Exhibit C.docx

DOCX document 17 KB Posted

Attached to
2001-25 DB-RFQP 10th St. Chiller 1 & 2 Replacement Design-Build Services
Solicitation number
PE-50300-RFP-2025-000000136
Issued by
Fulton County, Georgia

About this file

This document is the Design Builder (DB) Fee Proposal for a design-build contract opportunity related to the replacement of Chillers 1 and 2 at the 10th Street Chiller Plant on the Georgia Institute of Technology campus in Atlanta, Georgia. The project is being solicited by the Georgia Tech Planning, Design & Construction unit (Bid-Contract No. 2001-25/GT Project No. 0527-2024/BOR Project No. BR-J431). The DB's fee includes design consultants, pre-construction, and construction services, with fixed fees proposed for each. The DB must also provide maximum amounts for pre-construction and construction overhead costs and expenses. Respondents who are determined qualified through an initial Request for Qualifications (RFQ) may be shortlisted for an interview and asked to submit proposals.

The pricing terms include a breakdown of the DB's fees and overhead costs. There are no details provided on any set-asides, incumbents, funding requirements or sources, or other salient information. The contract opportunity covers work in the jurisdictions of Fulton County and the City of Atlanta, Georgia.

View the file

Other files

File Type Posted
Exhibit F Project Cost Matrix.xlsx XLSX spreadsheet
Exhibit D Precon Cost Expense Breakdown.xlsx XLSX spreadsheet
2001_25 DB RFQP_Final.pdf PDF
J_431 Shortlist Announcement.pdf PDF
Exhibit G.docx DOCX document
Exhibit B.docx DOCX document
Addendum _1 Dated 08_13_2024.pdf PDF
Exhibit E General Conditions Breakdown.xlsx XLSX spreadsheet
Exhibit A.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit C “Insert Project Title”

DESIGN BUILDER (DB) FEE PROPOSAL

(Submit In a Sealed Envelope with Attachment, Exhibit D and E at Interview)

1. DB’S FEE:

Basis of Fee. The DB’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the DB as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the DB performs all the requirements of the Contract Documents within the time limits established. If applicable, the fees and costs should be broken down by each site within a multi-site project.

A. DESIGN CONSULTANTS FEE:

Design Consultants Fee. Representing the fee amount for basic design services and construction administration services provided by DB. Owner shall pay to DB a Design Consultants Fee:

TOTAL

Design Fee (fixed fee)
$

B. PRECONSTRUCTION FEE:

Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by DB, Owner shall pay to DB a Preconstruction Fee:

TOTAL

Pre-Construction Fee (fixed fee)
$

C. CONSTRUCTION FEE:

Construction Fee. Representing the gross profit for the construction services provided by DB. Owner shall pay to DB a Construction Fee.

TOTAL

Construction Fee (fixed fee)
$

2. DB’S PRECONSTRUCTION & CONSTRUCTION OVERHEAD COSTS and EXPENSES:

The DB’s Overhead Costs. The maximum amount for the DB’s Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses.

AMOUNT

A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount)

B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount)

Total Maximum Overhead Cost (Sum of A & B)

DB Firm Name

By: Signature of DB Officer

Title of DB Officer

File details come from the government source that posted it. Updated .