ESBD_File_342321_303-4-0000356 Attachment G-1 Project Guide - TFC Federated System of BIM Revit Models.pdf

PDF 394 KB Posted

Attached to
AE Services for the Guadalupe Medical Center
Solicitation number
0000356
Issued by
Bexar County, San Antonio City, Texas

About this file

This document is a Request for Qualifications (RFQ) issued by the Texas Facilities Commission (TFC) for prime professional architectural/engineering (A/E) services for Project #24-005-4720 TFC 24 Guadalupe Regional Medical Center (GRMC) in Seguin, Texas. The project scope includes the design and construction administration of a two-story, 27,000 square foot Medical Office Building to serve as a Medical Center for the residents of Guadalupe County, Texas, complete with all required infrastructure. The A/E services will be comprehensive in nature, including programming, conceptual design, schematic design, design development, construction documents, solicitation assistance, construction administration, warranty management, and project close-out assistance. The construction of the project will be implemented using a Construction Manager at Risk (CMR) delivery method. Mandatory pre-submittal teleconferences will be held on November 28 and 29, 2023, and the deadline for submission of qualifications is December 20, 2023, at 3:00 PM. The project is anticipated to take 943 days to complete.

The A/E services will be offered with the understanding of full compliance with non-discrimination requirements of the State of Texas. The construction of the project is expected to be divided into different stages, each with different dates for implementation and completion under separate Guaranteed Maximum Price (GMP) contract amendments or separate contracts, which require the A/E's issuance of multiple design packages. The number of design packages will be determined by TFC in cooperation with the A/E and CMR as reasonably necessary to execute the project in a logical and efficient manner.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TFC FEDERATED SYSTEM OF BIM REVIT MODELS: PROJECT GUIDE ATTACHMENT AA-1

PHASE

PRE DESIGN 1 AND 2

SCHEMATIC DESIGN 1 AND 2

DESIGN DEVELOPMENT 1 AND 2

CONSTRUCTION DOCUMENTS 60% AND 90%

CONSTRUCTION DOCUMENTS 100%

BA/CA

pg. 1 v. 8/25/2023

DOCUMENT RELEVANT DATA COLLECTED, ANALYSIS PERFORMED, AND DESIGN CONCEPTS AND CRITERIA RECOMMENDED. (PG.19) CONDITION OF THE EXISTING BUILDING

AND/OR SITE FEATURES AS APPROPRIATE TO THE PROJECT.

(PG. 20)

MILSTONE DESCRIPTION

SUBMISSION MILESTONES

COMPLETE BIM MODEL, ANNOTATION FILES AND ALL LINKED FILES REFLECTING THE INFORMATION CONTAINED WITHIN THE BID DOCUMENTS, CONSOLIDATED CONTRACT

DOCUMENTS AND RECORD DOCUMENTS. (PG. 41, PG. 43 & PG. 44)

ALL PHYSICAL FEATURES OF THE PROJECT AS INDICATED IN THE DRAWING REQUIREMENTS. (PG. 37-39)

DEVELOP DETAILED AND COORDINATED DOCUMENTS SETTING FORTH THE REQUIREMENTS FOR THE CONSTRUCTION OF THE PROJECT. (PG. 37)

ILLUSTRATE AND COORDINATE ALL IMPORTANT ASPECTS OF THE PROJECT. RESOLVE ALL MAJOR ISSUES THAT COULD CAUSE SIGNIFICANT RESTUDY DURING THE CD PHASE (PG. 31) IDENTIFY AND RESOLVE CLASHES BETWEEN ALL DISCIPLINES AND SPECIALTIES INCLUDED ON THE PROJECT. (PG. 31)

PROPOSED CONCEPTUAL DESIGN, SCALE, AND RELATIONSHIPS AMONG THE MAJOR COMPONENTS OF THE PROJECT. (PG. 21) 2D AND 3D DIAGRAMS ILLUSTRATING HORIZONTAL AND VERTICAL RELATIONSHIPS BETWEEN SPACES AND BETWEEN DEPARTMENTS. (PG. 23)

SITE MODEL

CONTENT

PROPERTY LINES AND

BOUNDARIES

EASEMENTS AND

SETBACKS

TOPOGRAPHY -

SPECIFIC LANDMARKS

TO SET TOPOGRAPHY

MASSING SPACES PARKING WALKWAYS AND

SIDEWALKS

UTILITIES - 5FT FROM

BUILDING LANSCAPING DRAINAGE

STRUCTURES

STRUCTURE

MODEL CONTENT

STRUCTURAL FLOORS FOUNDATIONS STRUCTURAL GRIDS STRUCTURAL

FRAMING

STRUCTURAL

FRAMING STRUCTURAL DETAILS

SHELL MODEL

CONTENT

EXTERIOR PARTITION

AND SCHEDULES

EXTERIOR

OPENNINGS

AWNINGS AND

CANOPIES ROOF SYSTEMS VERTICAL ELEMENTS

MEP EQUIPMENT AND

DISTRIBUTION

SYSTEMS

INTERIOR

MODEL CORE

CONTENT

CORRIDOR

PARTITIONS AND

SCHEDULES

RESTROOMS TENANT DEMISING

PARTITIONS

DOORS AND

SCHEDULES

ROOMS AND

SCHEUDLES

AREAS AND

SCHEDULES FINISH FLOORS CEILINGS

FIRE AND

SUPPRESSION

SYSTEMS

CORE ASSOCIATED

MEP FURNISHINGS IT SYSTEM EQUIPMENT

INTERIOR

MODEL TENANT

CONTENT

TENANT PARTITIONS

AND SCHEDULES

DOORS AND

SCHEDULES

ROOMS AND

SCHEDULES FINISH FLOORS CEILINGS FIRE SUPPRESSION

SYSTEMS

TENANT ASSOCIATED

MEP TENANT FURNITURE EQUIPMENT

REVIEW

DOCUMENTS/FILES

PROVIDED FOR

BUILDING. (I.E. CD'S,

AUTOCAD OR REVIT)

IDENTIFY THE SURVEY

AND DRAWING LIMITS.

SCAN ASSIGEND AREA

WITH AN APPROVED 3D

LASER SCANNER

CREATE

MISSING/REQUIRED

REVIT DRAWINGS,

LATEST REVIT VERSION.

FOLLOW "TFC

FEDERATED SYSTEM OF

BIM MODELS FOR

GUIDELINES. SEE CHART

BELOW FOR MORE

DETAILS AND CLARITY

TERMINATE MEP

SYSTEMS USING A

"SYSTEM SURROGATE"

FAMILY TO SIMULATE

THE CONTINUATION OF

THE SYSTEM.

OBTAIN APPROVAL TO

PROCEED AT EACH

SUBMITTAL FROM BIM

MANAGER.

COMPLETE,

COORDINATE/CONNECT

ALL MEP ENGINEERING IN

MODEL.

COMPLETE MODEL

PER PHASE

DEFINITION.

UPLOAD MODELS INTO

TANDEM AND REVIEW

FOR ANY UNDEFINED OR

UNASSIGNED

COMPONENTS.

SUBMIT FINAL MODELS

FOR REVIEW AND

APPROVAL TO TFC

BIMM PROGRAM TEAM.

RECEIVE FINAL

APPROVAL FROM THE

BIM DIRECTOR

BEFORE COMPLETION

OF PROJECT.

AS-BUILT POST PRODUCTION THE FULLY DEVELOPED FEDERATED SYSTEM OF MODELS, FUNCTIONAL, DEFINIG ALL PARAMETERS, SHOWING THE OPERATIONAL GEOMETRY OF THE BUILDING & SITE, ALL

SYSTEMS COMPLETE IN-PLACE. REVIT MODEL ORGANIZATION CLARIFIED IN TFC AUTODESK BIM COLLABORATE PRO WORKFLOW. SEE ATTACHED REVIT MODEL TEMPLATE

AND FAMILIES.

File details come from the government source that posted it. Updated .