2001-25 DB-RFQP 10th St. Chiller 1 & 2 Replacement Design-Build Services
Closed State & local contract opportunity Posted
- Solicitation number
- PE-50300-RFP-2025-000000136
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90610 Buildings - Architectural Design
- 90625 Design Build Services
- 90638 General Construction - Architectural
- 90735 Designing Services
- 90927 Building Construction, Educational
- 91172 Design / Bid Contingency
- 91185 Special Trade Constructon, Power Plant
- 91230 Construction, Power Plant
- 92537 Facilities Design Services, Engineering
- UNSPSC codes
- 95121900 Educational and research buildings and structures
- 72121406 School building construction service
- 72121409 Public library construction
- 95121911 High school
- 95121907 Meteorological station
- 95121909 Elementary school
- 95121905 Language laboratory
- 95121904 Library
- 95121908 Research or testing facility
- 95121910 Junior high or middle school
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Georgia Institute of Technology, through its Planning, Design & Construction unit, is seeking Statements of Qualifications (Step 1 RFQ) from firms interested in providing Design-Build Services for the replacement of Chillers 1 & 2 at the 10th Street Chiller Plant on the Georgia Tech campus in Atlanta, Georgia (GT Bid-Contract No. 2001-25/GT Project No. 0527-2024/BOR Project No. BR-J431). Qualified respondents may be shortlisted for interview and invited to submit proposals (Step 2 RFP). The project involves replacing the original 30-year old chillers, associated cooling towers, and constructing a shared condenser water pumping system with future expansion capability. Minimum qualifications include financial capacity, licensing, and safety requirements. Evaluation criteria focus on the firm's stability, relevant experience, qualifications, and suitability for the project. The response is due on 07/16/2024, and construction is expected to take place between November 2025 and March 2026, contingent on funding availability.
The solicitation encourages participation from minority, women-owned, and small businesses, and will comply with Georgia's Reciprocal Preference Law. The successful Design-Builder will be required to certify compliance with the Immigration Reform and Control Act and Georgia's Security and Immigration Compliance Act. The estimated project budget is $11,625,000, with a preliminary stated cost limitation of $10,625,000. No details are provided regarding any incumbent vendors or existing infrastructure that requires integration.
Opportunity text
08/12/2024: Addendum #1 Dated 08/13/2024 released; please ensure to acknowledge by signing it & including it with your Qualifications submission package. 07/16/2024: GT Planning, Design & Construction unit is soliciting Statements of Qualifications (Step 1 RFQ) from Firms interested in providing Design-Build Services for a project known as ¿10th Street Chiller Plant, Replacement of Chillers 1 & 2¿ (GT Bid-Contract No. 2001-25/GT Project No. 0527-2024/BOR Project No. BR-J431¿ located at the Georgia Institute of Technology campus, Atlanta, Georgia. Respondents who are determined qualified may be shortlisted for Interview and offer proposals for these services (Step 2 RFP). Please see attached DB-RFQP document package in the ¿Documents¿ tab.
Files
| File | Type | Posted |
|---|---|---|
| Exhibit A.docx | DOCX document | |
| Exhibit B.docx | DOCX document | |
| Exhibit E General Conditions Breakdown.xlsx | XLSX spreadsheet | |
| Addendum _1 Dated 08_13_2024.pdf | ||
| Exhibit C.docx | DOCX document | |
| Exhibit D Precon Cost Expense Breakdown.xlsx | XLSX spreadsheet | |
| Exhibit F Project Cost Matrix.xlsx | XLSX spreadsheet | |
| Exhibit G.docx | DOCX document | |
| 2001_25 DB RFQP_Final.pdf | ||
| J_431 Shortlist Announcement.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity