2025 I-84 Bridge Approach Paving Bundle
Closed State & local contract opportunity Posted
- Solicitation number
- S-73000-00012736
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Micah Lederer r4admin@odot.oregon.gov (541) 388-6180
- Joni Sirovatka joni.a.sirovatka@odot.oregon.gov (514) 207-7265
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
The Oregon Department of Transportation (ODOT) has issued an Invitation to Bid (ITB) for the 2025 I-84 Bridge Approach Paving Bundle project, specifically targeting bridge approaches in Wasco County. The procurement seeks a contractor to perform cold plane pavement removal and install a 2-inch HMAC (Hot Mix Asphalt Concrete) inlay at specific bridge locations, including the Deschutes River bridge (Mile Post 99.87, westbound) and the John Day River bridge (Mile Post 114.60, both eastbound and westbound directions). Targeted project areas include approach sections measuring 40' x 125' and 32' x 125', with required deliverables encompassing comprehensive traffic control and temporary pavement markers. The project requires using Level 3 Inch Dense Graded Commercial Asphalt Concrete Pavement with PG64-28 asphalt cement, adhering to strict technical specifications. Key deadlines include the bid submission due date of April 7, 2025, with a mandatory preconstruction conference and work commencement within 10 working days after the meeting. Traffic lane closures are permitted Monday through Wednesday between 5:00 a.m. and 7:00 p.m., maintaining a 16-foot lane width.
While no specific set-aside designations or disadvantaged enterprise requirements are explicitly detailed in the provided documentation, the project includes specific technical and operational constraints that will influence contractor qualifications. Load restrictions are stringent, limiting combined vehicle weight to 65,000 pounds per 1,000 square feet on the bridges. ODOT will handle permanent striping after job completion, and contractors will be paid upon contract work completion with no retainage held. Though the exact budget range is not specified in the available documents, the project's technical complexity and specific infrastructure requirements suggest a moderate to significant investment. Contractors will need to demonstrate capabilities in highway infrastructure maintenance, asphalt paving, traffic management, and compliance with precise engineering specifications. The project's focused scope on bridge approach rehabilitation indicates a targeted infrastructure improvement initiative within the I-84 corridor in Wasco County.
Opportunity text
The purpose of this ITB is to establish a Contract for the cold plane pavement removal of the listed bridge approaches and the inlay of 2 inches of HMAC to match existing grade on approaches at the locations defined in Attachment A, including required traffic control and temporary pavement markers
Files
| File | Type | Posted |
|---|---|---|
| 00012736 Att B.xlsx | XLSX spreadsheet | |
| Sole Source Determination_2-4-25_Redacted.pdf | ||
| 00012736 Att A.docx | DOCX document | |
| 00012736 Invitation to Bid.docx | DOCX document | |
| 00012736 Prelim Bid Results.xlsx | XLSX spreadsheet | |
| 00012736 Corrected Prelim Bid Results.xlsx | XLSX spreadsheet |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity