26PW15 - Winter Street Storm Improvements
Open State & local contract opportunity Posted
- Solicitation number
- S-KR1079-00018469
- State
- Oregon
- Responses due
Opportunity facts
- NIGP codes
- 89030 Manholes, And Manhole Covers, Frames, Grates, Rings, Yokes, Etc.
- 91187 Storm Drainage
- 91319 Construction, Curb And Gutter (Includes Maintenance, Repair, And Removal)
- 91345 Construction, Sewer And Storm Drain
- 91381 Maintenance And Repair, Sewer And Storm Drain (Including Removal)
- 91382 Maintenance And Repair, Sidewalk And Driveway (Including Removal)
- UNSPSC codes
- Points of contact
-
- Amy Nytes bids@roseburgor.gov (541) 492-6866
- Amy Nytes anytes@roseburgor.gov (541) 492-6866
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
City of Roseburg Public Works Department in Douglas County, Oregon, is soliciting offers for the Winter Street Storm Improvements (Solicitation 26PW15), with responses due December 17, 2026. The work is on NE Winter Street and NE Brooklyn Avenue in Roseburg, Oregon 97470.
The scope includes a new 12-inch storm drain mainline, storm laterals, two storm manholes, and four curb inlet catch basins on Winter Street, plus an asphalt concrete overlay of approximately 290 linear feet. On Brooklyn Avenue, the work includes approximately 116 linear feet of new curb and gutter and removal and replacement of approximately 1,350 square feet of asphalt pavement. The plan drawings specify approximately 217 linear feet of 12-inch corrugated plastic storm drain on Winter Street, while the technical specifications list 248 linear feet of 12-inch mainline. Existing underground pipe may contain asbestos-containing materials, and friable asbestos removal requires DEQ-licensed abatement contractors. Removal of asbestos-containing pipe is included in the lump-sum demolition item at no additional cost. Concrete specifications call for 4,000 PSI for driveways and 3,300 PSI for sidewalks and curb and gutter.
Construction is limited to 7:00 AM to 5:00 PM, Monday through Friday. Saturday work requires prior authorization from the Public Works Director, and no work is permitted on Sundays or government holidays. The contractor must maintain minimum one-way traffic, with two-way traffic permitted at the end of each workday. Open trenches are limited to 300 feet, and trenches must receive permanent or temporary asphalt patching at the end of each work week or sooner if precipitation is forecast. The contractor furnishes all labor, equipment, materials, field layout, safety, traffic control, and record drawing updates, and must keep an approved set of plans on site. Work follows the 2024 Oregon Standard Specifications for Construction (ODOT/APWA), with the Technical Specifications controlling where conflicts exist. The contractor must contact the Oregon Utility Notification Center at least 48 hours before excavation. City inspections, including television inspection of storm drainage before paving, require 24 hours' notice.
Payment is structured by item. Facilities and temporary controls, demolition, and cold-plane pavement removal are lump sum. Rock excavation and foundation stabilization are paid per cubic yard, aggregate base and asphalt concrete per ton, pavement removal and replacement and curb and gutter per linear foot, and drain rock and geotextiles per square yard.
The solicitation was posted November 23, 2026, and plan drawings were revised November 19, 2026.
Files
| File | Type | Posted |
|---|---|---|
| Volume 2 Technical Specifications.pdf | ||
| Vol 1 Plan Drawings~1.pdf | ||
| Specification Documents~1.pdf |