This document is a Request for Qualifications (RFQ) issued by the Texas Facilities Commission (TFC) for prime professional architectural/engineering (A/E) services for Project #24-005-4720 TFC 24 Guadalupe Regional Medical Center (GRMC) in Seguin, Texas. The project scope includes the design and construction administration of a two-story, 27,000 square foot Medical Office Building to serve as a Medical Center for the residents of Guadalupe County, Texas, complete with all required infrastructure. The A/E services will be comprehensive in nature, including programming, conceptual design, schematic design, design development, construction documents, solicitation assistance, construction administration, warranty management, and project close-out assistance. The construction of the project will be implemented using a Construction Manager at Risk (CMR) delivery method. Mandatory pre-submittal teleconferences will be held on November 28 and 29, 2023, and the deadline for submission of qualifications is December 20, 2023, at 3:00 PM. The project is anticipated to take 943 days to complete.
The A/E services will be offered with the understanding of full compliance with non-discrimination requirements of the State of Texas. The construction of the project is expected to be divided into different stages, each with different dates for implementation and completion under separate Guaranteed Maximum Price (GMP) contract amendments or separate contracts, which require the A/E's issuance of multiple design packages. The number of design packages will be determined by TFC in cooperation with the A/E and CMR as reasonably necessary to execute the project in a logical and efficient manner.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TFC FEDERATED SYSTEM OF BIM REVIT MODELS: PROJECT GUIDE ATTACHMENT AA-1
PHASE
PRE DESIGN 1 AND 2
SCHEMATIC DESIGN 1 AND 2
DESIGN DEVELOPMENT 1 AND 2
CONSTRUCTION DOCUMENTS 60% AND 90%
CONSTRUCTION DOCUMENTS 100%
BA/CA
pg. 1 v. 8/25/2023
DOCUMENT RELEVANT DATA COLLECTED, ANALYSIS PERFORMED, AND DESIGN CONCEPTS AND CRITERIA RECOMMENDED. (PG.19) CONDITION OF THE EXISTING BUILDING
AND/OR SITE FEATURES AS APPROPRIATE TO THE PROJECT.
(PG. 20)
MILSTONE DESCRIPTION
SUBMISSION MILESTONES
COMPLETE BIM MODEL, ANNOTATION FILES AND ALL LINKED FILES REFLECTING THE INFORMATION CONTAINED WITHIN THE BID DOCUMENTS, CONSOLIDATED CONTRACT
DOCUMENTS AND RECORD DOCUMENTS. (PG. 41, PG. 43 & PG. 44)
ALL PHYSICAL FEATURES OF THE PROJECT AS INDICATED IN THE DRAWING REQUIREMENTS. (PG. 37-39)
DEVELOP DETAILED AND COORDINATED DOCUMENTS SETTING FORTH THE REQUIREMENTS FOR THE CONSTRUCTION OF THE PROJECT. (PG. 37)
ILLUSTRATE AND COORDINATE ALL IMPORTANT ASPECTS OF THE PROJECT. RESOLVE ALL MAJOR ISSUES THAT COULD CAUSE SIGNIFICANT RESTUDY DURING THE CD PHASE (PG. 31) IDENTIFY AND RESOLVE CLASHES BETWEEN ALL DISCIPLINES AND SPECIALTIES INCLUDED ON THE PROJECT. (PG. 31)
PROPOSED CONCEPTUAL DESIGN, SCALE, AND RELATIONSHIPS AMONG THE MAJOR COMPONENTS OF THE PROJECT. (PG. 21) 2D AND 3D DIAGRAMS ILLUSTRATING HORIZONTAL AND VERTICAL RELATIONSHIPS BETWEEN SPACES AND BETWEEN DEPARTMENTS. (PG. 23)
SITE MODEL
CONTENT
PROPERTY LINES AND
BOUNDARIES
EASEMENTS AND
SETBACKS
TOPOGRAPHY -
SPECIFIC LANDMARKS
TO SET TOPOGRAPHY
MASSING SPACES PARKING WALKWAYS AND
SIDEWALKS
UTILITIES - 5FT FROM
BUILDING LANSCAPING DRAINAGE
STRUCTURES
STRUCTURE
MODEL CONTENT
STRUCTURAL FLOORS FOUNDATIONS STRUCTURAL GRIDS STRUCTURAL
FRAMING
STRUCTURAL
FRAMING STRUCTURAL DETAILS
SHELL MODEL
CONTENT
EXTERIOR PARTITION
AND SCHEDULES
EXTERIOR
OPENNINGS
AWNINGS AND
CANOPIES ROOF SYSTEMS VERTICAL ELEMENTS
MEP EQUIPMENT AND
DISTRIBUTION
SYSTEMS
INTERIOR
MODEL CORE
CONTENT
CORRIDOR
PARTITIONS AND
SCHEDULES
RESTROOMS TENANT DEMISING
PARTITIONS
DOORS AND
SCHEDULES
ROOMS AND
SCHEUDLES
AREAS AND
SCHEDULES FINISH FLOORS CEILINGS
FIRE AND
SUPPRESSION
SYSTEMS
CORE ASSOCIATED
MEP FURNISHINGS IT SYSTEM EQUIPMENT
INTERIOR
MODEL TENANT
CONTENT
TENANT PARTITIONS
AND SCHEDULES
DOORS AND
SCHEDULES
ROOMS AND
SCHEDULES FINISH FLOORS CEILINGS FIRE SUPPRESSION
SYSTEMS
TENANT ASSOCIATED
MEP TENANT FURNITURE EQUIPMENT
REVIEW
DOCUMENTS/FILES
PROVIDED FOR
BUILDING. (I.E. CD'S,
AUTOCAD OR REVIT)
IDENTIFY THE SURVEY
AND DRAWING LIMITS.
SCAN ASSIGEND AREA
WITH AN APPROVED 3D
LASER SCANNER
CREATE
MISSING/REQUIRED
REVIT DRAWINGS,
LATEST REVIT VERSION.
FOLLOW "TFC
FEDERATED SYSTEM OF
BIM MODELS FOR
GUIDELINES. SEE CHART
BELOW FOR MORE
DETAILS AND CLARITY
TERMINATE MEP
SYSTEMS USING A
"SYSTEM SURROGATE"
FAMILY TO SIMULATE
THE CONTINUATION OF
THE SYSTEM.
OBTAIN APPROVAL TO
PROCEED AT EACH
SUBMITTAL FROM BIM
MANAGER.
COMPLETE,
COORDINATE/CONNECT
ALL MEP ENGINEERING IN
MODEL.
COMPLETE MODEL
PER PHASE
DEFINITION.
UPLOAD MODELS INTO
TANDEM AND REVIEW
FOR ANY UNDEFINED OR
UNASSIGNED
COMPONENTS.
SUBMIT FINAL MODELS
FOR REVIEW AND
APPROVAL TO TFC
BIMM PROGRAM TEAM.
RECEIVE FINAL
APPROVAL FROM THE
BIM DIRECTOR
BEFORE COMPLETION
OF PROJECT.
AS-BUILT POST PRODUCTION THE FULLY DEVELOPED FEDERATED SYSTEM OF MODELS, FUNCTIONAL, DEFINIG ALL PARAMETERS, SHOWING THE OPERATIONAL GEOMETRY OF THE BUILDING & SITE, ALL
SYSTEMS COMPLETE IN-PLACE. REVIT MODEL ORGANIZATION CLARIFIED IN TFC AUTODESK BIM COLLABORATE PRO WORKFLOW. SEE ATTACHED REVIT MODEL TEMPLATE
AND FAMILIES.