5/8", 1", 1. 5" & 2" Potable Water Meter Change Outs

Closed State & local contract opportunity

Solicitation number
ITB 0060-24
State
Florida
Responses due

Opportunity facts

Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Fort Myers is soliciting bids for a comprehensive potable water meter change-out project through Invitation to Bid (ITB) 0060-24. The procurement seeks qualified respondents to perform plumbing work involving the replacement of water meters ranging from 5/8" to 2" in size, including swapping out dual check valves, performing re-piping, replacing curb-stops, and making necessary box adjustments. Mandatory minimum qualifications for respondents include holding a current Florida state license, being in business for at least three consecutive years, and having no outstanding defaults with the City. The solicitation was released on July 1, 2024, with questions due by July 18, 2024, and responses required by August 28, 2024, at 2:00 p.m. The proposed City Council approval date is set for August 19, 2024. Evaluation criteria will likely include local preference points for businesses located in Fort Myers or Lee County, compliance with technical specifications, and demonstration of past performance in similar municipal infrastructure projects.

The procurement emphasizes participation of minority-owned businesses, with a 15% Minority Business Enterprise (MBE) participation goal. Contractors must complete detailed documentation demonstrating good faith efforts to engage minority-owned businesses, including providing transmittal letters and communication records. The project is subject to federal Build America, Buy America (BABA) requirements, mandating the use of domestically sourced iron, steel, manufactured products, and construction materials. Disadvantaged Business Enterprise (DBE) participation is encouraged, with a race-neutral program and an overall 10.67% goal. While a specific contract value is not definitively stated, a draft contract document indicates a potential budget of $120,000.00 for the water meter change-out services. Contractors will be required to provide comprehensive insurance, comply with E-Verify requirements, and submit various certifications related to non-discrimination, lobbying activities, and contract eligibility. The procurement will be conducted electronically through the PlanetBids system, with the City of Fort Myers maintaining strict oversight of the selection and contracting process.

Opportunity text

The City of Fort Myers (City) requests submittals from interested and qualified Respondents to provide:

Plumbing work to swap out 5/8" up to 2" water meters

Plumbing work to swap out 5/8" meter dual check valves

Plumbing work to Install 5/8" dual check valve with a re-pipe

Plumbing work to swap out curb-stops

Plumbing work to do box adjustments if needed

Files

File Type Posted
5_8",_1",_1.5"_&_2"_Potable_Water_Meter_Change_Outs_(Addendum_#7_Revision).pdf PDF
Contract-CMAR.pdf PDF
Federal_MBE_Form.pdf PDF
Local_MBE_Form.pdf PDF
DOT_FORMS_-_Construction.pdf PDF
DOT_Forms-Professional_Services_(1).pdf PDF
ITB_-_Checklist.docx DOCX document
Local_Preference_Affidavit.pdf PDF
Contract_(draft),_Construction.pdf PDF
BABA_Form.pdf PDF
Contract-Design_Build.pdf PDF
Contract-Service,_non-CCNA.pdf PDF
Contract-Services,_CCNA.pdf PDF
Notice_of_Award.docx DOCX document
Show all 14

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity