219022 CBJTC USPFO Warehouse Renovation, Starke, FL

Closed State & local contract opportunity Posted

Solicitation number
ITB-05660
State
Florida
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from vendor.myfloridamarketplace.com. Updated .

About this opportunity

The State of Florida, Department of Military Affairs, is soliciting proposals from qualified general contractors for the renovation of the USPFO Warehouse located at the Camp Blanding Joint Training Center in Starke, Florida. The project involves a comprehensive scope of work, including reroofing, waterproofing, exterior wall repairs and coatings, window and door replacements, and mechanical system upgrades, with an estimated construction cost of $2,715,000. Bidders must submit qualifications, licensing information, and details on comparable projects, and the contract will be awarded to the lowest responsive and responsible bidder. A pre-bid meeting and non-mandatory site visit have been scheduled, and sealed bids are due on July 26, 2023. The project has a substantial completion date of 270 days after the notice to proceed, with an additional 30 days for final completion.

The solicitation does not mention any set-aside designations or restrictions on the types of organizations that can respond. It encourages minority-owned and veteran-owned businesses to participate. The solicitation does not list any incumbent vendors or current contractors, and it does not provide information on any existing infrastructure or technology that requires integration. The contract will be funded by the State of Florida, and any award is contingent upon availability of funding and annual legislative appropriations.

Opportunity text

*** 7/14/2023 - See Attached Addendum #1. This addendum forms a part of the contract documents and modifies the original bidding documents. Acknowledgement of this addendum in Exhibit 4 - Bid Proposal form is required. ***

*** 6/29/23 - An additional Non-Mandatory Site Visit is scheduled on July 6, 2023 (10 AM) at the jobsite. Allow 5-10 minutes to drive from the CBJTC Main Gate to the USPFO Warehouse ***

*** 6/29/23 See Attached Pre-Bid Meeting Agenda and Sign In Sheet ***

Solicitation Date: June 15, 2023

PROPOSALS ARE REQUESTED FROM QUALIFIED GENERAL CONTRACTORS BY THE STATE OF FLORIDA, DEPT OF MILITARY AFFAIRS HEREINAFTER REFERRED TO AS OWNER, FOR CONSTRUCTION OF:

PROJECT NUMBER: 219022

PROJECT NAME & LOCATION: USPFO WAREHOUSE RENOVATION, Camp Blanding Joint Training Center, 5629 SR 16 West, Starke, Florida 32091

ESTIMATED COST OF CONSTRUCTION: $2,715,000.00

FOR: The Florida Army National Guard, Construction & Facility Management Office

POTENTIAL RESPONDENTS TO THE SOLICITATION ARE ENCOURAGED TO CAREFULLY REVIEW ALL THE MATERIALS CONTAINTED HEREIN AND PREPARE RESPONSES ACCORDINGLY.

General Project Description (Reroof and Waterproofing): Pressure wash the existing granulated roofing cap sheet from low sloped roofs, to remove loose granules and mildew, cut out and patch blisters, where required, remove skylights, fill in and other roof penetrations from equipment relocation, removing the foil facing from the parapet and rooftop curbs. Fully adhere an 80 mil PVC fleece backed single ply cap sheet with 60 mil flashing for the 'hybrid' system to meet the manufacturer's 20-year NDL warranty. At metal roofs pressure washing the existing metal roof panels, replacing loose and backed out fasteners with new stainless steel fastener 1/8" size larger than the existing, cut out and reseal deteriorating sealant with new premium polyurethane sealant, and applying an elastomeric roof coating to provide a 20-year manufacturer's warranty. Remove and replace the edge/eave hung gutters and downspout with new prefinished aluminum gutter and downspout system. Install lightning protection system as required to meet UL master label and NFPA compliance. Pressure wash the building exterior CMU walls to remove the loose coatings, mildew, and efflorescence and mineral deposits from surfaces. Patch and repair damaged and cracked mortar joints where needed. Clean and cut out existing sealants at penetrations and apply premium polyurethane sealant prior to coating. Apply specified coating system on exterior walls including previously painted signage. Pressure wash the building exterior metal wall system to remove the loose coatings and mildew. Replacing severely rusted fasteners, securing backed out (loose) fasteners and applying a coating system on exterior metal wall panels. Clean and cut out existing sealants at penetrations and apply premium silicone sealant after coating. Remove and replace existing windows with new energy efficient fixed aluminum windows sized to fit the existing openings. Remove and replace existing exterior entry doors and hardware and exterior lighting mounted to building. Remove and reinstall all existing exterior mounted equipment and signage unless scheduled for demolition.

ABI# 1: Mechanical Systems: remove existing rooftop equipment, liquid propane and fuel tanks. Install new mechanical systems, liquid propane tank and associated electrical work, and new electrical panel. Provide new cat6 cabling to 2 separate drops, located near new power receptacles along new mechanical room 110 wall, testing per g6 standards ensuring functionality.

ABI# 2: Vault: replace vault door to be large enough for pallet jack. Add caging at entrance. Include all necessary component to meet required standards. Install new dehumidifier.

ABI# 3: Warehouse Lighting: replace all warehouse lighting in

Files

File Type Posted
Exhibit 3 FNG5085.pdf PDF
Exhibit 1 ITB.pdf PDF
Exhibit 4 5 Proposal SubList.pdf PDF
Non Techs Specs Level 4 5.pdf PDF
219022 Agenda - Sign In Sheet.pdf PDF
219022 USPFO Warehouse Reno Addendum #1.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity