This is a Technical Specifications document for the NE Winter Street Road & Storm Drain Improvements project, issued by the City of Roseburg Public Works Department in Douglas County, Oregon. The project scope includes construction of new partial roadway with curb and gutter improvements on NE Brooklyn Avenue, consisting of approximately 116 linear feet of new curb and gutter and removal and replacement of approximately 1,350 square feet of asphalt concrete pavement. On NE Winter Street, the work involves placing an asphalt concrete overlay approximately 290 linear feet in length, constructing approximately 248 linear feet of new 12-inch storm drain mainline, approximately 52 linear feet of new 12-inch storm drain laterals, two new storm manholes, and four new curb inlet catch basins. The contractor must maintain minimum one-way traffic during construction with two-way traffic allowed at the end of each workday. Construction hours are limited to 7:00 AM to 5:00 PM, Monday through Friday, with no work permitted on Saturdays without prior authorization from the Public Works Director, and no work allowed on Sundays or government holidays. Open trenches are limited to three hundred feet in length, and the contractor must provide either permanent or temporary asphalt concrete pavement patch over new storm drain line trenches at the end of each work week or sooner if precipitation is forecast.
Payment for work is structured as follows: Construction Facilities and Temporary Controls are paid on a lump sum basis; Miscellaneous Demolition and Site Preparation is paid on a lump sum basis and includes removal of asbestos-containing pipe at no additional cost; Rock Excavation and Foundation Stabilization are paid on a cubic yard basis; Cold-Plane Pavement Removal is paid on a lump sum basis; Brooklyn Avenue Aggregate Base is paid on a tonnage basis; Asphalt Concrete Pavement Removal and Replacement is paid on a linear foot basis by depth; Winter Street Asphalt Concrete Pavement is paid on a tonnage basis; Reconstruction Area Asphalt Concrete Pavement is paid on a tonnage basis; Curb and Gutter Removal and Replacement is paid on a linear foot basis; Drain Rock, Separation Geotextile, and Drainage Geotextile are each paid on a square yard basis. The contractor is responsible for all labor, equipment, materials, field layout, safety, record drawing updates, traffic control, and must maintain an approved set of plans on the project site at all times.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vol 1 Plan Drawings~1.pdf | ||
| Specification Documents~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUME 2
TECHNICAL SPECIFICATIONS
WINTER STREET STORM IMPROVEMENTS
PROJECT NO. 26PW15
CITY OF ROSEBURG
PUBLIC WORKS DEPARTMENT
DOUGLAS COUNTY, OREGON
James Norrington
OR PE
CITY OF ROSEBURG TABLE OF CONTENTS - VOLUME 2
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT PAGE 1
TECHNICAL SPECIFICATIONS
SECTION NO. DESCRIPTION PAGE(S)
DIVISION 1 - GENERAL REQUIREMENTS 34
01010 SUMMARY OF WORK
01025 MEASUREMENT AND PAYMENT
01040 COORDINATION
01041 EXISTING UTILITIES AND IMPROVEMENTS
01042 PUBLIC CONVENIENCE
01050 FIELD ENGINEERING
01060 REGULATORY REQUIREMENTS
01070 ABBREVIATIONS AND SYMBOLS
01100 SPECIAL PROJECT REQUIREMENTS
01225 WORK ZONE TRAFFIC CONTROL
01230 CONSTRUCTION SCHEDULING
01300 SUBMITTALS
01500 CONSTRUCTION FACILITIES AND
TEMPORARY CONTROLS
DIVISION 2 - SITE WORK 43
02050 DEMOLITION
02140 CONTROL OF WATER
02150 SHORING AND BRACING
02220 STRUCTURE EXCAVATION
02221 TRENCH EXCAVATION
02222 FOUNDATION STABILIZATION, PIPE ZONE, AND BACKFILL
02300 AGGREGATE BASE
02510 ASPHALT CONCRETE PAVEMENT
02525 CURBS & GUTTERS
02545 SURFACE REMOVAL AND REPLACEMENT
02570 SEPARATION GEOTEXTILE FABRIC
02605 MANHOLES
02710 SUBDRAINAGE SYSTEMS
02721 CATCH BASINS
02725 STORM DRAIN PIPE
02740 TELEVISION INSPECTION
DIVISION 3 – CONCRETE 9
03051 COLD WEATHER CONCRETING PROCEDURES
03300 CAST-IN-PLACE CONCRETE
03600 GROUT
PROJECT DRAWINGS
GENERAL: Sheets 1 through 3 CIVIL: Sheets 4 through 7 DETAIL: Sheets 8 through 11
SECTION 01000
DIVISION 1 - GENERAL REQUIREMENTS
SECTION TITLE
01010 SUMMARY OF WORK
01025 MEASUREMENT AND PAYMENT
01040 COORDINATION
01041 EXISTING UTILITIES AND IMPROVEMENTS
01042 PUBLIC CONVENIENCE
01050 FIELD ENGINEERING
01060 REGULATORY REQUIREMENTS
01070 ABBREVIATIONS AND SYMBOLS
01100 SPECIAL PROJECT REQUIREMENTS
01225 WORK ZONE TRAFFIC CONTROL
01230 CONSTRUCTION SCHEDULING
01300 SUBMITTALS
01500 CONSTRUCTION FACILITIES AND
TEMPORARY CONTROLS
CITY OF ROSEBURG SUMMARY OF WORK
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01010 - PAGE 1
SECTION 01010
SUMMARY OF WORK
1. GENERAL
A. The Contractor shall furnish all labor, equipment, and materials necessary to complete all work in accordance with the plans, the specifications, and the terms of the Contract. The Contractor shall be responsible for field layout of the materials and equipment, safety, record drawing updates and traffic control. This section also specifies work constraints relating to sequencing and phasing of the new improvements.
B. Project Location
1. The work is primarily focused on the intersection of NE Winter Street and NE
Brooklyn Avenue, in the City of Roseburg, Douglas County, Oregon. For more specific locations, see the location and vicinity maps on the Plans.
C. Project Scope - The project scope is briefly described as follows:
1. Basic Bid – Road & Storm Drain Improvements
a. NE Brooklyn Ave. Improvements - Work includes the following main items:
1. Construct new partial roadway with new curb & gutter and storm drain improvements on NE Brooklyn Avenue starting west of NE Winter Street. The partial street reconstruction consists of partial road base reconstruction for the placement of approximately 116 linear feet of new curb & gutter and the removal and replacement of approximately 1,350 square feet of asphalt concrete pavement. The storm drain improvements mainly consist of approximately 13 linear feet of new 12-inch storm drain and one new curb inlet catch basin.
b. NE Winter St. Improvements - Work includes the following main items:
1. Construct new storm drain improvements and asphalt concrete pavement overlay work on NE Winter St. starting south of NE Brooklyn Ave. approximately 290 linear feet. The work consists of placing an asphalt concrete overlay that is thickest at the street centerline and tapers to match the existing gutters, establishing a cross slope to convey stormwater to the gutters. The storm drain improvements mainly consist of approximately 248 linear feet of new 12-inch storm drain mainline, approximately 52 linear feet of new 12-inch storm drain laterals, two new storm manholes, and four new curb inlet catch basins.
2. Provide either permanent or temporary AC pavement patch over the new storm drain line trench at the end of each work week, or sooner if 1 inch or more of precipitation is forecast within any 24-hour period.
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01010 - PAGE 2
D. Work Sequence and Constraints
1. The Contractor shall be required to phase the work in order to maintain existing public services and minimize impacts to local businesses, other public services, roadway access, travel conditions, and business operations.
2. Open trenches shall be limited to three-hundred feet in length during construction.
3. The Contractor shall comply with the requirements from all necessary permits issued by the Owner.
4. The contractor shall perform all work necessary to complete this project in accordance with the plans and specifications including such incidentals as may be necessary to meet the intent of the project contract documents and applicable agency requirements.
5. All construction vehicles shall park on the construction site or at a location(s) indicated on the approved plan. Hours of construction for public improvements shall be 7:00 Am to 5:00 PM, Monday through Friday. Construction of public improvements is prohibited Saturday unless authorized in advance by the Public Works Director. No work is allowed on Sundays or government holidays.
Construction activities include all field maintenance of equipment, refueling, and pick-up or delivery of equipment as well as the actual construction activity.
6. The contractor shall notify Project Engineer and City of Roseburg Public Works forty-eight (48) hours in advance of starting construction and twenty-four (24) hours before resuming work after shut downs, except for normal resumption of work following Saturdays, Sundays or holidays.
7. The Contractor shall maintain minimum one-way traffic during construction with two-way traffic allowed at the end of each workday. Individual blocks can be restricted to vehicular traffic during placement of ac pavement overlays as long as approved detour routes have been established. Coordinate with City and Engineer.
8. The contractor shall keep an approved set of plans on the project site at all times.
9. Any inspection by the city, county, state, federal agency, or project engineer shall not, in any way relive the contractor from any obligation to perform the work in compliance with the applicable codes and regulations, city standards, and project documents.
10. The Contractor shall set up the traffic control as specified in Section 01225, including the temporary signage prior to beginning any of the work.
11. The Contractor shall sweep the existing pavement at the end of each day’s work.
2. MATERIALS - NOT USED
3. WORKMANSHIP - NOT USED
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01010 - PAGE 3
END OF SECTION
CITY OF ROSEBURG MEASUREMENT AND PAYMENT
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01025 - PAGE 1
SECTION 01025
MEASUREMENT AND PAYMENT
1. GENERAL
A. Measurement of Quantities
1. All Work completed under the Contract will be determined by the Engineer using United States Customary Units of Measurement. The method of measurement and computations to be used in determination of quantities of materials furnished and of work performed under the Contract will be those methods generally recognized as conforming to good engineering practices.
2. The Work completed under this Contract will be measured in accordance with the Contract Documents.
3. The term “Lump Sum” when used as an item of payment will mean full compensation for the Work described in the Contract Documents. When a complete structure or structural unit (in effect, “lump sum” work) is specified as the unit of measurement, the unit will be construed to include all necessary fittings and accessories.
B. Scope of Payment
1. Work shown in the Plans or described in Specifications for which no item is listed as part of the Contract Price or included in the payment description in this section shall be included in a Unit Price or Lump Sum item and will be considered to be included in the total Contract Price.
2. The Unit Price and Lump Sum price for furnishing each item of Work listed in the Contract Price shall include all labor, materials, tools, equipment, superintendence, and incidentals necessary to perform and complete the Work, including profit, overhead costs, permit and license fees, royalties, and applicable taxes and fees.
3. Payments for Lump Sum items will be made in proportion to the amount of Work accomplished as determined by the Engineer as of the “period ending date” of each Partial Payment Estimate. Contractor shall provide a schedule of values for each lump sum item over $10,000.
4. Payment for Materials on Hand – Partial payments may be made for materials and equipment on hand.
5. Payment for Work completed shall be made in accordance with this section and applicable sections.
C. Basic Bid – Road & Storm Drain Improvements
1. Construction Facilities and Temporary Controls
a. Payment for Construction Facilities and Temporary Controls shall be on a lump sum basis.
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01025 - PAGE 2
b. The lump sum payment shall be full compensation for mobilization, temporary utilities, fences and barricades, temporary construction, safety requirements, work zone traffic control including flaggers, as needed, and temporary signing for detouring traffic, environmental controls, and restoration and cleanup, coordination, public convenience, field engineering, regulatory requirements, construction scheduling, record drawing updates, and submittals.
2. Miscellaneous Demolition and Site Preparation
a. Payment for Miscellaneous Demolition and Site Preparation shall be on a lump sum basis and shall include demolition and the removal and disposal of all structures and facilities that are not covered by an individual bid item.
b. Payment shall include clearing, grubbing, removal and disposal of vegetation including, stumps, roots, shrubs, and trees as required for the street and storm drain improvements. A separate payment will not be made for this work.
c. Payment shall also include removal and replacement of pavement markings, adjustment of valve boxes to finish grades, removal of catch basins and storm drains, including topsoil to blend into existing grades, and roadway cleaning.
d. Payment for removal and disposal of excavated material from the trench as required for the removal of existing storm drain lines and appurtenances shall be included within the lump sum price.
e. Payment for the slurry filling of existing storm drain lines, including dewatering, necessary excavation, slurry fill including placement thereof, end caps, and associated injection and fill ports, shall also be included within the lump sum price.
f. Payment for the removal and disposal of asbestos-containing pipe as required for the new improvements shall be included within the lump sum price for Miscellaneous Demolition and Site Preparation. The amount of asbestos containing pipe on the project is unknown. The Contractor shall properly remove and dispose of all existing asbestos containing pipe that is exposed on the project at no additional cost to the Owner. A separate payment will not be made for this work.
3. Rock Excavation
a. Payment for Rock Excavation will be made on a cubic yard basis. Rock Excavation is defined as hard rock that requires a jackhammer excavator attachment in order to excavate. See specifications for further definitions. Payment shall include all excavation, removal and disposal of excavated material.
b. Rock Excavation shall be approved by the Engineer prior to any work.
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01025 - PAGE 3
4. Foundation Stabilization
a. If, in the judgment of the City Engineer, material at the bottom of an excavation is unsuitable for supporting the structure or utility for which it was intended, the unsuitable material shall be removed and replaced with compacted foundation stabilization material.
b. Payment for Foundation Stabilization will be made on a square yard basis to a depth of 12-inches, material in place. Payment shall include all excavation, removal and disposal of existing materials excavated and placement of new foundation material over a suitable geotextile fabric.
5. Cold-Plane Pavement Removal
a. Cold-Plane Pavement Removal will be paid on a lump sum basis based on an average grind depth of 2-inches over the areas indicated on the Plans.
b. Payment shall include furnishing and servicing all equipment, hauling and disposal of grindings, furnishing and installing replacement teeth on the cutting drum and performing all work required to remove and dispose of existing pavement as specified.
c. Payment for removing existing ac pavement from smaller areas where cold-plane equipment cannot operate will also be made under the lump sum price for the item Cold-Plane Pavement Removal.
6. Brooklyn Ave. Aggregate Base
a. Payment for Brooklyn Ave. Aggregate Base shall be made on a tonnage basis, weight measure as verified by tickets delivered to the Engineer.
Payment shall include specified material, hauling, placing, compacting, testing, and incidental work.
b. This item pertains to the aggregate base used in the partial street reconstruction of NE Brooklyn Ave. (approximately 119 linear feet long x 4.5 feet wide x 1.5 foot deep).
c. Contractor shall take special precautions to separate rock tickets used for this specific section of NE Brooklyn Ave. from the aggregate base used in other areas of the project.
7. Asphalt Concrete Pavement Removal and Replacement
a. Payment for Asphalt Concrete Pavement Removal and Replacement (R&R) shall be on a linear foot basis, horizontal pipeline length, by depth of asphalt and shall include all demolition, saw cutting, removal and disposal of existing pavement, placement and removal of temporary ac pavement, new permanent ac pavement, tack seals, testing, temporary cold-patching if required and all material, labor and installation costs.
b. Measurement of linear foot basis for asphalt concrete pavement shall be based on placement of a minimum of 2 inches (1 – 2” lift) of asphalt pavement over an area of the trench width plus one (1) foot.
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01025 - PAGE 4
c. The placement and removal of a temporary 1-inch lift of Level 2 AC pavement, if necessary, shall be considered incidental to the Asphalt Concrete Pavement Removal and Replacement bid item.
8. Winter Street Asphalt Concrete Pavement
a. Payment for Winter Street Asphalt Concrete Pavement shall be on a tonnage basis, based on batch weight, and shall include tack coat and testing.
b. Payment shall include all materials, labor, equipment, hauling, placement and compaction required to complete the asphalt concrete pavement required for the main overlay along NE Winter Street.
c. Payment shall include all quantities except those quantities being paid under Reconstruction Area Asphalt Concrete Pavement.
9. Reconstruction Area Asphalt Concrete Pavement
a. Payment for Reconstruction Area Asphalt Concrete Pavement shall be made on a tonnage basis, based on batch weight, and shall include sawcutting, removal and disposal of existing aggregate base / pavement as indicated on the Plans, replacement with a minimum of 4 inches (2 – 2” lifts) of asphalt pavement, tack coat, and testing.
b. Payment shall include all materials, labor, equipment, hauling, placement and compaction required to complete the asphalt concrete pavement required for the partial street reconstruction work along NE Brooklyn Avenue.
c. Payment shall include all quantities except those quantities being paid under Winter Street Asphalt Concrete Pavement.
10. Curb and Gutter Removal and Replacement
a. Payment for Curb and Gutter Removal and Replacement shall be on a linear foot basis. Measurement shall be on face of curb at flow line.
Payment shall include all removal and disposal of existing curb and gutters, cast-in-place concrete, formwork, all excavation for base rock and curb and gutter, necessary backfilling, 4-inches of aggregate base, sawcutting, weep holes, and expansion joints.
11. Drain Rock
a. Payment for Drain Rock will be made on a cubic yard basis.
b. Payment for Drain Rock shall include compensation for furnishment and placement of the Drain Rock around the 4-inch perforated drainpipe to achieve full envelopment as shown on the Plans.
12. Separation Geotextile
a. Payment for Separation Geotextile will be made on a square yard basis.
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01025 - PAGE 5
b. Payment for Separation Geotextile shall include compensation for furnishment and placement of the separation geotextile fabric in between the newly exposed subgrade and the new aggregate base rock that is to be placed as part of the NE Brooklyn Ave. partial reconstruction area shown on the Plans.
13. Drainage Geotextile
a. Payment for Drainage Geotextile will be made on a square yard basis.
b. Payment for Drainage Geotextile shall include compensation for furnishment and placement of the drainage geotextile fabric. The fabric is to envelope the drain rock & 4-inch perforated drainpipe as part of the NE Brooklyn Ave. partial reconstruction area shown on the Plans.
14. 12-Inch Storm Drain Line (<5 Ft. Depth)
a. Payment for 12-Inch Storm Drain Line (<5 Ft. Depth) shall be made on a linear foot basis for each pipe class, excavation depth as measured from existing finish grade to bottom of excavation and backfill class.
Measurement for payment quantities shall be based on horizontal length.
b. Payment for 12-Inch Storm Drain Line (<5 Ft. Depth) shall include compensation for trench excavation, pipe, trench backfill, bedding & pipe zone backfill, compaction, toning wire, fittings, transition couplings, removal of existing piping and all other incidental work.
15. 12-Inch Storm Drain Line (<10 Ft. Depth)
a. Payment for 12-Inch Storm Drain Line (<10 Ft. Depth) shall be made on a linear foot basis for each pipe class, excavation depth as measured from existing finish grade to bottom of excavation and backfill class.
b. Payment for 12-Inch Storm Drain Line (<10 Ft. Depth) shall include compensation for trench excavation, pipe, trench backfill, bedding & pipe zone backfill, compaction, toning wire, fittings, transition couplings, removal of existing piping and all other incidental work.
16. 4-Inch Perforated Drain Line (<3 Ft. Depth)
a. Payment for 4-Inch Perforated Drain Line (<3 Ft. Depth) shall be made on a linear foot basis for each pipe class, excavation depth as measured from existing finish grade to bottom of excavation and backfill class.
b. Payment for 4-Inch Perforated Drain Line (<3 Ft. Depth) shall include compensation for trench excavation, pipe, backfill, pipe zone, compaction, toning wire, fittings, transition couplings, and all other incidental work.
17. 4-Inch Solid Wall Drain Line (<3 Ft. Depth)
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01025 - PAGE 6
a. Payment for 4-Inch Solid Wall Drain Line (<3 Ft. Depth) shall be made on a linear foot basis for each pipe class, excavation depth as measured from existing finish grade to bottom of excavation and backfill class.
b. Payment for 4-Inch Solid Wall Drain Line (<3 Ft. Depth) shall include compensation for trench excavation, pipe, backfill, pipe zone, compaction, toning wire, fittings, transition couplings, and all other incidental work.
18. Storm Drain Manhole
a. Payment for Storm Drain Manhole shall be on a unit price basis per each.
b. Payment shall include compensation for aggregate base, Class B Backfill, subgrade stabilization, excavation, manhole cone, frame and lid, gaskets, adjustment rings, backfill, surface replacement, connection to new / existing storm drainpipes, grout and all incidental work for a complete installation.
c. Payment shall also include the final adjustment of the manhole frame and lid to the new finish grade including sawcutting and removing pavement, reinforcing steel, cast-in-place concrete, precast concrete grade rings, steel riser rings and all necessary work for a complete adjustment.
19. Curb Inlet Catch Basin, Type CG-3
a. Payment for Curb Inlet Catch Basin, Type CG-3 shall be on a unit price basis for each. Payment shall include precast catch basin, precast or cast-in-place concrete top, frame and lid, adjacent curb & gutter as indicated on the Plans, water quality filter system, aggregate base, excavation and backfill, grout, connection to new / existing storm drainpipes and all other related work for a complete installation.
20. 12-Inch Connection to Existing 24-inch SD Mainline
a. Payment for 12-Inch Connection to Existing 24-Inch SD Mainline shall be on a unit price basis for each. Payment shall include all labor, equipment, materials, and all other related work required to connect the new 12-Inch SD piping to the existing 24-Inch SD mainline.
21. 18-Inch Coring of Existing SD Manhole
a. Payment for 18-Inch Coring of Existing SD Manhole shall be on a unit price basis for each. Payment shall include all labor, equipment, non-shrink grout and all other related work required to connect the new SD piping to the existing SD manhole.
b. Payment for 18-Inch Coring of Existing SD Manhole shall also include all labor and material to plug the existing 6-inch pipe penetration in the existing SD manhole using non-shrink grout.
22. SD Mainline Video Inspection
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01025 - PAGE 7
a. Payment for SD Mainline Video Inspection will be measured by the linear foot of storm drain mainline inspected and accepted. Length will be measured horizontally along the pipe centerline from center of structure to center of structure (manhole, catch basin, or inlet to which the mainline connects) or to the pipe end at outfalls and stub-outs. No measurement will be made for laterals, catch basin leads, or service connections unless they are shown on the Plans as mainline. No measurement will be made for re-inspection of pipe found deficient, or for inspection repeated because the original recording was unacceptable.
b. Payment SD Mainline Video Inspection for is full compensation for all labor, equipment, materials, and incidentals required to clean and flush the mainline before inspection; perform the closed-circuit television (CCTV) inspection; provide the digital video recordings, inspection logs, and written reports in NASSCO PACP format; and coordinate inspection timing with the Engineer as specified. Cleaning debris from the pipe and disposing of it, including water used for flushing, is incidental to this item. Any re-inspection required after the Contractor corrects deficiencies (including sags, joint separations, misalignment, cracks, deflection, infiltration, or debris) will be performed at the Contractor’s expense, and no additional payment will be made.
23. Temporary Street Signage Installation
a. Payment for Temporary Street Signage Installation shall be paid on a lump sum basis. Payment shall include temporary framing and bracing materials and all other materials and work required for completing the work to current City of Roseburg requirements and Part 6 of the MUTCD.
24. Permanent Street Signage Installation
a. Payment for Permanent Street Signage Installation shall be paid on a lump sum basis. Payment shall include the relocating and resetting of the existing signpost and base, if approved by the City. If the existing signpost and/or base is unacceptable to the City, then the payment shall include the new signpost, base, mounting hardware, and all materials and labor required for completing the work as indicated in the Plans.
25. Temporary Mailbox Installation
a. Payment for Temporary Mailbox Installation shall be paid on a lump sum basis. Payment shall include temporary framing and bracing materials and all other materials and work required for completing the work to current United States Postal Service requirements.
26. Permanent Mailbox Installation
a. Payment for Permanent Mailbox Installation shall be paid on a lump sum basis. Payment shall include all materials and labor required for completing the work as indicated on the Plans and to current United States Postal Service requirements.
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01025 - PAGE 8
CITY OF ROSEBURG COORDINATION
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01040 - PAGE 1
SECTION 01040
COORDINATION
A. The Contractor shall coordinate their work with the following:
1. City of Roseburg Public Works
2. Roseburg Urban Sanitary Sewer Authority
3. Douglas County Public Works
4. Pacific Power
5. Charter Communications
6. DFN
7. Avista Gas
8. Private property owners and the public
9. Other affected utilities and agencies
B. The Contractor shall inform all private property owners prior to, during, and upon completion of any work to be performed on private property. The Contractor shall provide a minimum of 24 hours notice before entering said property.
C. Maintain at least one-way traffic at all times for private property owners that are affected by the road closure.
D. Construct all work in a systematic manner and minimize public inconvenience.
E. The Contractor shall make every reasonable effort to minimize the inconvenience to private property owners.
F. Cleanup and restoration work shall be completed in conjunction with the construction of each part of the project. The Contractor shall exercise every reasonable effort to maintain streets and property clean and clear of excess excavation, debris, dirt, and other materials.
CITY OF ROSEBURG EXISTING UTILITIES AND IMPROVEMENTS
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01041 - PAGE 1
SECTION 01041
EXISTING UTILITIES AND IMPROVEMENTS
1. GENERAL
A. Any information shown as to the location of existing utilities, topography, or structures has been compiled from the best available sources, but is not guaranteed to be accurate. The Contractor shall investigate and verify the disposition of interfering utilities and structures ahead of the work. Neither the Owner nor its agents will be responsible to the Contractor for damages as a result of underground utilities not shown on the Plans, or being in a location other than that shown on the Plans.
B. Oregon Law requires the Contractor to follow rules adopted by the Oregon Utility
Notification Center. Those rules are set forth in OAR 952 001-0010 through OAR 952 001- 0090. The contractor may obtain copies of the rules from the center by calling toll free to
(877) 668-4001 or by accessing the internet at www.digsafelyoregon.com. The contractor must notify the center at least two (2) business days, but not more than ten (10) business days, before commencing an excavation. Call toll free to (800) 332-2344.
C. The contractor shall make provisions to keep all existing utilities (including non locatable) in service and protect them during construction. Contractor shall be responsible for the immediate notification of damage to utilities and the repair or replacement of damaged utilities using materials and methods approved by the utility owner. No service interruptions shall be permitted without prior written agreement with the utility owner. No service interruptions shall be permitted without written agreement with the utility provider.
D. The Contractor shall notify all utility companies concerned at least 48 hours prior to any work in which those utilities may be involved.
E. Any utilities or structure damaged by the Contractor's operation shall be repaired or replaced in accordance with the requirements of the utility company and at the sole expense of the Contractor. Any damage shall be immediately reported to the affected owner or company.
F. If the Contractor encounters existing facilities, which will prevent the construction, he/she shall promptly notify the Engineer so that field revisions can be made. The expense of any associated delay shall be borne by the Contractor without additional cost to the Owner.
G. At locations where the Contractor's operations may damage or disturb existing facilities, no work shall be started until the Owner of such facilities has arranged for the protection thereof. The Contractor shall be solely responsible to the owners of such facilities for any damage, injury, suits, actions, claims, or expenses resulting from the Contractor's operations.
H. All trench excavations and structure excavations within two (2) feet of any existing underground utility shall be performed by hand methods in accordance with state laws.
I. The Contractor shall “pot-hole” existing storm drain mainlines or other utilities ahead of his work so that potential conflicts can be minimized or that minor relocations of the new storm drain lines can be made to lessen impact to travel ways or other structures. The Contractor shall coordinate with the Engineer as to when and where the “pot-holes” are to
CITY OF ROSEBURG EXISTING UTILITIES AND IMPROVEMENTS
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01041 - PAGE 2
be performed. “Pot-holing” is defined as performing exploratory excavation of existing pipes or other utilities to verify their location, depth, and material.
CITY OF ROSEBURG PUBLIC CONVENIENCE
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01042 - PAGE 1
SECTION 01042
PUBLIC CONVENIENCE
1. GENERAL
A. The Contractor shall conduct his work in such a manner as to minimize the inconvenience to the public, traffic, and property owners.
B. The Contractor shall confine his operations to public easements and right-of-way and property owned by the Owner. Where the Contractor is required to construct improvements on private property he or she shall keep his operations to a minimum. All disturbed areas must be restored to an original or better condition.
C. The Contractor shall maintain and coordinate access satisfactory with the needs of emergency service agencies and all affected properties.
D. Prevent dust nuisance by applying water or other specified materials at times and in locations required by the Engineer.
CITY OF ROSEBURG FIELD ENGINEERING
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01050 - PAGE 1
SECTION 01050
FIELD ENGINEERING
1. GENERAL
A. Construction Stakeout - The Engineer will provide stakeout of the construction in the form of horizontal line control as follows:
1. Each Manhole & Curb Inlet Catch Basin
2. 25-foot intervals for curbs and gutters plus angle points or points of curvature.
3. 50-foot intervals for storm drain mainline.
B. The Contractor will be solely responsible for laying out the work from this stakeout control, and no additional stakeout will be provided except at the expense of the Contractor.
C. The Contractor shall preserve construction and survey stakes for the duration of the construction. If stakeout control is lost or disturbed, and in the judgment of the Engineer needs to be replaced, such replacement shall be by the Engineer at the expense of the Contractor. The Contractor will not be allowed extensions of time or damages caused by loss of control stakes.
D. Survey Monuments
1. All survey monuments on the project’s site or that may be subject to disturbance within the construction area, or the construction of any off-site improvements shall be adequately referenced and protected prior to commencement of any construction activity. If the survey monuments are disturbed, moved, relocated, or destroyed as a result of any construction, the contractor shall, at their cost, retain the services of a registered professional land surveyor in the state of Oregon to restore the monument to its original condition and file the necessary surveys as required by Oregon State Law. A copy of any recorded survey shall be submitted to the
E. Field Revisions
1. It is expected that minor revisions of the work may be required during the course of construction. The Contractor will not be entitled to additional compensation for minor revisions or relocations.
2. Field revisions and relocations shall only be made as directed by the Engineer.
CITY OF ROSEBURG REGULATORY REQUIREMENTS
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01060 - PAGE 1
SECTION 01060
REGULATORY REQUIREMENTS
1. GENERAL
A. Contractor at all times shall observe and comply with all Federal and State laws, and lawful regulations issued thereunder, and local laws, ordinances and regulations, which in any manner affect the activities of the Contractor under this contract, and further, shall observe and comply with all orders or decrees as exist at present and those which may be enacted later by bodies or tribunals having any jurisdiction or authority over such activities of the Contractor.
B. Contractor shall be responsible and liable for all accidents, damage or injury to any person or property resulting from any activities, duties and obligations of the Contractor under this contract for which the Contractor may be legally liable, and the Contractor shall hold blameless and harmless, and shall indemnify the Owner and its officers, employees and agents against any and all claims, demands, loss, injury, damage, actions and costs of actions whatsoever which they or any of them may sustain by reason of any act, omission or neglect of Contractor or employees, agents, representatives or assignees of Contractor in connection with the activities, duties and obligations of the Contractor under this Contract.
C. Requirement of City of Roseburg Public Works (Owner)
1. The Contractor shall comply with all requirements of the City of Roseburg Public Works.
2. The Contractor shall provide the City of Roseburg Public Works and Project Engineer a twenty-four (24) hour contact person and number.
3. The Contractor shall notify Project Engineer and City of Roseburg Public Works forty-eight (48) hours in advance of starting construction and twenty-four (24) hours before resuming work after shut downs, except for normal resumption of work following Saturdays, Sundays or holidays.
4. Where the construction work will require a shutdown of any of the City of Roseburg or other utilities (water lines, service lines and sewer laterals), the Contractor shall notify the City of Roseburg, Douglas County, and City of Roseburg a minimum of one week prior to requiring the shutdown.
5. Permits
a. The Contractor is responsible for the procurement of all applicable permits, licenses and certificates relative to the trades to complete the project and for the use of such work when completed. Compliance shall be at all levels, federal, state, county, and local, relating to the performance of work.
E. Erosion and Sediment Control Requirements
1. The Contractor shall provide effective erosion control protection to include, but not
CITY OF ROSEBURG REGULATORY REQUIREMENTS
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01060 - PAGE 2
limited to, grading, ditching, hay bales, silt fencing, and sediment barriers to minimize erosion and impact to adjacent property.
2. The erosion and sediment control measures must be constructed in conjunction with all clearing and grading activities, and in such a manner as to insure that sediment and sediment laden water does not enter the storm drainage system, streets, or violate applicable water standards.
3. Storm drain inlets, basins, and area drains shall be protected until the completion of the project. Silt sack inserts with bio-bags along curb inlets and catch basins is the preferred measure for inlet protection where applicable. Contractor shall provide and maintain silt sack protection at the nearest catch basin inlet(s) downstream of the projects site. Install inlet protection to new inlets as installed.
4. At no time shall sediment be allowed to accumulate within a trapped catch basin. All silt sacks shall be inspected daily and cleaned or replaced as necessary. All catch basins and conveyance lines shall be cleaned prior to paving. The cleaning operation shall not flush sediment laden water into the downstream storm system.
5. At the completion of construction, all exposed soils must be hydroseeded and/or covered with straw and tackifier. If ground cover is not established by October 15, the open areas shall be protected through the winter with mulch, erosion blankets, or other method(s) approved by the City of Roseburg Public Works. Seeding shall be performed no later than September 31 for each phase of construction.
6. During all phases of work the Contractor shall take precautions to abate any dust nuisance. Dust shall be minimized to the extent practicable and prevention measures.
7. No person shall create physical erosion by dragging, dropping, tracking, or otherwise placing or depositing, or permitting to be deposited, mud, dirt, rock, or other debris on a public street, or into any part of the public storm water system and surface water system, or into any part of a private storm water or surface water system that drains or connects to the public storm water and surface water system. Any such deposited material shall be immediately removed by hand labor or mechanical means. No material shall be washed or flushed into any part of the storm water until all mechanical means to remove the debris are exhausted and preventative sediment filtration is in place.
F. Waste Disposal
1. The Contractor will be responsible to locate a suitable and approved location for disposal of all waste materials resulting from the project. Asbestos containing pipe shall be disposed of a specified in Section 02050.
CITY OF ROSEBURG ABBREVIATIONS AND SYMBOLS
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01070 - PAGE 1
SECTION 01070
ABBREVIATIONS AND SYMBOLS
1. GENERAL
A. The following abbreviations may be used in the plans or specifications:
AASHTO American Association of State Highway and Transportation Officials ACI American Concrete Institute AISC American Institute of Steel Construction AISI American Iron and Steel Institute ANSI American National Standards Institute APWA American Public Works Association ASHRAE American Society of Heating, Refrigeration and Air Conditioning
Engineers ASTM American Society for Testing and Materials AWWA American Water Works Association AWS American Welding Society AWPA American Wood Preservers Association CRSI Concrete Reinforcing Steel Institute ICBO International Conference of Building Officials MSS Manufacturer's Standardization Society NEC National Electrical Code NEMA National Electrical Manufacturer's Association NESC National Electric Safety Code NFPA National Fire Protection Association NLMA National Lumber Manufacturer's Association NSF NSF International ODOT Oregon Department of Transportation OSHD Oregon State Highway Division OSHA Occupational Safety and Health Act (Federal & State) SSPC Steel Structures Painting Council UBC Uniform Building Code UL Underwriters' Laboratories, Inc.
WWPA Western Wood Products Association
B. The abbreviations "N.I.C.", if shown in the plans or specifications, signifies work that is
"Not in Contract". N.I.C. indicates work to be constructed by the Owner or others and for which the Contractor will not be responsible.
CITY OF ROSEBURG SPECIAL PROJECT REQUIREMENTS
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01100 - PAGE 1
SECTION 01100
SPECIAL PROJECT REQUIREMENTS
A. Traffic Control Plan
1. The Contractor shall submit a Traffic Control Plan as specified in Section 01225 to the Engineer. The Plan must be approved by the Engineer prior to beginning any work.
B. Video Record
1. The Contractor shall provide the Engineer with a video recording of the project area on a thumb drive or digital format prior to construction.
2. The Contractor shall provide a pre-construction recording of the existing conditions for every street, parking lot, alley and easement lying within the project area and every street, alley, and access road that the Contractor will utilize for hauling materials. Provide pre-construction recording of the existing condition of each face of an existing structure (house, garages, sheds, fences, etc.) lying within 50 feet of the improvement under this contract. The recording shall show specific existing improvements such as foundation of structure, sidewalks, trees, shrubs, driveway and any other improvements, which may be affected by the Contractor's operation.
3. The recording shall be accomplished during a time of good visibility. Unless otherwise directed by the Engineer, recording will not be allowed during times of precipitation or poor visibility. When available light is not sufficient to produce a clear video image, additional lighting shall be supplied to ensure good image quality. The recording crew shall be able to work independent of any power source, utilizing battery power to operate the camera and lighting.
4. The zoom-in zoom-out rates shall be controlled so that playback will produce a clear video image of the areas recorded.
5. A legible reader-board shall be provided to visually document the date, job title, roadway identification including block number, house address, and other pertinent identification purposes, addresses, and any other audio required or as directed by the Engineer.
6. The Contractor shall submit to the Engineer a sample thumb drive or digital format, which illustrates the quality of their work. In the Engineer's opinion, the video and audio quality of all recordings made on the project shall meet or exceed that of the sample thumb drive provided. If the quality of the sample recording is not met on any particular thumb drive, then the Contractor shall re-record that portion of the work.
C. Requirements of work outside public property
1. If the Contractor decides to use areas outside of the public right-of-way or easement areas for storage of materials, disposal of materials or other construction related activities, the Contractor shall supply written documentation of approval from the property owner to the Engineer. This written documentation shall include the name of the property owner, address, phone number, printed name of authorized representative, and date of authorization.
CITY OF ROSEBURG SPECIAL PROJECT REQUIREMENTS
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01100 - PAGE 2
D. Waste Disposal
1. The Contractor will be responsible of the disposal of all waste materials resulting from the project in a suitable and approved location.
CITY OF ROSEBURG WORK ZONE TRAFFIC CONTROL
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01225 - PAGE 1
SECTION 01225
WORK ZONE TRAFFIC CONTROL
1. GENERAL
A. This section consists of providing temporary traffic control measures and furnishing, installing, moving, operating, maintaining, inspecting and removing traffic control devices throughout the Project area as specified herein and shown on the Plans and as directed by the Engineer. Traffic is defined herein as including motorized vehicles, bicycles and pedestrians.
B. Submittals
1. Traffic Control Plan (TCP)
a. Contractor shall show the overall traffic control, including work zone areas, placement of signs, barricades and other warning devices.
1. The Contractor shall provide a detailed plan to provide access to local residences at all times during construction.
b. TCP shall be in accordance with the Oregon Department of Transportation and the Uniform Traffic Control Devices and Supplements thereto.
2. MATERIALS
A. Signs, Barricades, and Other Warning Devices
1. All signs, barricades, lights, tubular markers, temporary plastic drums, flags and other warning and safety devices shall meet the requirements of the safety manual of the Oregon Department of Transportation.
2. Temporary signing shall utilize orange reflectorized sheeting background with nonreflectorized black legend as specified in Section 00225.11 of the 2024 ODOT Standard Specifications For Construction.
B. Temporary Illumination for Work
1. The Contractor will be responsible for providing additional illumination for his equipment and personnel to construct the work during nighttime operations. At a minimum, all operating equipment shall have suitable operating lights to assure that the Work is being constructed in accordance with the specifications and plans. Additional illumination may be required by City or the Engineer.
C. Equipment for Flaggers
1. Equip flaggers in accordance with Section 00223.21 of 2024 ODOT Standard Specifications For Construction.
2. All flaggers shall be certified by the state of Oregon.
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01225 - PAGE 2
3. WORKMANSHIP
A. Comply with applicable sections of the current version of the Oregon Standard
Specifications for Construction.
B. Temporary Protection and Direction of Traffic
1. Temporary protection and direction of traffic covers all work necessary to provide a safe traffic route along the road improvement project and also providing safe working areas for the Contractor’s personnel and equipment.
2. The Contractor shall provide a detailed traffic control plan for the work, showing how the work will be phased and still maintaining traffic. This includes the placement and location of temporary signs, tubular markers, barrels and barricades and related components needed to control and protect the traffic.
These plans will be submitted to the Engineer and the Owner’s representative for approval at the preconstruction meeting.
3. The Contractor shall provide and maintain such signs, barricades and warning lights as are necessary to warn and protect the public at all times on highways, roads or streets affected by work operations.
a. The traffic control shall conform to the Manual on Uniform Traffic
Control Devices with Oregon Supplement thereto.
b. The Contractor shall also provide all necessary flaggers and guards necessary to warn and protect the public. Flaggers must have a card or certificate indicating their completion of an approved work zone traffic control course.
4. When necessary, public traffic shall be permitted to pass through the work with as little inconvenience and delay as possible.
5. The Contractor shall provide access to private properties at all times, except during urgent stages of construction when it is impractical to carry on the construction and maintain traffic simultaneously. Coordinate all construction activities with the affected property owners.
6. Temporary Trench Plating
a. Place steel plates with a minimum of twelve (12) inches bearing on all sides of a cut. Anchor steel plates to minimize shifting. Shim the edges of all steel plates with cold mix asphalt.
7. The Contractor shall patrol the traffic-control area and reset all disturbed signs and traffic-control devices immediately and no later than the end of the day and will remove or cover all nonapplicable signs during periods not needed.
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01225 - PAGE 3
a. Signs and pedestals shall be placed as near the right-of-way line as practical.
8. The Contractor shall construct and maintain approved temporary detours for the protection of the work and the safe passage of traffic through the work area.
9. At the end of each day, the Contractor shall leave work in such condition that it can be traveled without damage to the work and without danger to the public.
10. Temporary Barricades and Barriers
a. Install in accordance with Section 00226 of the 2024 Oregon Standard Specifications for Construction and as specified herein.
b. Barricades
1. Barricades shall conform to ODOT Standard Drawings.
2. Relocate barriers at completion of each Construction Stage to location shown on the approved TCP.
c. At completion of construction, the Contractor shall promptly remove all barricades, barriers, signs, and attenuators.
11. Tubular Markers and Temporary Plastic Drums
a. The Contractor shall place in accordance with the current version of the
Oregon Standard Specifications for Construction. Provide additional tubular markers where required by the Engineer.
CITY OF ROSEBURG CONSTRUCTION SCHEDULING
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS PROJECT SECTION 01230 - PAGE 1
SECTION 01230
CONSTRUCTION SCHEDULING
1. GENERAL
A. This section specifies detailed scheduling requirements and procedures including interim and overall schedules.
1. The Contractor shall submit the following items as specified in this Section:
a. Overall Schedule
b. Weekly Schedule
C. Progress of the Work
1. The Contractor shall execute work with such progress as necessary to prevent delay to the overall completion of the project and with such forces, materials and equipment to assure completion in the time established by the Contract.
2. The Contractor may find it necessary to work overtime, double shifts, weekends and/or holidays if such a schedule is required to complete the project within the time allowed.
D. Overall Schedule
1. The General Contractor shall prepare and submit, within 30 days after the award of
Contract, an Overall Schedule composed of all construction operations in connection with the Contract. The Overall Schedule shall be updated monthly as per Section 01230.
2. Overall Schedule shall indicate the sequence of work and the time of starting and completion of each activity. Activities shall include, but not be limited to, the following items as they pertain to the Contract:
a. Each subcontractor's items of work.
b. Submittals from Contractor to Engineer for review and return to the
Contractor. Material and equipment order, manufacture and delivery.
c. Final cleanup.
d. Allowance for inclement weather.
3. No activity on the schedule shall have a duration longer than 21 days or assigned value greater than $100,000, except activities comprising only fabrication, and delivery may extend for more than 21 days. Activities which exceed these limits shall be divided into more detailed components. The schedule duration of each
CITY OF ROSEBURG CONSTRUCTION SCHEDULING
NE WINTER ST. – ROAD & STORM DRAIN IMPROVEMENTS…