ESBD_File_342321_303-4-0000356 Attachment F - Building Information Model and Asset Management Guidelines, Revised 9-6-2023.pdf
PDF 4 MB Posted
- Attached to
- AE Services for the Guadalupe Medical Center
- Solicitation number
- 0000356
- Issued by
- Bexar County, San Antonio City, Texas
About this file
This document is a Building Information Model (BIM) and Asset Management Guidelines attachment related to a state and local contract opportunity for Architectural/Engineering (A/E) services for the Guadalupe Regional Medical Center project in Seguin, Texas.
The scope of services includes comprehensive A/E services such as programming, design development, construction documents, construction administration, and project closeout for a two-story, 27,000 square foot medical office building. The project will use a Construction Manager at Risk (CMR) delivery method, with the A/E required to collaborate with the CMR and coordinate asset tagging of new equipment. The A/E services will be divided into two phases, with the first phase focused on design and the second phase on detailed construction documentation. The project is anticipated to take 943 days, and the A/E contract term will align with the project duration. Mandatory pre-submittal teleconferences are scheduled for November 28 and 29, 2023, and responses are due by December 20, 2023. The contract is expected to be awarded by the Texas Facilities Commission on February 15, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT Building Information Model
ATTACHMENT F
BUILDING INFORMATION MODEL
AND
ASSET MANAEMENT GUIDELINES
See attached.]
Revised 9/6/2023
TEXAS FACILITIES COMMISSION Edit Date: 9-6- 2023
BIM to FM Process
Building Information Model to Facilities Management (BIM to FM)
The WBT Renovation project has a Facilities Management data collection and model population requirement. The Revit design record models will be populated with design, submittal, installation, O&M and training document hyperlinks, as well as commissioning document hyperlinks through the following steps.
Design Phase – Steps 1‐3:
As the design Revit models are being developed, the Design team and their consultants will load the shared parameters provided by TFC to the required component families. The Design team will populate the unique equipment ID, description, location, and specification hyperlink for the required Revit components. A schedule in Revit shall be created with the components to be exported (see Revit Family Type Categories.pdf). At the 100 CD phase as the plans are being issued for construction, the AOR will use "a TFC approved software to – Excel Import or Export” to export the schedules to an Excel spreadsheet. The spreadsheet will contain the data entered by the AOR and create the blank data structure to be completed by the CMR and Cx Agent. The Excel file will be saved in TFC’s cloud‐based collaboration environment so that the CMR/Cx team can enter the remaining data fields.
Construction Phase – Step 4:
The CMR will complete the data population of the FM spreadsheet and enter the Training and O&M hyperlinks from approved submittals transferred from Impact to the cloud‐based collaboration environment. Hyperlinks can be made to multiple .pdf documents through a single table of contents that links to additional files. At the time of equipment installation, the CMR shall affix barcode labels provided by TFC to the required equipment/building components. After installation, the CMR will complete the remainder of the Building, and MEP information in the spreadsheet. At commissioning, the Cx Agent will run QC checks on the data to confirm that 1) the data has been entered, 2) the serial number has been transcribed properly, 3) the location of the equipment as noted in the spreadsheet is correct. At completion of startup the Cx Agent will link the testing documents to the applicable components within the spreadsheet.
TEXAS FACILITIES COMMISSION Edit Date: 9-6-2023
BIM to FM Process
Final Completion Phase – Step 5‐6:
At the completion of construction, the CMR will add any final data or hyperlinked O&M or Training manuals to the spreadsheet and notify AOR of completion. Prior to submission of the final record drawings, the AOR will update the record models with final red lines from CMR, then the AOR will import the completed Excel FM spreadsheet back into the record Revit models using “a TFC approved software" – Excel Import/Export” add‐ in for Revit. This will populate the collected information back into the final record Revit models. All models, spreadsheets, linked documents, and other required as‐built files will be transferred to the Texas Facilities Commission through TFC’s cloud‐based collaboration environment, in addition to the submittal in the TFC’s electronic project management system.
Attachments:
BIM to FM Lite Bid Pack.pptx Asset Management Guidelines 2.23.12 for TCC 2018‐09‐13.pdf Revit Family Types Rev 2019‐04‐22.xlsx
Required Software:
AOR: AutoDesk Revit 2017 +
AutoDesk BIM Collaborate Pro
Microsoft Office Excel 2010 (or current version)
TBD: Excel Import/Export approved software
CMR: Microsoft Office Excel 2010 (or current version)
TEAM: Bluebeam or Adobe Acrobat (current version)
Revised 9-6-2023
TFC Asset Management and
Naming Convention
Guidelines
3/2/2022
NAMING CONVENTION
o o o
REJ-CHWP-B-1
SHB-AHU-1E-1
DATABASE ASSET INFORMATION
ASSET LABELING REQUIREMENTS
MANAGING ASSETS IN MM
TEXAS FACILITIES COMMISSION Edit Date: 3/3/2022
Asset Management & Naming Convention Guidelines
HV AC SYSTEMS
Edit Date: 3/3/2022 TEXAS FACILITIES COMMISSION
Only parent assets are being tracked for the TCC effort.
Information on child components, filters, and parts are located in the hyperlinked O&M Manuals.
COOLING TOWER /CHILLER SYSTEM
Secondary Chilled Water
See AHlal System
Pu.op
BLD-CHWP-2-2
Flow Meter
Flow Aeter
Coollnp Tower
BLD-CT-1-1
�----2· Water·-----�-------➔
PRIMARY
ASSET OR
PARENT
( SUB�ART ) •
Expansion Tank
BLD-EXTK-2-1
Air SeDenllor
BLD-ASEP-2-1
Evap,;,rator
Chiller
BLD-CH-1-1
Condenser Water Pu:np
BLD-CWP-1-1
83" Water
79"Water
Cond:enser
F,aer
Only parent assets are being tracked for the TCC effort.
Information on child components, filters, and parts are located in the hyperlinked O&M Manuals.
AIR HANDLER UNIT SYSTEM
Water
See Cooling Tower/Chiller
Syslem or Boller Syslem
WatenValve·
Frequency Drive BLD-Vl'D-2-1A
PRIMARY ..
ASSr;TOR
PARENT
( SUB-�ART ) "Cahbraled Part
(condensete Drain)
AJr Handler UnH �---.-�Bc;,;LD-AHU-2•;..1 _ _,....._, ( c�,1 ) Fl�er
Offftiser
Frequency Drive BLD-Vt-D-2-1B
Only parent assets are being tracked for the TCC effort.
Information on child components, filters, and parts are located in the hyperlinked O&M Manuals.
AIR COMPRESSOR SYSTEM
; PRIMARY
ASSE;TOR
PARENT
�( SUB-�ART )
Air Reoulator BLD·ARt:G-2-tA C5te0
23 PSI
Air Compressor BLD-CA-2-t
Foller
0-13 PSI
Air/Dryer
BLD-AD,
�r -2·18
( F,Ker )
Air Requlator
BLD-ARIEG-2-18
Foller
23 PSI
Bypas$ Valve
Only parent assets are being tracked for the TCC effort.
Information on child components, filters, and parts are located in the hyperlinked O&M Manuals.
HOT WATER BOILER SYSTEM
147"Water------j ��� ►j------175"Water
Hot Water Pump
BLO-HWP-1-1
Bypass Valve
Hot Water Pump
BLO-HYVP-1-2
�----------.seeAH System ----------�
PRIMARY
ASSEiTOR
PARENT
TEXAS FACILITIES COMMISSION Edit Date: 3/3/2022
Only parent assets are being tracked for the TCC effort.
Information on child components, filters, and parts are located in the hyperlinked O&M Manuals.
STEAM BOILER SYSTEM
�---Hot Water------ Steam BOIier
BLD-8-2-1
Boiler Feed Pump BLD-l:P-2-1
DA Tank
BLD-DATK-2-1
Transfer Pump
BLD-;{P-2-1
Recycle Pump BLD-rP-2-1
Couplings
PRIMARY
ASSl:'l<TOR
PARENT
BeaMQS
Couplings lt----Steam: 90 PSI High 135 PSI Low
Bear-tngs
Coupl,ngs
Heal Exchanger
BLD-XCHR-2-1
, so• Hot water
Hot Water P1:.np
BLD-HWP-2-1
5eeAHU Sys em
TEXAS FACILITIES COMMISSIC
Building Name
Building A
Building A Parking Structure
Building B
Building B Parking Structure
Location
4601 W. Guadalupe
4601 W. Guadalupe
TBD
TBD
Edit Date: 3/1/22
Building IDs
CODE
NACA
PKS
NACB
PK?
TEXAS FACILITIES COMMISSION
Parameter Name
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
TFC
UniquelD
Description
Location
Link SpecSection
Manufacturer
PartNo
SerialNo
Warranty Email
ControlNo
Link TrainingDocs
LastMaint
Installed
Life Expect
End life
Volts
Amps
Phase
RPM
BeltSize
Horsepower
FilterSize
Link SysManual
Link CxDocs
In Blue by AOR
In Green by CMR
In Red by Cx Agent
Parameter Type
Text
Text
Text
URL
Text
Text
Text
Text
Text
URL
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
URL
URL
URL
Include for future use. No input required.
Parameter Group
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC FM MEP
TFC FM MEP
TFC FM MEP
TFC FM MEP
TFC FM MEP
TFC FM MEP
TFC FM MEP
TFC FM MEP
TFC FM MEP
Description
See Asset Categories I Names
Component Description
Room Number, Other area description
Edit Date: 3/1/22
BIM to FM
Shared Parameters
Project Specification Section from TFC's cloud-based collaboration environment.
Manufacturer
Model/Part Number if applicable
Serial Number if applicable
Email of warranty contact
Barcode number from TFC supplied label
Training Documents/Videos
Date last maintained
Date installed
Anticipated life expectancy (in years)
Anticipated end-of-life date
Volts as per approved submittal
Amps as per approved submittal
Phase as per approved submittal
Rotations per Minute as per approved submittal
Belt Size as per approved submittal
Horsepower as per approved submittal
Hyper/ink to O&M filter section or separate filter document.
Operations and Maintenance manual
Commissioning Documents
Revit Model Category FM Data
Air Terminals y
Cable Tray Fittings N
Cable Trays N
Casework y
Ceilings y
Columns N
Communication Devices y
Conduit Fittings N
Conduits N
Curtain Panels N
Curtain Systems y
Curtain Wall Mullions N
Data Devices y
Detail Items N
Doors y
Duct Accessories y
Duct Fittings N
Duct Insulations N
Duct Linings N
Duct Placeholders N
Ducts N
Electrical Equipment y
Electrical Fixtures y
Entourage N
Parameter Group
TFC FM MEP
TFC FM BLDG
TFC FM BLDG
TFC FM MEP
MEP
TFC FM BLDG
TFC FM MEP
TFC FM BLDG
TFC FM MEP
MEP
TFC FM MEP
TFC FM MEP
Description Barcode
Grilles and Registers N
Built-in cabinetry N
By type, showing construction, and finishes N
Speakers N
J-Boxes
Curtain Wall Systems N
Receptacles, Wifi WAPs, Routers y
Interior, Exterior, Overhead, Smoke Barriers, and Rolling N
Dampers, FSDs y
Specialty Ducts requiring maint.
Panels, UPS, Generators y
Special Switches and receptacles, ex: Site Mall NEMA y
Edit Date: 3/1/22
BIM to FM
Categories for Data Collection
Unique ID Notes:
Schema
Tvoe
B
B
B
B
B No location
A
B
A
A
Data
Fire Alarm Devices y
Flex Ducts N
Flex Pipes N
Floors y
Furniture y
Furniture Systems y
Generic Models y
Lighting Devices y
Lighting Fixtures y
Lines N
Mass N
Mechanical Equipment y
MEP Fabrication N
Containment MEP Fabrication N
Ductwork MEP Fabrication N
HanQers MEP Fabrication N
Pioework Openings N
Parking y
Parts N
Pipe Accessories y
Parameter Group
TFC FM MEP
TFC FM BLDG
TFC FM BLDG
TFC FM BLDG
TFC_FM_BLDG
TFC_FM_MEP
TFC FM MEP
TFC FM MEP
TFC FM MEP
TFC_FM_BLDG
TFC FM MEP
Description Barcode
Strobes, Horns, Alarm Panels y
By type, showing construction, and finishes N
TFC Furnishings (Common areas only) y
Fixed in place y
Miscellaneous custom y
Controllers y
Interior and Exterior N
AHU's (Fans, VAVs, Mech Pumps, Chillers, Boilers, FS y
Gates, barricades, Controls, Bollards Y gates, controls, and operable bollards
Pumps, Suction diffusers, Flow Meters, Air Separators, y
Edit Date: 3/1/22
BIM to FM
Categories for Data Collection
Unique ID Notes:
Schema
Tvoe
A
B
B
B
A
A
B
A
Data
Pipe Fittings N
Pipe Insulations N
Pipe Placeholders N
Pipes N
Planting N
Plumbing Fixtures y
Railings y
Ramps N
Raster Images N
Roads N
Roofs y
Security Devices y
Shaft Openings N
Site y
Slab Edges N
Specialty Equipment y
Sprinklers y
Stairs N
Parameter Group
TFC FM MEP
TFC FM BLDG
TFC FM BLDG
TFC_FM_MEP
TFC FM BLDG
TFC FM BLDG
TFC FM MEP
Description Barcode
Toilets, sinks, etc. N
Manufactured Railing systems, (not pipe rail) N
By type, showing construction, and finishes N
Panels, Motion Detectors, Keypads, etc. Yexcept card readers
(Manufactured Items) Bollards, Site Utility Structures (inlet), Hydrants, Utility Poles, Assets, Pavers, Tree
N Grates, Benches, Planters, playground equip, trash cans, furnishings etc.
(If in Contract) Appliances, FP Cabinets & Extinguishers, N
FP Sprinkler Heads N
Edit Date: 3/1/22
BIM to FM
Categories for Data Collection
Unique ID Notes:
Schema
Tvoe
B
B
B
A
A Level = MALL OR
PKMALL
B
Data
Structural Area N
Reinforcement Structural Beam N
Svstems Structural Columns N
Structural Connection N
Handler Structural Connections N
Structural Fabric Areas N
Structural Fabric N
Reinforcement Structural Foundations N
Structural Framing N
Structural Path N
Reinforcement Structural Rebar N
Structural Stiffeners N
Structural Trusses N
Topography N
Walls y
Windows y
Wires N
Parameter Group
TFC FM BLDG
TFC FM BLDG
Description Barcode
By type, showing construction, and finishes N
Interior and Exterior N
Edit Date: 3/1/22
BIM to FM
Categories for Data Collection
Unique ID Notes:
Schema
Tvoe
Edit Date: 3/1/22 TEXAS FACILITIES COMMISSION
BIM to FM
Categories for Data Collection
Revit Model Category FM Parameter Group Data
Elevators y TFC FM MEP Cabs and Equipment
Signage Exterior
Character Character
Set 1 Set2
Building Equipment l B J A H u l B J A H u M l B J A H u M
Schema A - BLDG-EQUIP ID-UNIT#
Equipment that will receive an asset tag as shown in the table above, and other building components with unique instances.
Other Notes:
Description Barcode Unique ID Notes:
Schema
Tvoe y A
Character Character set1 setz
Building Equipment
L B J A 1-1 u
L B A H u M
8 A H u M
Schema B - BLDG-EQUIP ID-UNIT#
Non-unique equipment, walls, floors, ceilings, doors, etc. Use the tag or mark number for the Unit# in the schema. If the component does not carry a tag or mark, then sequentially number them.
*Description should be specific (Wall, Interior Full-Height 2 Hr). Think in terms of broad to specific.
*Use room number for location (room extends from floor to structural deck above). If no room number, then use floor level.
Name rooms per the OPR 5.2.3.6.5
*Floor and Level have the same meaning. Name them per the OPR 5.2.3.6.4
Asset category Description
Air Terminals Grille, Exhaust
Grille, Return Air
Grille, Supply
Louver, Exhaust
Casework Built-Ins
Ceilings Lay-in, hard lid, specialty
Communication Devices BAS Outlet
Speaker, (type)
Curtain Systems Architectural Curtain Wall
Data Devices Receptacle, Data
Router
Wireless Access Point
Doors
Duct Accessories Damper, Barometric Relief Damper
Damper, Fire Safety
Electrical Equipment Panel, Electrical Power
Panel, Relay
Switch Gear
Switch, Automatic Transfer
Switch, Uninterruptible Power
Tranformer, Med Voltage
Electrical Fixtures Power Receptacle, Special (type)
Switch, Lighting, Special (type)
Fire Alarm Devices Fire Alarm Control Panel
Fire Alarm Control Unit Clean Agent
Fire Alarm Smoke Detector (type)
Fire Alarm Speaker/Strobe (type)
Equip.
Schema
Desilmator
EG B
RAG B
SG B
LE B
CASE B
CLNG B
BAS A
SP A
ACW A
DR A
RTR A
WAP A
DOOR B
BRD A
FSD A
PPNL A
RPNL A
SWGR A
ATS A
UPS A
XFMR A
PR A
SW A
FACP A
FACU A
SD A
FA A
Edit Date: 3/1/22
BIM to FM
Asset Categories / Names
TFC_UniquelD
NACB-SG-TAG
NACB-CASE-(number or tag)
NACB-CLNG-TAG
NACB-DOOR-TAG
Fire Alarm System Annunciator
Floors
Furniture
Furniture Systems
Generic Models Generic Model
Lighting Devices Lighting Control Panel
Lighting Fixtures Lighting, Electrical
Lighting, Exit
Mechanical Equipment AC, Computer Room
Air Handling Unit
Blower Coil Unit
Boiler Unit
Building Controller
Chiller Unit
Computer Room Condensing Unit
Cooling Tower Unit
Damper, Fire
Damper, Fire/Smoke
Damper, Smoke
Exhaust Return Unit
Exhaust Return Vent
Fan Coil Unit
Fan Powered Terminal Unit
Fan, Exhaust
Fan, Exhaust Stair Pressure
Fan, Make up Air
Fan, Stairway Pressurization
Fan, Transfer
Filter, Side Stream
Equip.
Schema
Desilmator
FAA A
FLR B
FFE F
MOD B
G A
LCP A
EL A
X A
CRAC A
AHU A
BCU A
B A
BC A
CH A
CRCU A
CT A
FD A
FSD
SD A
ERU A
ERV A
FCU A
FPTU A
EF A
SPF A
MUF A
STPF A
TF A
SSF A
Edit Date: 3/1/22
BIM to FM
Asset Categories / Names
TFC_UniquelD
Maintain current lighting tag adding "EL" in front
Includes all components within the enclosure.
Flow Meter
Gravity Ventilator
Heat Exchanger
Makeup Air Unit
Pump, Chilled Water Primary
Pump, Chilled Water Secondary
Pump, Chilled Water to Buildings IITertiarvl Pump, Condenser Water
Pump, Dom Water Booster
Pump, Heating Hot Water
Pump, Submersible
Sensor, Garage Exhaust
Tank, Expansion
Unit Heater
Valve, Control
Variable Air Volume Unit
Variable Air Volume Unit, Exhaust
Variable Air Volume Unit, Fan Powered Variable Air Volume Unit, Outside Air
Variable Air Volume Unit, Single Duct
Parking Arm Gate
Arming Loop
Camera, License Plate Recognition
Closing Loop
Pay-In-Lane Exit Station
Equip.
Schema
Desilmator
FM A
GV A
HEX A
MAU A
PCHWP A
SCHWP A
TCHWP A
CWP A
DWP A
HWP A
ESP A
CO/NO A
ET A
UH A
CV A
VAV A
EXVAV A
FPVAV A
OAVAV A
SDVAV A
AG A
AL A
LPR A
CL A
PS A
Edit Date: 3/1/22
BIM to FM
Asset Categories / Names
TFC_UniquelD
RFID Antenna
Ticket Dispenser
Traffic Controller
Pipe Accessories Backflow Preventer
Fire Department Connection
Pump, Fire
Pump, Jockey
Pump, R
Pump, Sanitary Sewer Ejector
Pump, Storm Sewer Ejector
Tank, Expansion
Trap Primer
Valve, Pressure Relief
Water Softener
Plumbing Fixtures Drain, Roof
Drinking Fountain, Electric
Electric Water Cooler
Emergency Eye Wash-Shower
Hydrant, Roof
Lavatory, (type)
Pump, Sump
Shower, (type)
Sink, Mop
Urinal, (type)
Water Closet, (type)
Water Heater
Railings
Roofs
Equip.
Schema
Desilmator
AT A
TD A
TC A
RPZ A
FDC A
FP A
JP A
RP A
SSE A
SP A
ET A
TP A
PRV A
ws A
RD B
EDF A
EWC A
EEW A
RH A
L B
SP A
SH B
MS A
u B
WC B
WH A
RAIL A
ROOF A
Edit Date: 3/1/22
BIM to FM
Security Devices Camera, License Plate Recognition
Camera, Surveillance (type)
Camera, Surveillance Elevator
,a, Card Reader
Door Management Unit
Emergency Phone
Intercom Station
Operator, Door
Personel Duress Button
Phone, Emergency Wall Mounted
Remote Lockdown
Request to Exit
Sensor, Door Position
Sensor, Door Position DT
Telecom Rack Interface
Video Surveillance Decoder and SM
Video Surveillance Workstation
Site Bollards
Furnishings, play equipment, trash cans Hydrant, Site
Landscape Accessories
Planters
Site Utility Structures
Utility Pole
Specialty Equipment Fire Extinguisher
AV Projector
Equip.
Schema
Desilmator
LPR A
CAM A
PTR A
CR A
DM A
EP A
COM A
DO A
p A
PH A
RLD A
REX A
DP A
DD A
T A
VM2 A
VMl A
BOL A
SFFE A
SH A
LS A
PLANT A
SITE A
POLE A
FIREX A
PRJ A
Edit Date: 3/1/22
BIM to FM
AV Projector Screen
AV Receiver, DM
AV Listening Assist Box
AV Display, Flat Panel
AV Control Panel, Wall
AV Web Camera
AV Transformer
AV Wireless Mic Antenna
AV Wall Plate
Sprinklers
Walls
Windows
Elevators
Equip.
Schema
Desilmator
PRJS A
DMR A
LA A
DFP A
WCP A
WCAM A
DMT A
WA A
AVP A
FPS A
WALL B
WIN B
ELEV B
NACB-WALL-TAG
NACB-WIN-TAG
NACB-ELEV-TAG
Edit Date: 3/1/22
BIM to FM
I
Activity Description
Design Parameters Populated (100% CDs)
Issue IFC Set
Export BIM to FM schedules to Excel
CMRs complete submittal level input
CMRs complete install level input
Cx Agent reviews and completes Cx level input
CMR final updates and transmit to AOR
AOR imports data back into Record Model
WBT
Date Due Date Delivered
On Schedule
Delta Date Due
Edit Date: 3/1/22
BIMtoFM
Deliverable Schedule
### Past Due
WBT PK
Date Delivered Delta
| 303-4-03071 Attachment F - Building Information Model and Asset Management Guidelines |
| WBT - BIM to FM Process 9-6-23 |