjusting scope of work to match available funding.
I. Conduct a full building code analysis and report including design considerations to maximize energy and water conservation per SECO energy efficiency and water conservation standards for new construction. The study will evaluate utilizing alternative energy design to determine if they are economically feasible. Building design to incorporate LEED design elements but not require LEED certification.
J. Presentation of findings to Owner for review and approval. Upon acceptance of Phase 1 findings, and authorization by Owner, proceed with Phase 2.
5. Phase 2: Architecture and Engineering scope of services shall include, but not be limited to, the following:
A. Detailed design and documentation of construction plans and specifications. Construction plans to be created in Revit via Autodesk Tandem to allow for a digital version of all equipment and materials for TFC's future use and ease of maintenance. Building information model must follow BIM execution plan and protocols throughout the life cycle of the design and construction.
B. Coordinate and assist CMR and or subcontractors with the asset tagging of new equipment as further explained in attached Attachment F - Building Information Model and Asset Management Guidelines.
C. Submit milestone based intermediate reports, documentation and estimated budgets as outlined in the A/E contract for each portion of the project.
D. Present design and progress to City of Seguin and TFC Commission as necessary.
E. Participate with CMR estimator for budget reconciliation at design milestone phases as outlined in the A/E contract.
F. Provide the Owner with a list of items to be tested and/or inspected including, but not limited to, ADA, Commissioning, Testing and Balancing, Environmental, and Construction Materials testing.
G. Coordinate with third party commissioning agent throughout design and construction administration.
H. Assist Construction Manager-at-Risk to create and implement a Comprehensive Outreach Program to attract HUB Subcontractors to participate in the Project.
I. Assist Construction Manager-at-Risk during subcontractor solicitation for development of Guaranteed Maximum Price.
J. Construction Administration.
K. Warranty management including warranty walk.
L. Project closeout.
6. A/E services shall be offered with the understanding of full compliance with non-discrimination requirements of the State of Texas by the A/E.
MANDATORY PRE-SUBMITTAL TELECONFERENCES: The mandatory pre-submittal conferences will be held on Tuesday, November 28, 2023 @ 10:00 AM and Wednesday, November 29, 2023 @ 10:00 AM. Pre-registration is required to participate in the teleconference. Respondents must have an employee of their firm attend at least one (1) of the two (2) scheduled pre-submittal teleconferences. TFC shall reject submittals submitted by firms that did not attend one of the mandatory pre-submittal conferences.
TFC is using the eProcurement system Bonfire. Respondents must register for a Bonfire account (No Charge) to submit a response. Respondents must submit their responses/submittals at the following link: https://tfcstate.bonfirehub.com/opportunities/112754
EVENT
DATE
Issue RFQ
11/13/2023
Mandatory Pre-Submittal Conference
11/28/2023
Tuesday, 10:00 AM
(OR)
Mandatory Pre-Submittal Conference
11/29/2023
Wednesday, 10:00 AM
Deadline for Submission of Questions
12/05/2023
Deadline for Submission of Qualifications & HSP
12/20/2023
Wednesday @ 3:00 PM
Notification to Interview
1/04/2024
If Interviews are NOT required by TFC
Award by Commission
02/15/2023
Execute Contract
03/15/2023
If Interviews are required by TFC
Interviews of short listed firms
01/16/2024
Award by Commission
02/15/2024
Execute Contract
03/15/2024
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity