This document is an addendum to a solicitation for the 219022 CBJTC USPFO Warehouse Renovation project being issued by the Florida Army National Guard, Construction & Facility Management Office. The project involves renovations to the USPFO warehouse at the Camp Blanding Joint Training Center in Starke, Florida, including reroofing, exterior waterproofing, mechanical system upgrades, vault improvements, and lighting replacements. The addendum clarifies and modifies aspects of the original bid documents, including specifications for the dock leveler, washers and dryers, wall types, toilet accessories, demolition plans, concrete bollards, fire sprinklers, and flooring and carpet products. The bid opening is scheduled for July 26, 2023.
The estimated construction cost for the project is $2,715,000. The solicitation does not mention set-asides, incumbents, or funding sources. It requires a bid bond for bids over $100,000 and performance and labor/material bonds for contracts over $100,000. Contractors must also comply with CBJTC security requirements, including background checks for all on-site personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit 4 5 Proposal SubList.pdf | ||
| Non Techs Specs Level 4 5.pdf | ||
| Exhibit 3 FNG5085.pdf | ||
| Exhibit 1 ITB.pdf | ||
| 219022 Agenda - Sign In Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Army National Guard
Construction & Facility Management Office
ISSUED ADDENDUM
Rev. 11/2018
Date July 14, 2023
ADDENDUM Number #1
Project Number and Name 219022 USPFO Warehouse Renovation
Invitation to Bid Date June 15, 2023
Number of Attachments This addendum is one document. There are no separate attachments.
Bid Opening Date and Time July 26, 2023 (2 PM – Unchanged)
From: Department of Military Affairs, CFMO Contracting Office
This addendum and the listed attachments forms a part of the contract documents and modifies the original bidding documents. Acknowledgement of this addendum in Exhibit 4 - Bid Proposal form is required.
Concerns with this addendum should be addressed to:
ng.fl.flarng.list.cfmo-contracting@army.mil
Answers to Questions
Q1. Detail 2 on sheet A504 provides a dock leveler, however the load capacity is not specified on the drawing. After reviewing pages 399 to 400 in the USPFO Warehouse Project Manual, the load capacity is not specified. Please advise.
A1. Basis of Design: NOVA Technology. Model number NMS-6006. 25,000LB Capacity.
Q2. Will the Washers and Dryers be an OFCI item? If not, please provide model numbers and specifications.
A2. Install the following owner provided washers and dryers.
a. UniMac UW Hardmount Washer-Extractors – UW65
b. UniMac UT Series Tumble Dryers – UT55
Q3. At the MMO and CIF Administration Offices, there are two (2) Latrines that will receive new drywall shown on sheet A104 based on detail 2 on sheet A300. Are we utilizing the wall type designations based on the enlarged plans shown on detail 1 of sheet A106 and details 1& 2 of sheet A107? If not, please provide enlarged plans for these Latrines.
mailto:ng.fl.flarng.list.cfmo-contracting@army.mil
A3. Wall type ‘A’ shall be utilized at new walls located at MMO and CIF Admin latrines.
Q4. Will the two (2) Latrines at the MMO and CIF Administration Offices receive new toilet accessories or utilize the existing toilet accessories?
A4. MMO and CIF Admin latrines to utilize the existing toilet accessories.
Q5. Notes number 4, 17 & 18 on sheet MD100 state to patch and paint the existing drywall. Per sheet A104, these patches are not shown on the Architectural drawings.
Could we have these areas shown on sheet A104; and are these existing walls the same as the wall types shown on sheet A000? Please advise.
A5. Patch and paint work of existing interior walls has been identified in architectural drawings. Please see attached Sheet A103 for locations.
Q6. Note number 15 on sheet M201 states to provide concrete bollards around the HVAC equipment (ABI #1). Are we to include the bollards in the base bid or the Alternate pricing #1. Please advise.
A6. Concrete bollards around HVAC equipment to be included in ABI #1
Q7. In the Building Data section shown on sheet A001, the Warehouse states the building is to be non-sprinklered. Please confirm if a fire sprinkler system is needed.
A7. A fire sprinkler system is not required.
Q8. In the Finish Schedule notes shown on sheet A000, there are several designations which specify to comply with CBJTC standards. Specification section 09 30 00 states to utilize Crossville for the ceramic floor, wall & tile base however it does not provide a model number. Specification section 09 68 13, the carpet tile does not provide a manufacturer or model. Please advise.
A8. Change: Ceramic Tile Basis of Design: Daltile – Advantage 12X12 Add: Carpet Basis of Design: Shaw – “Hit the Books” with Ultra Loc MP backing
See below MLD Addendum 1 Including Sheet A103 and the Pre-Bid Meeting
Agenda and Sign In Sheet.
ADDENDUM NO. 1
USPFO Warehouse Renovation Camp Blanding Joint Training Center
FOR: STATE OF FLORIDA, DEPARTMENT OF MILITARY AFFAIRS
July 14, 2023
This Addendum forms a part of the contract documents and modifies the drawings and specifications dated January 18, 2023, as noted below.
ITEM NO. 1: SPECIFICATIONS, SHEET A504, DOCK LEVELER DETAIL:
Clarification: Basis of Design: NOVA Technology. Model number NMS-6006. 25,000LB Capacity.
ITEM NO. 2: DRAWINGS, SHEET A002, WORK NOTE 46:
Clarification: Install the following owner provided washers and dryers.
a. UniMac UW Hardmount Washer-Extractors – UW65
b. UniMac UT Series Tumble Dryers – UT55
ITEM NO. 3: DRAWINGS, SHEET A104, RENOVATION PLAN:
Clarification: Wall type ‘A’ shall be utilized at new walls located at MMO and CIF Admin latrines.
ITEM NO. 4: DRAWINGS, ABI 11: INTERIOR FINISHES, MMO AND CIF ADMIN LATRINES :
Clarification: MMO and CIF Admin latrines to utilize the existing toilet accessories.
ITEM NO. 5: DRAWINGS, SHEET A103, DEMOLITION PLAN:
Add: Patch and paint work of existing interior walls has been identified in architectural drawings. Please see attached Sheet A103 for locations.
ITEM NO. 6: DRAWINGS, SHEET M201, RENOVATION NOTE 15:
Clarification: Concrete bollards around HVAC equipment to be included in ABI #1
ITEM NO. 7: DRAWINGS, SHEET A001, BUILDING DATA:
Clarification: A fire sprinkler system is not required.
ITEM NO. 8: DRAWINGS, PROJECT MANUAL, SECTIONS 09 30 00 AND 09 68 13:
Change: Ceramic Tile Basis of Design: Daltile – Advantage 12X12 Add: Carpet Basis of Design: Shaw – “Hit the Books” with Ultra Loc MP backing
Attachments: Sheet A103
END OF ADDENDUM NO. 1
X01
X01
A
A500
EXISTING CMU WALL
EXISTING CMU WALL TO BE REMOVED
EXISTING PARTITION WALL TO BE REMOVED
INTERIOR WALL - 3 5/8" METAL STUDS WITH
5/8" GYPSUM BOARD BOTH SIDES. PRIME
AND PAINT TWO COATS.
INFILLED SECTION OF WALL/ DOOR/
WINDOW. INFILL ALL INDICATED OPENINGS
TO MATCH EXISTING CONSTRUCTION AND
FINISH.
ELEVATION/SECTION NUMBER
SHEET NUMBER
WORK LEGEND NOTE
PHOTO MARKER
PHOTO # / SHEET #
FENCE LINE
EXPANSION JOINT
NEW DOOR, SEE DOOR
SCHEDULE, SHEET A000
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE
REMOVED
NEW WINDOW, SEE WINDOW
SCHEDULE, SHEET A000
EXISTING WINDOW TO
REMAIN
EXISTING WINDOW TO BE
REMOVED
ROOM NAME & NUMBER
FULE OIL TANK
CONCRETE SLAB
EXISTING ASPHALT
PAVEMENT
NEW ASPHALT PAVEMENT
1/A100
OT
EJ
ROOM
31. INSTALL NEW LIGHT GAUGE METAL FRAMING/FURRING STRIPS AND GYPSUM WALLS.
32. INSTALL NEW MALE AND FEMALE RESTROOMS, ACCESSORIES AND FIXTURES PER CBJTC
STANDARDS.
33. INSTALL NEW FLOORING AND WALL BASE PER CBJTC STANDARDS. SEE FINISH SCHEDULE.
34. INSTALL NEW CAN LIGHTING FIXTURES AND WALL MOUNTED EMERGENCY/EXIT LIGHTS PER
ELECTRICAL DRAWINGS.
35. PRIME AND PAINT INTERIOR WALLS WITH TWO COATS OF SHERWIN WILLIAMS PAINT PER
CBJTC COLOR SPECS. OWNER AND ARCHITECT TO VERIFY FINAL COLOR.
36. INSTALL NEW CONCRETE PAD AND METAL CANOPY AS DETAILED IN PLANS. ALSO INSTALL 1'
OF #57 BROWN RIVER ROCK ALONG PERIMETER OF NEW CONCRETE PAD AS DETAILED TO
PREVENT EROSION.
ABI 5: LOADING DOCK, SOUTH GATE OPENER, AND PEDESTRIAN GATE
37. REMOVE EXISTING FENCING, SALVAGE EXISTING CANTER LOADING DOCK GATE AND ACCESS
EQUIPMENT FOR REUSE, DOCK EQUIPMENT, HARDWARE, AND ACCESSORIES. EXTEND
EXISTING LOADING DOCK, OVERHEAD CANOPY AND STAIRS. COORDINATE WITH
STRUCTURAL DRAWINGS.
38. INSTALL NEW FENCING, REINSTALL SALVAGED CENTER LOADING DOCK GATE AND ACCESS
EQUIPMENT WHERE INDICATED ON SITE PLAN. INSTALL NEW CURB CHANNEL, MECHANICAL
DOCK LEVELERS, BUMPER BLOCKS AND PAVEMENT PARKING LINE STRIPING WHERE
INDICATED ON DRAWINGS PER MANUFACTURER’S INSTRUCTIONS.
39. INSTALL NEW ASPHALT WHERE INDICATED ON PLANS. COORDINATE WITH CIVIL DRAWINGS.
40. REMOVE EXISTING SOUTH GATE AND INSTALL A NEW ELECTRIFIED EXIT GATES WITH
AUTOMATIC OPENERS. COORDINATE WITH ELECTRICAL DRAWINGS.
41. REMOVE EXISTING NORTH GATE AND INSTALL NEW ROLLING ENTRY GATE TO MATCH
EXISTING.
ABI 6: EXISTING LATRINE BY LOADING DOCK
42. REMOVE EXISTING FIXTURES AND FINISHES. INSTALL NEW MALE AND FEMALE LATRINE
FIXTURES AND FINISHES PER CBJTC STANDARDS.
43. INSTALL NEW TANKLESS WATER HEATER AT EACH SINK PER MANUFACTURERS
INSTRUCTIONS.
ABI 7: ELECTRICAL UPGRADES
44. INSTALL NEW MOTORS TO NEW EXTERIOR OVERHEAD DOORS.
45. ADD OUTLETS WHERE INDICATED. COORDINATE WITH ELECTRICAL DRAWINGS.
ABI 8: LAUNDRY
46. DEMO EXISTING CONCRETE SLAB WHERE INDICATED ON PLANS. INSTALL NEW 8" RAISED
REINFORCED CONCRETE PAD ABOVE EXISTING FINISHED FLOOR FOR WASHERS PER
MANUFACTURER'S INSTRUCTIONS. INSTALL WASHERS, DRYERS, SINKS, TRENCH DRAIN, AND
HALF WALL WHERE INDICATED ON PLANS. COORDINATE WITH PLUMBING DRAWINGS.
ABI 9: ROLL UP DOORS AND HARDWARE
47. REMOVE EXISTING EXTERIOR ROLL UP DOORS, HARDWARE WHERE INDICATED ON PLANS.
INSTALL NEW ROLL UP DOORS. CLEAN, INSTALL NEW PREFINISHED ALUMINUM BASE
FLASHING WITH DRIP EDGE AND PRIME AND PAINT DOOR FRAMES.
ABI 10: PLUMBING
48. INSTALL NEW ELKAY EZSTL8WSLK BI-LEVEL WATER COOLER WITH BOTTLE FILLING STATIONS
WHERE INDICATED ON PLANS PER ADA REQUIREMENTS AND MANUFACTURER'S
INSTRUCTIONS. EXISTING CIF ADMIN OFFICE WATER FOUNTAINS TO REMAIN.
ABI 11: INTERIOR FINISHES
49. EXTEND EXISTING OFFICE LATRINES TO ROOF DECK AS REQUIRED PER CBJTC STANDARDS
49. CAREFULLY REMOVE AND INSTALL NEW CARPET WHERE INDICATED ON PLANS PER CBJTC
STANDARDS.
50. PRIME AND PAINT INTERIOR WALLS WITH TWO COATS OF SHERWIN WILLIAMS PAINT PER
CBJTC COLOR SPECS.
51. CAREFULLY REMOVE EXISTING ACOUSTICAL CEILING TILES IN OFFICE LATRINES. INSTALL NEW
HARD CEILING AND LIGHTING. COORDINATE WITH ELECTRICAL DRAWINGS.
52. INSTALL NEW SIGNAGE IN CIF ADMIN OFFICE SPACE TO MATCH THAT OF THE EXISTING
SIGNAGE IN THE MMO ADMIN OFFICE SPACE. CONTRACTOR TO FIELD VERIFY AND
DOCUMENT EXISTING ROOM NUMBERS AS NEW SIGNAGE SHALL INCORPORATE EXISTING
ROOM NUMBERS.
ABI 12: G6 STANDARDS
53. UPGRADE EXISTING G6 INCLUDING ALL TELECOMMUNICATION SCOPE PER CBJTC SPECS.
COORDINATE WITH ENGINEER'S DRAWINGS.
GUTTER SYSTEMS
17. CAREFULLY REMOVE EXISTING GUTTERS AND DOWNSPOUT SYSTEM. INSTALL NEW GUTTER
SYSTEM. GUTTERS SHOULD BE PROPERLY INSTALLED WITH THE BACK EDGE SLID UNDER THE
DRIP EDGE METAL OF THE ROOFING SYSTEM AND ALL THE GUTTER ENDS SHOULD BE
CAPPED. PROPERLY SLOPE THE GUTTER TO THE DOWNSPOUT ¼” PER FOOT AND POSITION
THE DOWNSPOUTS TO ENSURE THE OUTFALLS EMPTY ONTO SPLASH BLOCKS ON THE
GROUND LEVEL. ANCHOR DOWNSPOUT TO WALL SUBSTRATE AT TOP, MIDDLE AND
BOTTOM.
LIGHTNING PROTECTION
18. INSTALL LIGHTNING PROTECTION SYSTEM WITH AIR TERMINALS, ROOF COMPONENTS AND
CONDUCTORS AS REQUIRED TO MEET UL MASTER LABEL AND NFPA COMPLIANCE. ROOFER
TO SUPPLY AND INSTALL / ADHERE A MIN. 3" X 3" SACRIFICIAL ROOFING MEMBRANE PAD
UNDER ROOF BARING LIGHTNING PROTECTION COMPONENTS.
WATERPROOFING
19. PRESSURE WASH CLEAN THE EXISTING EXTERIOR WALLS AND DOORS TO REMOVE ALL
LAITANCE, MILDEW, DIRT, OIL AND LOOSE EXISTING COATINGS. CONTRACTOR TO SEAL AND
PROTECT INTERIOR FROM WATER PENETRATION. OWNER SHALL FURNISH WATER AND
UTILITIES READILY AVAILABLE ON SITE TO COMPLETE THE WORK.
20. AT CMU WALLS, CLEAN AND CUT OUT EXISTING SEALANTS AT PERIMETER OF LOUVERS,
WALL PENETRATIONS AND AWNINGS AND APPLY PREMIUM POLYURETHANE SEALANT. PATCH
AND REPAIR ABANDONED WALL PENETRATIONS AND CRACKED MORTAR JOINTS WHERE
NEEDED. REMOVE EXISTING EXTERIOR WINDOWS AND INSTALL NEW WINDOW SYSTEMS PER
CBJTC STANDARDS.
21. AT METAL WALL SYSTEM, REPLACE SEVERELY RUSTED FASTENERS AND SECURE BACKED
OUT (LOOSE) FASTENERS.
22. REMOVE ALL EXISTING SURFACE MOUNTED EQUIPMENT. APPLY PRIMER/BOND COAT AND 2
COATS PREMIUM EXTERIOR ELASTOMERIC COATING SYSTEM TO CLEANED AND PREPARED,
PREVIOUSLY PAINTED EXTERIOR IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS AND SPECIFICATIONS UNLESS NOTED OTHERWISE. PRIME SURFACES
AS REQUIRED BY COATING MANUFACTURER, COLORS TO BE SIMILAR TO, OR MATCH
EXISTING. FINAL COLOR SHALL BE SELECTED/ APPROVED BY ARCHITECT AND OWNER.
(PROTECT GLASS AND METAL FRAMES FROM OVER SPRAY, DRIPPING AND SPILLAGE DURING
EXTERIOR WALL COATING APPLICATION WORK). CONTRACTOR TO PREPARE MINIMUM 500
SF MOCK-UP AREA FOR APPROVAL BY OWNER AND ARCHITECT, TO BE BASIS OF SURFACE
PREPARATION AND COLOR MATCH FOR EACH COLOR SELECTED. (TYPICAL ALL
23. REMOVE AND REPLACE ALL EXTERIOR LIGHTING, COORDINATE WITH ELECTRICAL
DRAWINGS.
24. REMOVE EXISTING EXTERIOR ENTRY DOORS, HARDWARE AND CLOSERS WHERE INDICATED
ON PLANS. INSTALL NEW METAL ENTRY DOORS WITH ADA APPROVED HARDWARE AND
CLOSURES. CLEAN, PRIME AND PAINT EXISTING DOOR FRAMES AND INSTALL NEW WEATHER
SEAL GASKETS AND SWEEPS.
ABI 1: MECHANICAL SYSTEMS
REMOVE EXISTING ROOFTOP EQUIPMENT, LIQUID PROPANE AND FUEL TANKS AND INSTALL
NEW MECHANICAL CLOSET, MECHANICAL SYSTEMS, AND LIQUID PROPANE TANK ON NEW
8'X16' CONCRETE PAD WHERE INDICATED. COORDINATE WITH MECHANICAL DRAWINGS.
ABI 2: VAULT
26. CAREFULLY REMOVE EXISTING VAULT DOOR AND FRAME. SALVAGE AND STORE FOR USE BY
OWNER.
27. CAREFULLY ENLARGE DOOR OPENING TO ALLOW FOR A CLEAR OPENING SIZE OF 80”X78”
INSTALL NEW GSA CLASS 5-A ARMORY DOUBLE LEAF VAULT DOOR PER MANUFACTURERS
INSTRUCTIONS. INSTALL NEW DEHUMIDIFIER. COORDINATE WITH MECHANICAL DRAWINGS.
28. ADD NEW ANCHOR MOUNTED CAGING AND ROLLING GATE AT ENTRANCE OF VAULT WHERE
INDICATED ON PLANS. CAGING TO MATCH EXISTING STYLE, HEIGHT AND COLOR OF EXISTING
YELLOW CAGING.
ABI 3: WAREHOUSE LIGHTING
29. REMOVE EXISTING LIGHTING AND INSTALL NEW LIGHTING. COORDINATE WITH ELECTRICAL
DRAWINGS.
ABI 4: NEW LATRINE
30. CAREFULLY CUT AND REMOVE EXISTING CMU BLOCK WHERE INDICATED ON PLANS. INSTALL
NEW LINTELS, THRESHOLDS, AND METAL DOORS. D1-SEE DOOR ELEVATION. DEMO
EXISTING CONCRETE SLAB WHERE INDICATED ON PLANS.
LEGEND
WORK NOTES (CONT'D)
CONSULTANTS
A103
100% SUBMITTAL
PROJ. NO.
DATE
DRAWN
CHECKED
APPROVED
REVISION
REVISION DATE
154121
4/19/22
AW
IH
JS
DEMOLITION
PLAN
C A
M P
BL
A
N D
IN
G
J O
IN
T
TR
A
IN
IN
G C
EN
TE
R, S
TA
RK
E, F
LO
RI
D A
U
SP
FO
W A
RE
HO
US
E
RE
N
O V
A
TIO
N
BL
D
G
SUBMITTAL
SUBMITTAL DATE
SUBMITTAL
SUBMITTAL DATE
SUBMITTAL
SUBMITTAL DATE
SUBMITTAL
SUBMITTAL DATE
35%
65%
95%
100%
7/7/22
4/20/22
2/9/22
WORK NOTES WORK NOTES (CONT'D) WORK NOTES (CONT'D)
100% SUBMITTAL
11/15/22
1/18/23
F
F RG
50' 49'-11" 50'-1 1/2" 49'-10 1/2" 50'-1 1/2" 115'-5 1/2"
'-1
'-1
/2
'-1
/2
12'-6" 11'-8" 6'
'-7
'-8
24'-11"
9'-1"
'-4
15'-4"
29'-10 1/2"
16'-1 1/2" 32'-8"
'-4
15'-8"
'-4
16'-2" 32'-8"
'-7
/2
18'-3 1/2" '-5
/2
16'-7 1/2" 31'-6"
95'-8" 18'-1"
'-8
'-7
96'-9 1/2" 17'-6"
'-1
/2
8'-4"
31'-2 1/2"
'-4
'-9
'-3
/2
1'
A200
A200
A200WAREHOUSE NO.1 ADMIN OFFICE
ADMIN OFFICE
WAREHOUSE NO.2 WAREHOUSE NO.3 WAREHOUSE NO.4
WAREHOUSE NO.5
'-7
N
SCALE: 1/16" = 1'-0"
1 DEMOLITION PLAN
A103 0 8' 16' 32'
202020
202020 202020
202020
202020
20202020
20 20
24 24
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE WINDOW A/C UNIT.
PATCH WALL TO MATCH
ADJACENT SURFACES
REMOVE SIDE WALL GRILLE.
PATCH WALL TO MATCH
ADJACENT SURFACES
ABI# 11
ABI# 11
ABI# 11
ABI# 11ABI# 9 ABI# 9 ABI# 9
ABI# 8
ABI# 2
ABI# 9 ABI# 9 ABI# 9
ABI# 9
ABI# 5
ABI# 9
ABI# 4
ABI# 1
ABI# 1
ABI# 1
ABI# 1
ABI# 1
ABI# 1
PRE-BID SITE VISIT MEETING AGENDA
Rev. 12/2018
Date June 27, 2023 (10 AM)
Project Number and Name 219022 CBJTC USPFO Warehouse Renovation
Project Location Camp Blanding Joint Training Center, Starke, FL
Last Day for Questions July 10, 2023 (5 PM)
Date for Final Addendum July 14, 2023 (10 AM – Tentative)
Bid Opening Date July 26, 2023 (2 PM – St. Augustine, FL)
1. SIGN IN OF ATTENDEES.
2. INTRODUCTIONS.
3. GENERAL PROJECT DESCRIPTION (see bid documents for complete details).
4. SITE CONDITIONS. Prospective bidders shall examine the site for conditions under which the work is to be done before submitting their bid package. No allowance will be made for extra expenses incurred due to noncompliance with this section.
5. Work Schedule. Monday through Friday 7:30 AM to 5:00 PM. All after-hours work
(including weekend and/or holidays) or schedule changes must be coordinated with and approved by the Project Manager.
The Florida National Guard works on an alternate work schedule (AWS) where every other Monday is a scheduled day off. The contractor will be allowed to work on AWS Mondays with prior approval from the Department.
See Non-Technical Specifications C-4 and C-5 for additional information regarding work schedules on observed Federal Holidays.
6. BID BOND. For bids in excess of $100,000.00, including base bid and alternate bid items, the bidder MUST provide a good faith deposit in the amount of 5% of the bid by way of a bid bond from a surety insurer authorized to do business in the state of Florida, a certified check, or cashier’s check with their bid package.
7. PERMITS. The contractor shall obtain all required permits necessary for completion of this project from all authorities having jurisdiction; and shall include the cost of all such permits in their bid package.
8. QUESTIONS FROM BIDDERS. All questions and requests for clarifications related to this solicitation must be submitted in writing to the CFMO at ng.fl.flarng.list.cfmo-contracting@army.mil in accordance with the timeframe shown above. All questions will be answered in an addendum and posted in the same manner as the ITB.
9. REQUIRED BID PACKAGE DOCUMENTS (in this order).
• Exhibit 4 – Bid Proposal Form (include acknowledgement of Addenda)
• Exhibit 5 – Subcontractor List (indicate if “N/A”)
• Bid Bond (if applicable)
• Exhibit 3 – Contractor Qualification FNG 5085 (if requested by the
Department)
• Letter of confirmation from bonding company (if applicable)
• Contractor agreement to perform at least 15% of project work
• Florida State contractor license (if applicable)
10. BID SUBMISSION AND BID OPENING. Envelopes containing bid submission must be clearly marked:
“SEALED BID – 219022 CBJTC USPFO Warehouse Renovation ATTN: CFMO Contract Management Branch” and submitted to:
Robert F. Ensslin, Jr. Armory 2305 State Route 207 Saint Augustine, FL 32086 Attention: CFMO Contracting
In order to be considered, bids must:
• be submitted on DMA forms
• not be submitted electronically
• not be received after the exact time specified for receipt
• not be received at any location other than specified in the ITB
Bids must be submitted in full accordance with the requirements of this solicitation.
Please contact the CFMO Contract Management Office at 904-823-0255, 904-823- 0256, 904-827-8544 to confirm receipt of bid.
Federal or State picture ID is required for entry into the Robert F. Ensslin, Jr.
National Guard Armory. Bids will be accepted until the time of the Bid Opening.
11. NON-TECHNICAL SPECIFICATIONS. The Non-Technical Specifications included with the ITB are incorporated into the forthcoming contract by reference.
12. BONDS AND INSURANCE. Performance and Labor and Material Bonds are required from any persons or parties entering into a formal contract with the State of Florida for contracts in total excess of $100,000.00 for construction, additions, renovations, repairs, or demolition of any public building pursuant to Florida Statute 255.05(1). The price for these bonds and their recording fees must be included with each bid package.
The contractor will provide the owner with proof of insurance within 10 days of contract award; the price of all required insurance policies must be included in each bid package. Refer to the Non-Technical Specification for insurance requirements.
All insurance policies shall be with insurers qualified and doing business in Florida through an authorized license Florida Resident Agent.
NOTE: Owner's and Contractor's Protective Liability Insurance “OCP” is required for this project.
13. DAVIS BACON ACT. Davis Bacon Act does not apply to this solicitation.
14. DAMAGES. Damages will be assessed in accordance with the Non-Technical
Specifications.
15. CONTRACT AWARD. Per Florida Administrative Code 60D-5.004, the project will be awarded to the responsive and responsible bidder that has submitted the lowest price for the base bid or base bid plus alternate bid item.
NOTE: Award of this contract is contingent upon funding from the State of Florida.
16. MY FLORIDA MARKETPLACE VENDOR INFORMATION PORTAL “VIP”. The
MFMP VIP is the primary source of information relating to this solicitation. Any solicitation information obtained from sources other than the Vendor Information Portal should not be relied on by prospective bidders. Bid solicitations received from other sources should be validated with the official solicitation on the Vendor Information Portal.
17. UNAUTHORIZED ALIENS. The Department shall consider the employment by any contractor of unauthorized aliens a violation of Act 274A of the Immigration and Naturalization Act. Such violation shall be cause for unilateral cancellation of this contract.
18. CAMP BLANDING JOINT TRAINING CENTER PROJECT SECURITY
REQUIREMENT (Post Contract Award and Execution). The Contractor is REQUIRED to submit to the Project Manager a list of all Contractor’s and Sub- Contractors’ employees that could possibly work on the project (Last Name, First Name, Driver’s License Number. (For employees that do not have a driver’s license, a US Passport, State ID card, Government issued Photo ID or Work Visa are acceptable. Note: Non US citizens can not use a foreign passport for work purposes. They must have a work visa or Permanent Resident Card.
All Contractor’s and Sub-Contractors’ employees will have a background check run to pre-authorize their entrance on to Camp Blanding. If they have not been pre-approved, they will not be allowed on base. After contract execution, a form will be provided to the Contractor and the approval process takes approximately 5 business days. The Department will not be responsible for any costs incurred by the Contractor or Subcontractors due to employee approval delays as a result of late, incorrect and/or incomplete forms submitted by the Contractor.
19. CFMO PROJECT MANAGER COMMENTS.
20. UNIT REPRESENTATIVE COMMENTS.
21. A & E COMMENTS.
22. CONTRACTOR QUESTIONS / CONCERNS.
23. SITE VISIT.
NO VERBAL STATEMENTS MADE BY ANY STATE OF FLORIDA EMPLOYEE OR
AGENCY REPRESENTATIVE WILL SUPERSEDE INFORMATION PUBLISHED IN
THE SOLICITATION. ONLY WRITTEN ADDENDA ISSUED BY THE DEPARTMENT
OF MILITARY AFFAIRS CONSTRUCTION AND FACILITY MANAGEMENT OFFICE
WILL AMEND THIS SOLICITATION.
SIGN IN SHEET
Meeting Subject _P_r_e-_B_id_M_e_et_in...,,.g'--------------
Project Number and Name 219022 CBJTC USPFO Warehouse Renovation
Date and Time June 27, 2023 (10 AM)
Name Firm / Directorate Email Address Phone
Fred Levinson CFMO Contracting lr/'17)
Fred.e.levinson.nfg@army.mil 904-823-0255
~-.:J8¢-9;i~/ r
Name Firm/ Directorate Email Address Phone
I
..D ~
| 219022 USPFO Addendum #1 - FINAL |
| MLD Addendum No. 1 With Sheet A103 |
| 219022 CBJTC USPFO Warehouse Renovation Pre-Bid Meeting Agenda |
| 219022 CBJTC USPFO Warehouse Renovation Pre-Bid Meeting Sign In Sheet |
File details come from the government source that posted it. Updated .