Z2DA--657A4-23-790 Repair Cooling Tower 1, PB
Closed Pre-Solicitation Posted
- Solicitation number
- 36C25523R0129
- Agency
-
Veterans Integrated Service Network 15
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- 66048, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Contract Opportunity is for the repair of Cooling Tower 1 at the John J. Pershing VA Medical Center in Poplar Bluff, MO. The contractor will be responsible for providing all services, materials, labor, supervision, safety, certification, and expertise for the repair and replacement of leaking components, including the complete coil assembly and associated piping connections, as well as conducting a thorough analysis of the entire system to ensure there are no additional leaking components. The period of performance is estimated to be approximately 120 calendar days after Notice to Proceed (NTP), with the solicitation to be posted on or about September 11, 2023.
List of products and services to be provided by the contractor:
- Removal and replacement of all leaking components, including the complete coil assembly and associated piping connections in cooling tower 1.
- Isolation of chiller 1 by means of removing R-134a refrigerant, sealing refrigerant piping and circuits, and maintaining a nitrogen charge to all refrigeration piping and circuits A and B.
- Maintenance of operation of chiller 2 and cooling tower 2 during construction.
- Isolation and draining of condensing water piping necessary to complete the replacement of the leaking component.
- Draining of refrigerant from circuits A and B into approved refrigerant cylinders with proper labeling.
- Removal of Seismic bracing, if necessary.
- Thorough analysis of the entire system to ensure there are no additional leaking components.
- Cleaning of all refrigeration piping with an approved product and drying with nitrogen.
- Re-charging of the refrigeration circuits A and B with r-134a.
- Submission of field drawings and materials as required by the specifications.
Notice text
Pre-Solicitation Notice
Project Number 657A4-23-790 Repair Cooling Tower 1
NCO15 Contracting is asking for responsible vendors to meet the attached statement of work. This is a total set-aside for all SDVOSB vendors. The vendors must meet all evaluations factors as indicated in the solicitation document.
The Statement of Work is for performance of work associated with construction documents for the project 657A4-23-790 Repair Cooling Tower 1 at the John J. Pershing VA Medical Center, located at 1500 North Westwood Boulevard, Poplar Bluff, MO 63901. The contractor shall provide all services, materials, labor, supervision, safety, certification and expertise for items described in the provided Construction Documents; drawings and specifications. Work shall be phased in a manner that is not disruptive to Medical Center Operations.
Contractor shall remove and replace all leaking components to include the complete coil assembly and associated piping connections in cooling tower 1 (Building 1 roof over penthouse). Contractor shall provide all materials and means necessary to complete the service. In order to properly remove and replace said components, contractor shall isolate chiller 1 (Building 1 penthouse) by means of removing R-134a refrigerant, sealing refrigerant piping and circuits and maintaining a nitrogen charge to all refrigeration piping and circuits A and B to prevent moisture contamination of all refrigeration piping to include circuits A and B during the scope of the Project. Contractor must maintain operation of chiller 2 and cooling tower 2 during construction. Contractor shall also isolate and drain condensing water piping necessary to complete the replacement of the leaking component to include the refrigerant coil on cooling tower 1. Refrigerant from circuits A and B shall be drained into approved refrigerant cylinders with proper labeling meeting the requirements of the EPA. It is anticipated that Seismic bracing must be removed to complete the work but will be at discretion of the contractor. Upon replacement of known leaking components to include the complete coil assembly and piping connections, contractor will then conduct thorough analysis of entire system to ensure there are no additional leaking components. At the completion of the repair and replacement of the refrigeration coil, the contractor shall clean all refrigeration piping with an approved product and dry with nitrogen to include the proper purging prior to re-charging the refrigeration circuits A and B with r-134a. All steps of clean, drying purging and charging of refrigeration circuits A and B shall be verified by the VA. Images of cooling tower 1 are depicted in Appendix A Cooling Tower 1 Photos. Dimensional drawings are depicted in Appendix B Cooling Tower 1 Dimensions. The contractor shall review any as-built drawings, specifications, and field verifications in conjunction with the performance of this project. Contractor will submit field drawings and materials as required by the specifications.
The period of performance is estimated to be approximately 120 calendar days after Notice to Proceed (NTP). The principal NAICS code for this acquisition is 236220, Commercial and Institutional Building Construction, and the FSC is Z2DA, Repair or Alteration of Hospitals and Infirmaries, Business size of $45 Million. The Solicitation will be posted on or about September 11, 2023.
Files
| File | Type | Posted |
|---|---|---|
| 36C25523R0129.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Cooling Tower, Roofing, and Structural Construction | Bureau of Engraving and Printing | Total Small Business | |
| CON | Z1DA | replace or chillers | 580-23-105 | solicitation | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| J041--Condenser Coils Replacement for the VA Illiana Health Care System (VAIHCS), located at 1900 E. Main Street, Danville, IL 61832. | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business | |
| Z2NZ--Turn Key Chiller Equipment (Purchase and Install) | Veterans Integrated Service Network 16 | No set-aside | |
| Cooling Tower Refurbishment - Three (3) Cells | Indian Health Service | Indian Small Business Economic Enterprise |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity