5_8",_1",_1.5"_&_2"_Potable_Water_Meter_Change_Outs_(Addendum_#7_Revision).pdf
PDF 520 KB Posted
- Solicitation number
- ITB 0060-24
- Issued by
- Lee County, Fort Lauderdale City, Florida
About this file
This is an Invitation to Bid (ITB) 0060-24 from the City of Fort Myers Procurement Services for potable water meter change outs. The solicitation requests qualified respondents to provide replacement and installation services for water meters in 5/8", 1", 1.5", and 2" sizes throughout the City of Fort Myers, Florida. The project involves swapping out existing water meters, installing dual check valves, re-piping, replacing curb-stops, and performing box adjustments as needed. The solicitation was released on July 1, 2024, with questions due by July 18, 2024, and responses are due by August 28, 2024 at 2:00 p.m. The proposed City Council approval date is August 19, 2024.
The bid includes a detailed schedule of values with unit pricing for various meter sizes and associated installation work. Respondents must meet mandatory minimum qualifications, including holding a current Florida state license, being in business for at least three consecutive years, and having no outstanding defaults with the City. The solicitation emphasizes local preferences, with potential additional points for businesses located in Fort Myers or Lee County. The City will utilize an electronic bidding system and requires respondents to submit comprehensive documentation, including insurance certificates, E-Verify compliance, and various certifications related to business practices, anti-discrimination, and public entity regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract_(draft),_Construction.pdf | ||
| BABA_Form.pdf | ||
| DOT_FORMS_-_Construction.pdf | ||
| DOT_Forms-Professional_Services_(1).pdf | ||
| ITB_-_Checklist.docx | DOCX document | |
| Local_Preference_Affidavit.pdf | ||
| Contract-Design_Build.pdf | ||
| Contract-Service,_non-CCNA.pdf | ||
| Contract-Services,_CCNA.pdf | ||
| Notice_of_Award.docx | DOCX document | |
| Contract-CMAR.pdf | ||
| Federal_MBE_Form.pdf | ||
| Local_MBE_Form.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 0060-24
5/8", 1", 1.5" & 2" Potable Water Meter Change Outs
The City of Fort Myers Procurement Services utilizes an electronic bidding system to streamline the solicitation process.
City of Fort Myers Procurement Services Website https://procurement.opengov.com/portal/cityftmyers
5/8", 1", 1.5" & 2" Potable Water Meter Change Outs, ITB 0060-24
TABLE OF CONTENTS
I. INTRODUCTION
II. SCOPE OF WORK
III. INSTRUCTIONS TO RESPONDENTS
IV. GENERAL CONDITIONS
V. INSURANCE
VI. LOCAL PREFERENCE
VII. MINORITY BUSINESS ENTERPRISE PROGRAM
VIII. DEFINITIONS
IX. VENDOR SUBMISSIONS
X. SCHEDULE OF VALUES
1. INTRODUCTION
1.1. Summary
The City of Fort Myers (City) requests submittals from interested and qualified Respondents to provide replacement and installation of potable water meters in various sizes, including 5/8", 1", 1.5" and 2" meters, within the City of Fort Myers, FL.
1.2. Background
The City of Fort Myers (the “City”), established in 1886, is located on the southern west coast of
Florida. It is the cultural and trade center for Lee County and the surrounding area. The City was built on the site of Fort Harvie and was named for Colonel Abraham Charles Myers, then
Chief Quartermaster of Florida. The City has approximately 1,000 employees serving a population of approximately 96,755 full time permanent residents with a population growth of
12% between 2020 and 2022. According to the Lee County Visitor & Convention Bureau, nearly 4.5 million people visit Fort Myers each year and spend over $4 billion dollars while in the area. Fort Myers has experienced unprecedented growth in its tax base, as the past (3), year over year percentage increases, were double digit. The City added a total of $5.0 billion to its tax base over the past five years, or 75.6%.
The City is situated between Tampa and Miami along scenic U.S. Highway 41, also known as
Tamiami Trail. Recent accolades for the City of Fort Myers include top ranking for best places to live, to retire, and to start a new business, safest cities in America, #4 college town in
Florida, and most recently the 3rd fastest growing place by U.S News and World Report.
The City of Fort Myers is committed to providing exceptional municipal services to residents, businesses and visitors in a fiscally responsible manner while preserving the City’s rich history, diverse culture, and charming lifestyle.
1.3. OpenGov Portal
The City uses OPENGOV (https://procurement.opengov.com/portal/cityftmyers) to administer the competitive solicitation process, including but not limited to soliciting responses, issuing addenda, posting results and issuing notification of an intended decision. There is no charge to register and download the solicitation from OPENGOV. Proposers are strongly encouraged to read the various vendor Guides and Tutorials available in OPENGOV well in advance of their intention of submitting a response to ensure familiarity with the use of OPENGOV. The City shall not be responsible for an Offeror’s inability to submit a response by the end date and time for any reason, including issues arising from the use of OPENGOV.
1.4. Contact Information
Direct inquiries to the following:
Procurement Representative Name
Cathy Scott
Senior Procurement Specialist
2200 Second Street
Fort Myers, FL 33901
Email: cscott@cityftmyers.com
Phone: 239-321-7235
Department:
Procurement Services
1.5. Timeline
Solicitation Release Date: July 1, 2024
Question Deadline: July 18, 2024 before 3:00 p.m.
Solicitation Due by: August 28, 2024 at 2:00 p.m.
Proposed Council Approval Date: August 19, 2024
1.6. Advertising
INVITATION TO BID
CITY OF FORT MYERS
ITB 0060-24 Potable Water Meter Change Outs
The City of Fort Myers is seeking submittals for ITB 0060-24 Potable Water Meter Change Outs which will be uploaded electronically on or before August 5, 2024, at 2:00 p.m.. Interested participants are encouraged to download the solicitation documents. For more details visit
+https://procurement.opengov.com/portal/cityftmyers
CITY OF FORT MYERS
Marty K. Lawing, City Manager Legal Ad: News-Press/OpenGov
Mary Hagemann, City Clerk RUN DATES: July 1, 2024
2. SCOPE OF WORK
2.1. Mandatory Minimum Qualifications
1. The Respondent(s) shall hold a current license from the State of Florida as required for each discipline.
2. Respondent(s) shall have been in business under the current company/firm name for a minimum of three (3) consecutive years (verified through Sunbiz.org).
3. Neither Respondent nor any principal, officer, or stockholder shall be in arrears or in default of any debt or contract involving the City, (as a party to a contract, or otherwise); nor have failed to perform faithfully on any previous contract with the City.
4. Respondents are required to inform the City of any relevant legal or ethical issues.
Specifically, they need to disclose:
• Judgments: Any court decisions against them.
• Bankruptcies: If they have declared bankruptcy.
• Pending Lawsuits: Any legal actions that are currently underway.
• Criminal Activities: Any criminal conduct, especially if it involves moral turpitude
(actions that are morally reprehensible).
Respondents will be given a chance to explain or provide additional information regarding these issues if applicable. This allows them to clarify any concerns and provide context.
To demonstrate qualifications to perform the Work, each Respondent must be prepared to submit within five (5) days of City’s request written evidence, such as financial data, previous experience, present commitments, and other such data as may be called for. Each Solicitation must contain evidence of the Respondent’s qualifications to do business in the State of Florida, or covenant to obtain such qualification, prior to award of the contract.
The awardee will be required to maintain the Minimum Qualifications Requirements, as presented during selection, if selected and awarded the contract, during the term of the Contract and any contract renewals.
2.2. Scope of Work for 5/8", 1", 1.5" and 2" Water Meter Change Outs
Scope of Work: Potable Water Meter Change Outs
This scope of work includes the replacement and installation of potable water meters in various sizes, including 5/8", 1", 1.5" and 2" meters, within the City of Fort Myers, FL. The purpose of this project is to ensure accurate measurement and billing of potable water usage for residential and commercial customers, as well as to improve the overall efficiency and reliability of the potable water distribution system.
Installation Requirements:
o The installation of the water meters shall be performed by qualified technicians with experience in water meter installations.
o The installation shall comply with all relevant codes, standards, and regulations, including but not limited to the City of Fort Myers Plumbing Code and the AWWA
Manual M6 - Water Meters—Selection, Installation, Testing, and Maintenance.
Service Requirements:
A. Pre-Installation Preparation:
o Before the scheduled installation, the contractor shall coordinate with the City of Fort
Myers to obtain the necessary permits, provide all required documentation, and schedule the work to minimize disruptions to water supply.
B. Water Shut-Off and Meter Replacement:
o Prior to replacing the water meter, the contractor shall accurately shut off the water supply to each customer location using appropriate tools and equipment.
o The existing water meter shall be carefully removed, and all associated fittings and accessories shall be disconnected in a manner that minimizes the risk of damage or leaks.
o The new water meter, along with the required fittings and accessories, shall be installed securely and connected to the existing plumbing system following the approved installation techniques and standards.
o The contractor shall ensure that each installation is performed efficiently and with minimal interruption to the customer's water supply.
C. Cleanup and Documentation:
o Upon completion of each installation, the contractor shall clean up the work area, removing any debris and restoring any disturbed surfaces.
o All old water meters and associated materials shall be returned to the City.
o The contractor shall provide detailed documentation of each installation, including the location of the meter, old and new meter readings, and any additional observations or recommendations.
D. Customer Service and Support:
o The contractor shall provide a dedicated customer service contact to address any issues, questions, or complaints related to the meter change outs.
o All customer inquiries shall be promptly addressed and resolved in a professional and customer-centric manner.
Delivery Requirements:
A. Project Schedule:
o The contractor shall provide a detailed project schedule within ten (10) days after contract award, outlining the planned start and end dates for each phase of the installation process.
o The contractor shall follow the agreed-upon project schedule and promptly inform the City of Fort Myers of any necessary modifications or delays.
B. Reports and Documentation:
o The contractor shall provide weekly progress reports to the City of Fort Myers, documenting the completed installations, any issues encountered, and the plan for the upcoming week.
C. Contract Completion:
o Upon completion of the project, the contractor shall provide a final report summarizing the overall project performance, challenges faced, and lessons learned.
Additional Requirements and Terms:
The following additional requirements and terms shall apply to this project:
A. The contractor shall have a valid contractor's license and adequate insurance coverage for the duration of the project.
B. The contractor shall abide by all applicable federal, state, and local laws, rules, and regulations throughout the project.
C. The contractor shall obtain all necessary permits and approvals required for the meter change outs.
D. The contractor shall ensure the safety of their workers and the general public during all project activities.
E. The contractor shall be responsible for any damages to the existing infrastructure or customer properties caused during the installation process and shall promptly repair or compensate for such damages.
F. The City of Fort Myers reserves the right to conduct inspections and audits to verify compliance with the specified requirements and evaluate the overall quality of the work.
G. The City of Fort Myers has the right to terminate the contract if the contractor fails to meet the specified requirements or perform the work satisfactorily.
3. INSTRUCTIONS TO RESPONDENTS
REQUEST FOR INFORMATION
Procurement Services is the official source to obtain information relating to City of Fort Myers solicitations. It is incumbent on the Respondent to obtain solicitation and current award information prior to and after the scheduled opening date of a Solicitation. Information is updated as it becomes available. An award, or recommendation of award, may be made at any time after the scheduled opening date.
APPLICABLE LAW AND APPEALS
This Solicitation is issued in accordance with and shall be governed by the provisions and procedures of Chapter 38, Article III and Article IV of the City of Fort Myers’s Code of
Ordinances which may be accessed online at:
https://library.municode.com/fl/fort_myers/codes/code_of_ordinances?nodeId=SPAADCO_CH38
FI_ARTIIIPU
or by contacting Procurement Services. Any appeal relating to this solicitation must be filed in accordance with the requirements of the City Code of Ordinances.
AMERICANS WITH DISABILITIES ACT
Persons with disabilities needing a special accommodation to participate in this proceeding should contact Procurement Services, at 2200 Second Street, Fort Myers, FL 33901, cfmpurchasing@cityftmyers.com or 239 321-7232, no later than seven (7) days prior to the date on which the accommodation is requested.
The portal will keep all files locked until the solicitation officially closes. The time clock in
OpenGov shall be the “Official Time” that shall be used in identifying the actual closing time. Submittals will not be accepted after the date and time specified. Electronic submissions are the responsibility of the Respondent.
The City will not be responsible for the distribution of addenda and/or other information regarding this request if the Respondent did not register in the City’s
Bid Portal, in OpenGov. All addenda will be provided via OpenGov.
3.1. Introduction
To be entitled for consideration, electronic submittals shall be submitted in accordance with the instructions of this solicitation within the time stated.
The portal will keep all files locked until the Solicitation closes.
The City reserves the right to accept or reject any or all submittals and to waive minor irregularities and technicalities. The City’s decision in such matters is final.
3.2. Solicitation Documents
Visit the City of Fort Myers Procurement Services Website https://www.cityftmyers.com/1171/Procurement-Services, follow the link to
Active Solicitations to obtain solicitation information. Correct registration https://library.municode.com/fl/fort_myers/codes/code_of_ordinances?nodeId=SPAADCO_CH38FI_ARTIIIPU https://library.municode.com/fl/fort_myers/codes/code_of_ordinances?nodeId=SPAADCO_CH38FI_ARTIIIPU mailto:cfmpurchasing@cityftmyers.com https://www.cityftmyers.com/1171/Procurement-Services information is the responsibility of the supplier. The City will not be responsible for incorrect contact information.
A. Solicitation documents must be used in preparing submittals; the City does not assume any responsibility for errors or misinterpretations resulting from the use of incomplete
Solicitation Documents.
B. The City provides solicitation documents for the purpose of obtaining submissions.
3.3. Examination of Solicitation Documents
It is the responsibility of each Respondent, before submitting an offer to
A. Download solicitation documents from OpenGov. Documents from other sources are not guaranteed to be accurate.
B. Examine the Documents thoroughly; it is the respondents responsibility to understand the requirements and to request additional information (via questions in OpenGov) if needed.
C. Consider Federal, State, and Local Laws, ordinances, codes, and Regulations that may affect cost, progress, performance or furnishing of the Work.
D. Study and carefully correlate Respondent’s observations with the Documents, and
E. Notify the City of all conflicts, errors, or discrepancies in the Documents.
F. The Contract form that the City intends to use for the award is included as an attachment with this solicitation for reference. While this draft Contract contains standard legal language and is not routinely modified, any exceptions to this standard
Contract should be clearly indicated in the Vendor’s questionnaire and Respondent understands that such exceptions may affect the evaluation of the submittal.
Modification or alteration of this Contract shall only be valid if mutually agreed to in writing by the parties.
1. The City reserves the right to make minor modifications to this contract for specific solicitations, prior to execution of the contract.
3.4. Interpretations and Addenda
A. All questions about the meaning or intent of the solicitation document are to be submitted through the OpenGov Portal. Only questions received prior to the date and time specified in the timeline will be considered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
Any addenda issued electronically during the time of solicitation shall be included in the solicitation, and each will be incorporated in the subsequent contract.
All answers to questions of substance will be publicly published. Revisions within the solicitation as well questions posed through the “Questions & Answer” feature are authoritative and shall be considered an addendum to the solicitation. All information in this Solicitation, including that provided through the 'Question and Answer' feature is incorporated into the Solicitation or any Contract resulting from this
Solicitation. Participants are required to review all addenda, revisions, and answers to questions published.
No oral interpretations will be made to Respondents as to the meaning of submittal documents. Requests for such interpretations are to be submitted through the OpenGov
Portal. Failure on the part of the Respondent to do so shall not relieve them of the obligation to execute such work in accordance with the latest interpretation by the
City. All interpretations made to the Respondent shall be made in the form of addenda to the submittal documents and posted to OpenGov. Respondents are strongly urged to attend the pre-submittal meeting.
B. Addenda may also be issued to modify the Solicitation Documents as required by the
City.
3.5. Omission from the Solicitation
The apparent silence of any addendum regarding any details or the omission from the
Solicitation of a detailed description concerning any point shall be regarded as meaning that only the best commercial practices are to prevail. All interpretations of this Solicitation shall be made upon the basis of this Contract.
3.6. Procurement Ordinance and Policy
The City’s Procurement Ordinance and Policy is incorporated into this solicitation (and, therefore, any contract awarded as the result of this solicitation) by reference. By participation in this solicitation a Respondent agrees to be bound by the City Procurement Ordinance and
Policy in any issue or action related to this solicitation or subsequent contract resulting from this solicitation.
3.7. Submittal Preparation
A. Preparation
Prepare your response in a clear and concise manner. Ensure that the content of your submittal is complete. Special attention should be given to the specific information, instructions and requirements of the Solicitation document to ensure responsiveness.
Responses that are incomplete or lack key information may be rejected. To help facilitate the review process, properly label each section or tab to correspond with your submittal information.
B. Incurred Expenses
The City is not responsible for any expenses which Respondents may incur in preparing and submitting Proposals including presentations or any other expenses incurred by the
Respondents.
C. Proprietary Information
1. In accordance with Chapter 119 of the Florida Statutes (Public Records Law), and except as may be provided by other applicable State and Federal Law, all
Respondents should be aware the Solicitation and the responses are in the public domain after the intent to award notification or thirty (30) days after solicitation closing. Respondents are requested to identify specifically any information contained in their Proposals which they consider confidential and/or proprietary and which they believe to be exempt from disclosure to the public under applicable law, citing specifically the applicable exempting law; provided, however, that nothing shall be deemed to preclude the full disclosure without redaction of any and all information submitted by Respondents to Committee members, advisors to the Committee, and
City staff and officials administering this solicitation and evaluating the proposals. A generic notation that information is “confidential” is not sufficient. Failure to provide
Procurement Services with a detailed explanation and justification including statutory cites and specific reference to your response detailing what provisions, if any, you believe are exempt from disclosure, may result in your entire response being subject to disclosure in accordance with Chapter 119 of the Florida Statutes.
2. In addition to the response submitted, a Respondent asserting any exemptions from public disclosure regarding any portions of its response shall also provide a redacted copy of its Proposal in electronic format suitable for public disclosure, redacting only such portions of its proposal as exempt from disclosure under an applicable law.
3. By submitting a response, a Respondent acknowledges and agrees that should it designate any materials submitted to the City as confidential or exempt from public disclosure, the Respondent will upon the request of City (at the City’s discretion) defend the City (and its employees, Committee members and advisors, agents, and elected and appointed officials) against all claims and actions (whether or not a lawsuit is commenced) related to the Respondent's designation of material as confidential or exempt from public disclosure. A Respondent shall indemnify and hold harmless the City (and its employees, Committee members and advisors, agents and elected and appointed officials) from any and all claims, actions, suits, judgements, fines, costs, fees (including attorneys' fees), related to the Respondent’s designation of material as confidential or exempt from public disclosure.
4. Nothing herein shall be deemed to preclude the City from exercising its own judgment regarding the disclosure of records and the City may take any action that the City in good faith believes is necessary for City to comply with federal and/or
Florida public records laws, including but not limited to filing a declaratory action.
5. All submittals received from Respondents in response to this Solicitation will become the property of the City of Fort Myers and will not be returned.
3.8. Submission Requirements (ITB)
Respondents are responsible for uploading submittals directly into OpenGov.
Submit statements through the OpenGov portal at:
https://procurement.opengov.com/portal/cityftmyers. The representative who is authorized, to bind the Respondent to the submittal shall sign the qualification statement.
A submittal is timely only if received through the OpenGov portal no later than the precise date and time stated on the timeline. The official time used to determine such time, will be the time clock on the OpenGov portal. The portal will not accept submittals after the date and time set for closing.
A. Mandatory Minimum Qualification Documentation
Provide documentation as necessary for the City to verify that the mandatory minimum qualifications in section titled "Mandatory Minimum Qualifications," have been met. Documentation must be clear and specific.
B. Required Documents – (see Vendor Submission section)
C. Respondents by corporation must be executed in the corporate name by the President or Vice-President (or other corporate officer accompanied by evidence of authority to sign), and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature.
D. Respondents by partnerships must be executed in the partnership name and signed by a partner whose title must appear under the signature and the official address of the partnership must be shown below the signature.
E. Litigation History
The Respondent shall describe whether Respondent is involved in any litigation, currently or within the last seven (7) years. Respondent shall also describe whether they have any outstanding judgments pending against Respondent.
F. Bankruptcy
The Respondent shall provide information on any bankruptcy proceedings for the firm or the primaries in the last seven (7) years.
G. Proprietary Information
In accordance with Chapter 119 of the Florida Statutes (Public Records Law), and except as may be provided by other applicable State and Federal Law, all Respondents should be aware the Request for Proposals and the responses thereto are in the public domain and will be released upon notice of award or thirty (30) days from solicitation closing, whichever comes first. Respondents must specifically identify any information contained in their Proposals which they consider confidential and/or proprietary and which they believe to be exempt from disclosure to the public under applicable law, citing specifically the applicable exempting law; provided, however, that nothing herein shall be deemed to preclude the full disclosure without redaction of any and all information submitted by Respondents to Committee members, advisors to the Committee, and City staff and officials administering this solicitation and evaluating the proposals. A generic notation that information is “confidential” is not sufficient. Failure to provide
Procurement Services with a detailed explanation and justification including statutory cites and specific reference to your Proposal detailing what provisions, if any, you believe are exempt from disclosure, may result in your entire Proposal being subject to disclosure in accordance with Chapter 119 of the Florida Statutes.
Each Respondent must complete the “Confidential and/or Proprietary Information
Section of the Questionnaire”, included with this solicitation.
In addition to the Proposal submitted a Respondent asserting any exemptions from public disclosure regarding any portions of its Proposal shall also provide a redacted copy of its Proposal in electronic format suitable for public disclosure, redacting only such portions of its proposal as exempt from disclosure under an applicable law.
By submitting a proposal, a Respondent acknowledges and agrees that should it designate any materials submitted to the City as confidential or exempt from public disclosure, the Respondent will upon the request of City (at the City’s discretion) defend the City (and its employees, Committee members and advisors, agents, and elected and appointed officials) against all claims and actions (whether or not a lawsuit is commenced) related to the Respondent's designation of material as confidential or exempt from public disclosure. A Respondent shall indemnify and hold harmless the City
(and its employees, Committee members and advisors, agents and elected and appointed officials) from any and all claims, actions, suits, judgements, fines, costs, fees
(including attorneys' fees), related to the Respondent’s designation of material as confidential or exempt from public disclosure.
Nothing herein shall be deemed to preclude the City from exercising its own judgment regarding the disclosure of records and the City may take any action that the City in good faith believes is necessary for City to comply with federal and/or Florida public records laws, including but not limited to filing a declaratory action.
All Proposals received from Respondents in response to this Request for Proposals will become the property of the City of Fort Myers and will not be returned.
H. Electronic Pricing Form Instructions
Procurement Services has implemented an electronic e-procurement platform to streamline the solicitation process.
All responsive Respondents to this solicitation must submit electronic submittals/responses through OpenGov. Paper responses will be deemed non-responsive.
1. PRICING INSTRUCTIONS (if applicable)
a. Once you have logged into your OpenGov account, go to the solicitation in which you want to bid/participate on. Then click on “Draft Response,” complete the information requested, upload your bid/quote/submittal, along with all required attachments, and submit.
b. Unit prices for each item bid shall be shown (if applicable). A total shall be entered in the amount column for each item bid. In case of discrepancy between a unit price and extended price, the unit prices will prevail.
c. No additional charges, other than those listed on the price sheets, shall be made.
Prices quoted will include verification/coordination of order, all costs for shipping, delivery to all sites, unpacking, setup, installation, operation, testing, cleanup, training and travel charges.
3.9. Delivery of Submittal
Except as provided in the "Americans with Disabilities Act," for people needing special accommodations, to be responsive proposals for this solicitation must be submitted electronically. Paper responses will be deemed non-responsive.
A. Instructions for submitting a response
1. Once you have logged into your OpenGov account, go to the solicitation in which you want to bid/participate on. Then click on “Draft Response,” complete the information requested, upload your submittal, along with all required attachments, and submit.
Respondents are solely responsible for ensuring that their submittals are complete, uploaded and submitted in the e-Procurement Portal by the due date and time. The
City shall not be responsible for any submission delays or failures caused by any occurrence.
B. Proposal Binding
All submissions submitted shall be binding for one hundred eighty (180) calendar days following opening.
C. Late Submissions
Late Submissions will not be accepted. Respondents shall assume full responsibility for timely upload of the Proposals.
3.10. Conformance to Solicitation
A. All submittals shall meet and conform to all material, mandatory requirements set forth in this Solicitation, provided that nothing shall be deemed to limit the City’s ability to waive minor irregularities without notice or the need to issue a written addendum.
If a Respondent desires to submit an Offer which, if selected by the City, would require the City to waive, alter or omit a material, mandatory requirement set forth in this
Solicitation, the Respondent must first submit a request to the City asking the City to amend the requirements of this Solicitation in the same manner provided for the submission of written questions by Respondents provided in the section of this
Solicitation entitled “Interpretations and Addenda.” If the City, in its discretion, agrees to amend, alter, or waive the requirement, the City shall issue notice to all prospective participants of the change in the form of a written addendum.
Any request to waive, alter, or amend a mandatory requirement of the Solicitation should be in the form of a written question that can be answered in an Addendum issued to all participants. Please note, the City is not asking the participant to send in their submittal prior to the submission date, but merely to request a waiver or amendment to a mandatory requirement necessary to allow submission of the intended
Proposal.
3.11. Modification and Withdrawal of Solicitations
A. Solicitations may be modified or withdrawn by through the Respondent’s account on
OpenGov any time prior to the opening of Solicitations.
B. If, within twenty-four hours after Solicitations are opened, any Respondent files a duly signed written notice with City and promptly thereafter demonstrates to the reasonable satisfaction of City that there was a material and substantial mistake in the preparation of its Solicitation, that Respondent may withdraw its Solicitation and the Solicitation security will be returned. Thereafter, that Respondent will be disqualified from further submitting on the Work to be provided under the Contract Documents.
3.12. Closing Date & Time
It is the Respondent’s responsibility to ensure that submittals are electronically uploaded before the date and time described herein. Offers by telephone, email or hardcopy will NOT be accepted.
3.13. Opening Solicitations
Construction related submittals will be publicly opened and announced by Procurement Services on the due date and time as specified herein. The Respondent’s name and verification of bond submittal, if applicable, will be publicly announced aloud at the opening.
A. Instructions to join the solicitation opening virtual meeting:
1. Select a method to join
2. Join the virtual meeting.
3. See Introduction Section for the Location and/or link to the virtual Proposal Opening.
Note: Sessions may be recorded. Please turn your camera off and mute your microphone before joining the meeting.
B. Provide live public comment
An opportunity to speak will be provided to all in attendance during the meeting. You will be called by the name, email or phone number listed. When called, unmute your device and state your name and address for the record.
C. In accordance with Florida Statues, Section 119(1)(b)2: Sealed Solicitations, submittals, or replies received by an agency pursuant to a competitive solicitation are exempt from
s. 119.07(1) and s. 24(a), Art. I of the State Constitution until such time as the agency provides notice of an intended decision or until 30 days after opening the Solicitations, submittals, or final replies, whichever is earlier.
All non-construction related submittals will be opened privately and results posted in accordance with F.S.119.07(1) and s. 24(a), Art. I of the State Constitution.
3.14. Irrevocable Offer
The submission of a response shall constitute an irrevocable offer to the City by the Respondent for a period of one hundred twenty (120) days from the date of opening to provide the goods and services set forth in this solicitation upon the terms, conditions, and provisions of this solicitation, at the pricing set forth in the submittal, but City may in its sole discretion, release any Solicitation.
3.15. Evaluation of Submittals (ITB)
A. Initial Review of Responses: Procurement Services will perform an initial review of all submittals for preliminary qualification and documentation compliance. This review process may include, but is not limited to, proper question answer verification, professional licensing, references, and other relevant criteria. If included MBE and local preference will also be reviewed by Procurement Services staff.
B. Procurement staff will send an overview to the Department Representative for further analysis for scope requirements and price analysis.
C. Optional Discussion: At the discretion and in the best interest of the City, the City may conduct discussions with Respondents to clarify their response.
D. The Department Representative emails the Procurement Representative their recommendation, in which a Notice of Intent to Award is based. This is not a guarantee of contract. Final approval is authorized by the City Council.
E. The City reserves the right to analyze the financial capability, reputation, integrity, skill, business experience and quality of performance under similar operations of each
Respondent prior to making an award.
F. City may conduct such research as City deems necessary to assist in the evaluation of any Solicitation and to establish the responsibility, qualifications and financial ability of
Respondents, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to City’s satisfaction within the prescribed time.
3.16. Reserved Rights
A. The City has the right to request additional information, after the closing date, from the
Respondent including but not limited to, information it deems necessary to evaluate, clarify, or substantiate any area contained in each submittal and to more fully meet the needs of the City. This includes information which indicates financial resources as well as ability to provide and maintain the system and/or services. Moreover, the City reserves the right to make investigations of the qualifications of the Respondent as it deems appropriate, including but not limited to, a background investigation conducted by the
Fort Myers Police Department.
B. City reserves the right to make award(s) by individual items, group of items, all or none, or a combination thereof, with one or more suppliers; to reject any or all submittals or waive any informality or technicality in submittals received.
C. City reserves the right to reject any and all Solicitations, to waive any and all informalities and to negotiate contract terms with the Successful Respondent, and the right to disregard all nonconforming, non-responsive, unbalanced or conditional responses. Also, City reserves the right to reject the submission of any Respondent if
City believes that it would not be in the best interest of the City to make an award to that Respondent, whether the Solicitation is not responsive, or the Respondent is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by City.
3.17. Protest Procedure
Any Respondent that has submitted a formal Offer to the City, and who is adversely affected by an intended decision with respect to the award of the formal Solicitation, shall file with the
City’s Procurement Manager a written notice of intent to file a protest no later than seventy-two
(72) hours (excluding Saturdays, Sundays, and City recognized Holidays) after posting of the
Solicitation tabulation, or if the Solicitation tabulation is not posted, not later than seventy-two
(72) hours (excluding Saturdays, Sundays and City recognized Holidays) after receipt of written notice from the City of the Intent to Award. The initial notice of intent to file a protest shall state the basis of the protest and clearly indicate its purpose is to serve as the initial notice of intent to file a Solicitation protest. Failure to clearly indicate its intent shall constitute a waiver of the right to seek any remedy provided under the Solicitation protest procedures.
For the purposes of computation, the initial notice of intent to file a protest shall be received by the Procurement Manager not later than four O’clock (4:00) P.M. on the third working day following the day of receipt of Notice of Intended Decision or the date of posting of Solicitation tabulation.
Any Respondent that has submitted a Solicitation to the City who is affected adversely by the intended decision with respect to Solicitation award, shall file a formal, written protest within five (5) calendar days after the date of filing of the initial notice of intent to file a protest. Upon filing of the Formal Written Protest, the Respondent shall post a bond, payable to the City in an amount equal to five percent (5%) of the total Solicitation or Ten Thousand Dollars ($10,000.00), whichever is less. Said bond shall be designated and held for the payment of any costs that may be levied against the protesting party by the City, as the result of a frivolous Protest. Said security shall be in the form of a cashier’s check on a national or state bank, money order, or a protest bond executed by the Respondent and a qualified Surety authorized to do business in the State of Florida, and acceptable to the City.
Failure to submit a cashier’s check on a national or state bank, money order or bond simultaneously with the Formal Written Protest shall invalidate the protest, at which time the
City may continue its procurement process as if the original “Notice of Intent to File a Protest” had never been filed.
The formal written protest shall contain the following:
A. City Solicitation number and title.
B. The name and address of the affected party, and the title or position of the person submitting the Solicitation protest.
C. A concise statement of the facts alleged and of the rules, regulations, statutes and constitutional provisions entitling the affected party of relief.
D. A statement indicating the relief to which the affected party deems themselves entitled.
E. Such other information as the affected party deems to be material to the issue.
F. A statement of disputed issues of material fact; and
G. Bond as required by this document.
Upon receipt of Notice of Protest, timely filed, the Procurement Manager shall hold the
Solicitation process or award of contract until the protest is resolved pursuant to fundamental principles of due process, except and unless the Dispute Committee makes a written determination that the award of a contract without delay is necessary to protect substantial interests in the City.
The Dispute Committee shall, through the Procurement Manager meet with the protesting party within ten (10) working days (excluding Saturdays, Sundays and City recognized Holidays) of receipt of the formal written protest. The purpose of the meeting of the Dispute Committee, the Solicitation protestor and other affected parties is to provide an opportunity: (1) to review the basis of the Solicitation protest; (2) to evaluate the facts and merits of the Solicitation protest; (3) if possible, to reach a resolution of the Solicitation protest that is acceptable to the affected parties; and (4) if possible, to satisfy the Solicitation protestor to the extent that the
Solicitation protest might be withdrawn.
If, and in the event, the dispute cannot be resolved by mutual Contract, and there are disputed issues of material facts, the Dispute Committee shall refer the Solicitation and protest to the
City Council Members with a recommendation for resolution of the protest.
If the Council decision upholds the recommendation by the Dispute Committee regarding the award, and further finds that the Protest was either frivolous and/or lacked merit, the Council at its discretion, may assess costs, charges, or damages associated with any delay of the award, or any costs incurred with regard to the Protest. These costs, charges or damages may be deducted from the security (bond, cashier’s check on a national or state bank, money order) provided by the protestor. Any costs, charges or damages assessed by the City, in excess of the security, shall be paid by the protestor within thirty (30) calendar days of the Council’s final determination concerning the award.
“FAILURE TO FOLLOW THE PROTEST PROCEDURES REQUIREMENTS WITHIN THE TIME
FRAMES PRESCRIBED HEREIN AS ESTABLISHED BY THE CITY, SHALL CONSTITUTE A WAIVER
OF YOUR PROTEST AND ANY RESULTING CLAIMS”
3.18. Award of Contract
A. Purchase Order
The purchase order provided by the City, to the selected Respondent within the time for acceptance specified, results in a binding contract without further action by either party. The contract shall consist of this Solicitation and any addenda thereto, the
Respondent’s submittal, and established purchase order. If a contract is established, this will also become an official part of the contract. The contract shall be governed by
Lee County, Florida and interpreted, construed, and given effect in all respects according to the laws of the State of Florida.
B. Formal Award
1. Contracts shall be awarded in accordance with the provisions of the City’s
Procurement Code, Chapter 23, Article 3 of the City of Fort Myers’s Code of
Ordinances.
2. For Invitations to Bid, if none of the above apply, A contract will be awarded to the responsive and responsible Respondent with the lowest overall cost, including any alternates, if applicable.
C. Multiple Awards.
The City reserves the right, in its sole discretion, after evaluation of all responsive submittals, to award the work described herein to more than one responsive and responsible Respondent. In such cases where an award is made to more than one responsive and responsible Respondent, the City shall apportion the work among the various providers in such manner and at such time as it deems appropriate under the circumstances in its sole discretion and no minimum amount or proportion of work is guaranteed to any single provider or class of providers.
D. Term
The City intends to negotiate a contract for an initial term with the option to renew upon mutual consent of both parties. The length of the contract will be contingent upon the
Respondent’s submittal and financial investment and shall be negotiated between the
City and the successful Respondent.
E. Indemnification
The Respondent shall indemnify, hold harmless, and defend the City, and their respective City Council, Mayor, City Manager, their agents and employees, and anyone directly or indirectly employed by either of them, from and against any and all liabilities, losses, claims, damages, demands, expenses, or actions, either at law or in equity, including court costs and attorney's fees, that may hereafter at any time by made or brought by anyone on account of personal injury, property damage, loss of monies, or other loss, allegedly caused or incurred, in whole or in part, as a result of any negligent, wrongful, or intentional act or omission, or based on any action of fraud or defalcation by the Respondent, or anyone performing any act required of the Respondent in connection with performance of any contract awarded pursuant to this Solicitation.
The Respondent shall indemnify and hold harmless, and defend the City, and their respective City Council, Mayor, City Manager, their agents and employees, and anyone directly or indirectly employed by either of them, from and against all liabilities, damages, claims, demands, or actions at law or in equity, including court costs and attorneys' fees that may hereafter at any time be made or be brought by anyone arising out of any infringement of patent rights or copyrights held by others or for the disclosure or improper utilization of any trade secrets by the Respondent during or after completion of the Work. These obligations shall survive acceptance of any goods, services, and/or performance and payment therefore by the City.
F. Hold Harmless Contract
The Respondent shall Hold Harmless the City, its directors, employees and assigns, from any and all claims, suits, actions, damages, liability and expenses in connection with loss of life, bodily or personal injury or property damage, including loss of use thereof, directly or indirectly caused by, resulting from, arising out of, or occurring in connection with the performance of this contract. The Respondent’s obligation shall not be limited by, or in any way to, any insurance coverage or by any provision in or exclusion of omission from any policy of insurance.
G. Employment Eligibility: E-Verify System:
This Contract is subject to the terms, conditions, provisions and requirements of Section
448.095 of the Florida Statutes which is incorporated herein by this reference. Pursuant to Section 448.095 of the Florida Statutes, Contractor represents and warrants that it has registered with and uses the E-Verify System to verify the work authorization status of all newly hired employees and shall continue to do so at all times during the term of the Contract. If Contractor enters into a contract with a subcontractor, the subcontractor must provide the Contractor with an affidavit stating that the subcontractor does not employ, contract with, or subcontract with an unauthorized alien. A copy of the
Contractor’s E-Verify MOU must be on file with the City before any work commences.
3.19. Form of Contract
The Contract form that the City intends to use for the award is included as an attachment for reference. While this draft Contract contains standard legal language and is not routinely modified, any exceptions to this standard Contract should be clearly indicated and Respondent understands that such exceptions may affect the evaluation of the Proposal submittal.
Modification or alteration of this Contract shall only be valid if mutually agreed to in writing by the parties.
The City reserves the right to change/alter verbiage in the contract after responses are received and prior to execution based on the individual nature of each solicitation.
3.20. Execution of Contract
Unless such time is extended by the City, the successful Respondent shall, within fifteen (15) calendar days after Notice of Award is issued by the City of Fort Myers, Procurement Services, sign and enter into a Contract with the City, and simultaneously provide any required bonds, indemnities and insurance certificates. Failure to comply with the established deadline for submittal of required documents may be grounds for cancellation of the award.
3.21. Prohibition against consideration of social, political or ideological interests in government contracting
An awarding body may not request documentation of or consider a vendor's social, political, or ideological interests when determining if the vendor is a responsible vendor." Additionally, an awarding body may not give preference to a vendor based on the vendor's social, political, or ideological interests. Per F.S. Chapter 287.05701: Prohibition against considering social, political, or ideological interests in government contracting.
A. As used in this section, the term "awarding body" means:
1. For state contracts, an agency, or the department.
2. For local government contracts, the governing body of a county, a municipality, a special district, or any other political subdivision of the state.
B. An awarding body may not request documentation of or consider a vendor's social, political, or ideological interests when determining if the vendor is a responsible vendor.
1. An awarding body may not give preference to a vendor based on the vendor's social, political, or ideological interests.
C. Beginning July 1, 2023, any solicitation for the procurement of commodities or contractual services by an awarding body must include a provision notifying vendors of the provisions of this section.
3.22. Exceptions
The Respondent must IDENTIFY any variances from the Solicitation NO MATTER HOW
SLIGHT. Any exceptions to the scope must be noted and explained in detail as part of the vendor/respondent’s questionnaire. If variations are not stated in the submittal, it will be assumed that the specified material, equipment, or service fully complies with our solicitation.
3.23. Cone of Silence
Respondents to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-hour period following the agency posting the notice of intended award, excluding Saturdays, Sundays, and state holidays, any employee or officer of the executive or legislative branch concerning any aspect of this solicitation, except in writing to the procurement officer or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response. 287.057 (25) F.S.
4. GENERAL CONDITIONS
4.1. Order Of Precedence
This solicitation shall be included and incorporated in the purchase order or contract resulting from this solicitation. The purchase order or contract, including any exhibits attached thereto, contains all the terms and conditions agreed upon by the parties. No other contract, oral or otherwise, regarding the subject matter of the contract, shall be deemed to exist or to bind either party hereto.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .