2026 LMIG Roadway Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66213-NONST-2027-000000019
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
- 95121647 Elevated roadway or highway
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141106 Gravel or dirt road construction service
- 72141001 Highway and road new construction service
Show all 33
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
- 72153700 Parking facility construction and equipment installation and maintenance and repair services
- 95121645 Motorway service area
- 95121644 Parking lot
- 72141123 Manhole construction service
- 95111500 Limited traffic thoroughfares
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
- 95111611 Trunk road
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- 72152708 Parking lot construction service
- 95121646 Bicycle parking rack
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- Point of contact
-
- Jennifer Harrison jkidd@cityofhoschton.com (706) 654-3034
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Hoschton, Georgia is requesting sealed bids for 2026 LMIG roadway improvements across seven streets and one alley, with bids due August 6, 2026 at 2:00 p.m. at City Hall, 61 City Square, Hoschton, Georgia 30548. Questions are due by 5:00 p.m. on July 30, 2026, with clarifications provided in Addendum 1. Award will be based on bid price, experience in similar work, and references, with contract award anticipated within 60 days of bid opening.
The scope encompasses approximately 480 tons of 9.5 mm asphalt Superpave, 286 tons of asphalt patching, 4,300 square yards of 12-inch soil-cement stabilization, 430 square yards of 6-inch graded aggregate base course, 98 cubic yards of class B concrete base and pavement widening, 120 cubic yards of foundational backfill material, 340 linear feet of header curb, 589 linear feet of RCP storm drain (ranging from 15-inch to 24-inch), 30 drainage structures, 13,460 linear feet of thermoplastic pavement striping (5-inch and 24-inch), signage, structure adjustments, shoulder reconstruction, and traffic and erosion control measures. Project completion is 90 consecutive calendar days from written Notice to Proceed.
The prime contractor must perform a minimum of 30 percent of the contract work. A bid bond or certified cashier's check equal to 5 percent of the total bid amount must accompany all bid submissions. The successful bidder must provide insurance, workers' compensation insurance, and performance and payment bonds in the amount of 100 percent of the total bid. All surety and insurance companies must maintain an AM Best rating of A-6 or greater. The City of Hoschton has acquired all necessary state and federal permits and 100 percent of required easements and rights-of-way. This project is financed through the Georgia Department of Transportation's Local Maintenance and Improvement Grant program. Contract documents, specifications, and construction drawings are available for a non-refundable $200 fee or at no cost in digital format from Engineering Management, Inc., Jessica James at jjames@eminc.biz, (770) 962-1387, or fax (770) 962-8010.
Opportunity text
City of Hoschton, Georgia 2026 LMIG Roadway Improvements on New Street, East Broad Street, Oak Street, Joshua Way, Fawn Court, Josh Pirkle Road, and Hawthorne Way Alley. Bids will be received at City of Hoschton, City Hall, 61 City Square, Hoschton Georgia, 30548 until 2:00 p.m. on Thursday, August 6, 2026. The Project consists of, but is not limited to the following major elements: Approximately 480 Tons of 9.5 mm Asphalt Superpave, 286 Tons of Asphalt Patching, 4,300 SY of 12-inch Soil-Cement Stabilization (CSRB), 430 SY of 6-inch Graded Aggregate Base Course, 98 CY of Class B Concrete Base and Pavement Widening, 120 CY of Foundational Backfill Material, 340 LF of Header Curb, 30 LF of 24-inch RCP Storm Drain, 524 LF of 18-inch RCP Storm Drain, 35 LF of 15-inch RCP Storm Drain, 30 Drainage Structures, 3,200 LF of 5-inch White Thermoplastic Pavement Striping, 10,200 LF of 5-inch Yellow Thermoplastic Pavement Striping, 60 LF of 24-inch Thermoplastic Pavement Striping, Signage, Adjusting Structures to Grade, Shoulder Reconstruction, Traffic and Erosion Control Measures. Time of completion for all work associated with this project shall be ninety (90) consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. A Bid Bond will be required with proposal submission. Copies of Contract Documents, Specifications, and Construction Drawings may be obtained by contacting Jessica James of Engineering Management, Inc. at 303 Swanson Drive Lawrenceville, GA 30043, or Email jjames@eminc.biz, or Phone 770-962-1387 or Fax 770-962-8010.
Files
| File | Type | Posted |
|---|---|---|
| SEC00030.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity