Z2DA--542-23-201 | Replace Roofs Building 69 and 139 | NCO 4 Construction East (VA-26-00047303)
Closed Solicitation Posted
This opportunity was awarded. See its 2 award notices in the notice history.
- Solicitation number
- 36C24426B0010
- Agency
-
Veterans Integrated Service Network 4
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4 seeks demolition, abatement, repair, and replacement of roofs on Buildings 69 and 139 at the Coatesville VA Medical Center in Chester County, Pennsylvania, with proposals due July 16. This is a firm fixed-price Invitation for Bid with no unit price allowances or lump sum allowances for unforeseen conditions.
Place of performance is the Coatesville VA Medical Center at 1400 Blackhorse Hill Road, Coatesville, Pennsylvania 19320. Building 139 (Patient Dining Hall) scope includes removal and replacement of pitched asphalt shingle roofing and flat low-slope EPDM roofing, removal of existing skylights with infill roofing membrane, replacement of lightning protection systems to meet current code requirements, and abatement of asbestos, lead, and other hazardous materials. Building 69 requires flat roof replacement. The contractor must develop phasing plans in coordination with the Coatesville VA Medical Center to maintain 24/7 facility operations, with 50% of Building 69 work required after-hours at no additional cost. All work must comply with VA Technical Information Library specifications, industry standards, applicable building codes, and maximize energy efficiency.
The NAICS code is 236220, Commercial and Institutional Building Construction; the PSC code is Z2DA, Repair or Alteration of Hospitals and Infirmaries. Bids are due July 16, 2026, at 12:00 PM EDT via email to Lamar.Thomas2@va.gov. Bid opening occurs via Microsoft Teams. A mandatory pre-proposal site visit was held June 10, 2026. The solicitation number is 36C24426B0010. The contractor must comply with VA construction safety standards, Pre-Construction Risk Assessments, Infection Control Risk Assessment requirements, federal records management obligations, GEMS environmental compliance, and VA privacy training requirements for all personnel. Contractor Experience Modification Rate must be 1.0 or less with no more than three serious, one repeat, or one willful OSHA violations in the past three years. All on-site workers must complete OSHA 10-hour or 30-hour construction safety training or other competency training determined by the Construction Safety Committee. All contractor employees require tuberculosis testing and TB-FREE certification prior to construction start.
Notice text
4 versions
Update #4 · Latest ·
Amendment to 36C24426B0010
Update #3 ·
Replace Roofs Building 69 and 139
Project No. 542-23-201, Solicitation 36C24426B0010
Amendment No. 002
Additional Contractor Questions and VA responses (bold).
Please provide a copy of the phase 1 asbestos survey/report (or any applicable hazardous materials report) covering the scope of work for this project. This can be found in the Design Narrative - Appendix DÂ
The taper drawing on sheet A-105 shows a Y-panel start at the roof drain with a starting thickness of 1½-inch (R-8.6). The taper drawing on sheet A-110 shows an X-panel start at the roof drain with a starting thickness of ½-inch (< R-3). This contradicts with Specification Section 07 22 00, paragraph 2.1.A.2 which requires an R-10 minimum (or 1¾-inch) at any location. Which taper should be provided, the ones shown in the plans, or that which is in the specifications? The tapered insulation layouts included in the drawings are provided to show intended slope of the finished roof. These do not include information about a base layer which will be required on each building to achieve the required R-values: minimum R-10 and overall average R-33 as required in the specification refer to section 072200 2.1 A.  Tapered insulation shop drawing submittal shall include evidence of calculated average R-value meeting this minimum requirement.
Please provide a typical roof system detail for the shingle assembly similar to that shown on Detail 2/A-503 for the low-slope assembly.
Where does the composite nail base specified in Section 07 22 00, paragraph 2.4.D get installed? Please specify the thickness required. This was taken from the VA.TIL specs we had left this in the specifications for the penthouse shingled roof. Â VA requires adherence with the specification.
For the skylight removal on Building 139, Details 2 & 3/S-104 appear to indicate that a new raised deck will be installed approximately 14-inches above the existing roof. This would create a base flashing condition. Sheet A-107 does not show this raised area. Will the new structural deck at the skylight removal be flush with the existing deck, or will it be raised? If raised, please provide details showing the roof flashing and termination conditions at this area. The design intent is for the roof deck infill to be placed on the existing curbs and be raised as shown in the detail on S104. This allows for the 6" cold form to be installed to support the new ceiling within these skylights. The flashing detail is similar to Detail 4 found on sheet A503.
Section 07 31 13, paragraph 2.1.A refers to Section 09 06 00 for the shingle Basis of Design. The 09 06 00 specification states the shingle size, shape, and manufacturer are to be selected. Please provide a basis of design for the shingles. Refer to section 073113 2.2, for requirements.
Will snow guards be required on the shingle roof? There are currently snow guards installed in the shingle roof only above the penthouse doorway but not the entire perimeter. VA requires to maintain snow guards in that location.  These are listed in 073113 2.7
Section 07 52 16.11, paragraph 2.3.C.2: are bio-based SBS modified bitumen products applicable to this project? Yes, cold applied membrane adhesives are required to have bio-based content. Refer to 075216 2.5 C and D
Referring to Detail 3/A-503, the replacement fascia appears to be a unique custom prefabricated item. Please provide a manufacturer basis of design for this fascia. Include material type and size/thickness. Also, please provide attachment requirements and details. Match existing adjacent trim in materiality and method of connection.Â
Referring to Detail 3/A-503, the shingles and roof felt appear to be installed over some sort of insulation and a wood starter block. Is this insulation currently in-place? What substrate will the shingles be nailed to? Nail base (refer to question 4). Note that this is not a vented product consider a vented nailboard (see Hunter Cool-vent as an example).Â
Refer to the phasing plan for Building 139 (Sheet A-108). Phases 03, 04, and 05 entail installing and flashing new HVAC units prior to installing the new roof assembly under phases 06, 07, and 08. The new roofing and flashing assemblies (SBS modified bitumen) are incompatible with the existing EPDM assemblies. The new flashing installed during phases 03, 04, and 05 cannot be properly sealed to the existing EPDM. Can Phases 03, 04, and 05 be combined with phases 06, 07, and 08? If not, please provide tie-in details between the new modified system and the existing EPDM system. The specified final membrane flashings for the modified bitumen roof system should be installed during phase 06, 07 and 08. Install temporary watertight seals compatible with existing EPDM roofing for work in phases 03, 04 and 05. Unless otherwise noted, prep surrounding existing roofing with membrane cleaner and primer, and install EPDM membrane patch material (typical peel and stick patch roll with pressure sensitive adhesive backing and release liner) to make curbs weathertight until reroofing phase work begins.
Refer to the phasing plan for Building 139 (Sheet A-108). Which trade provides and installs the penetration housings listed under Phases 03, 04, and 05? Typically a mechanical contractor provides/installs and the roofing contractor flashes to the roof, but decision falls on prime contractor and specifications.
Advise what are the ICRA Levels in the areas below the roof level where items are to be removed and decking repairs are required. For example, where skylights and penetrations are to be removed. Refer to Appendix E of the Design Narrative Â
Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements? ICRA barrier approval will come after formal submittal process to awarded contractor.
Roof plans indicate providing roof curb extensions. Please advise if sizes of curbs or model numbers of existing equipment can be provided. Please clarify required height of extension. Refer to General Notes on M101. Additional info requested was "if possible" - I do not have that information at this minute, and I have not yet received any further detail. But the question regarding the curbs is covered in the General Notes. If I get anything further today I will send it but this response should be satisfactory.Â
Confirm there are no existing asbestos or hazardous materials to be removed. This can be found in the Design Narrative - Appendix DÂ
Update #2 ·
Replace Roofs Building 69 and 139
Project No. 542-23-201, Solicitation: 36C24426B0010
Amendment No. 001
Contractor Questions and VA Responses in bold Part 1.
Include Site Visit Contractor sign-in sheet dated 6/10/2026.
Bids due July 9, 2026, at 12:00 PM EDT
Provide design narrative.
Will piping riser need replaced below roof drain? Not indicated on drawings. Or just the roof drain itself? Per drawings: only roof drains.
Will there be any equipment replaced? Or just reusing existing? Both.
Designated laydown area location? Laydown is usually discussed after project award.
Will temporary equipment be needed? Not likely.
What is the pipe size for the roof drains? Contractor to verify.
Please provide a copy of the phase 1 asbestos survey/report (or any applicable hazardous materials report) covering the scope of work for this project. See attached design narrative. If an asbestos report is not available, please advise whether the Contract Documents will allow for a Unit Price Allowance to address potential asbestos abatement activities. Not Applicable. Contract will be firm fixed price.
The solicitation states that the Contractor is to repair damage due to leaks and age as needed and required for Building 139 s roof structure. As these appear to be unforeseen conditions, please confirm if a lump sum Allowance, or a Unit Price Allowance would be able for bidders to provide to price this work. If so, please provide details on how to price this work. Conditions are available in attached design narrative. No unit price allowance or allowance will be used.
Please confirm if there are any associated warranties with the existing roof structures along with any information of existing roof materials. None currently on record.
Has a roof condition survey or core cuts been performed? Yes. If so, can we have the report and photos? See design narrative for report and photos.
Please confirm if Note 2/A102 is for only (1) glass panel or multiple. If so, please provide the quantity. Drawing A102 Note 2 show 1 panel. Contractor to verify.
On building 69, Is the Natatorium part of the scope of work? It does not currently have lightning protection. To meet UL standards, it needs lightning protection. Do they want lightning protection installed as part of this project? Only portions as indicated in the drawings. Mostly resealing, redirecting drainage and replacing a pane of glass. Again, this is all indicated clearly in the bid documents. Lighting protection is shown to be replaced as indicated on the drawings and as directed by the VAMC.
On building 139, Is the masonry coping being replaced with metal coping? Not replaced covered with metal coping see detail A 502-11
Do asbestos and lead surveys/reports currently exist for buildings 69 & 139? If so, can the VA publish them for our review? Please review design narrative.
Since there is no asbestos section in the specifications, we assume there is no abatement required under this contract, only an investigation per the Project Understanding section of the solicitation. Is this accurate? Correct.
During the freezer condenser work on building 139, is the contractor responsible to develop the phasing plan only, and not assist with the relocation of food items? That is correct. Contractor will not handle VA food stuffs.
Do the temporary safety railings atop building 139 get demolished and put back after the roof is completed? See note on drawing AD-102 and A-107.
Do the temporary safety railings around the existing skylights atop Building 139 get demolished, or does the VA want to keep them? Some will need to be reused in accordance with the note on A-107 any remaining will be returned to VA.
For the tree removal noted on AD-102, does the VA want the stumps ground or removed as well? Yes. Please remove stumps.
Section 07 22 00, paragraph 2.2.B.3: are bio-based insulation products applicable to this project? Possibly. Contractor will need to show it conforms to specification.
During the scheduled site visit we were not allowed access to the roof of Building 69 to investigate existing conditions. The reasoning being that access would have to be through an extension ladder set-up on the exterior of the building and that fall protection would be needed. OSHA Section 1926.500(a)(1) allows inspectors to be exempted from the fall protection requirements when performing an inspection before or after the performance of work. This includes verification inspections as we tried to perform during the site visit. We request a consecutive 3-hour period where two of our inspectors can investigate the existing conditions of this project on the rooftop. While OSHA guidelines provide this exemption, we do not require OSHA certification for site visits. No additional site visits will take place. Please see design narrative for current conditions of both roofs.
If a formal inspection time will not be provided, please comment how discrepancies between plans and actual field conditions will be handled. Any discrepancies from plans and conditions provided by the VA will be handled in post-award.
Will the sign-in sheet from site visit be available in addendum? See attached.
Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO? No. See Spec 013526 1.9
If no to the question above, will the SSHO need to be full-time for this project? SSHO will need to maintain full time presence on jobsite as shown in Spec 013526 1.9
Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC? Yes. See spec 014500 3.4 B.
If no to the question above, will the QA/QC need to be full time for this project? N/A
Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? No.
Please confirm if tax should be included in our proposal? Bids should be inclusive of all allowable contractor costs. Contract is firm fixed price.
Will shutdowns be required to be done during off hours or weekends? There is a strong possibility of that occurring.
Are there any areas in either buildings that require advanced notice of work activity or vibration control? Yes. Building 69 contains audiology, recreation therapy and physical therapy. Basically the whole building. Building 139 is the patient dining hall. Areas over patient serving and dining would pose greatest concern.
Is there a particular vendor or contractor currently servicing and maintaining the Building Automation System or Temperature Controls System? CM3 holds the contract for this.
To allow sufficient time to review responses and prepare our bid we kindly request that you please extend the bid date. Bid date extended one week to 7/9/2026.
Will both construction areas share a laydown area? Please indicate the laydown areas for both Building 69 and Building 139 on Staging Plan drawing sheets A-001 A-002. Laydown areas will be agreed upon by VA and contractor after contract award.
Can both buildings be worked on concurrently? Yes.
Please confirm the bid package requirements for submission (ex. SF 1442, Acknowledgment of Amendments, Completed Limitations on Subcontracting, etc.) Please see submission requirements outlined in the solicitation for bid response.
Update #1 ·
Project Understanding
The construction site is located at the southwest intersection of East Kings Highway and North Caln Road, outside the incorporated limits of Coatesville in Chester County. The site is an existing VA Medical Center known as the Coatesville VA Medical Center. This project shall include design service for a demolition, abatement, repair, and replacing of the roof of buildings 139 and 69 at the Coatesville VA Medical Center. This includes the pitched roof of building 139, the flat roof of building 139, and the flat roof of building 69.
Building 139: Patient Dining Hall
The contractor s responsibility for abatement of any asbestos, lead, and other hazardous materials and the replacement and repair of the roof of Building 139 in its entirety including both the pitched asphalt shingle and the flat (low slope) EPDM roofing. This will also include the protection and preservation of the existing facilities.
There are skylights on the flat (low slope) EPDM roof that were to be removed. The existing skylights will be removed in their entirety. The remaining voids left by the existing skylights will now be in filled and covered with roofing membrane. The existing lightning protection will be removed and replaced with code compliant protection equipment.
This project will provide complete and functional systems in accordance with the Department of Veterans Affairs (VA) requirements, Technical Information Library (https://www.cfm.va.gov/til/spec.asp), industry standards and all applicable code requirements. This applies to each system and every system, which is affected by this project, even if only partially modified. The systems and equipment will maximize energy efficiency to the extent practical.
The contractor is to fully demolish the current pitched asphalt shingled roof of Building 139 as well as the flat (low slope) EPDM roof section covering the building space.
The contractor is to develop phasing plans with assistance from the CVAMC to phase temporary relocation of refrigerated and frozen goods within the existing kitchen that is utilizing existing walk-in cooler and freezers when the roof curbs for the freezers condensing units are being installed.
The contractor is to provide plans for new curb rails for equipment with proper maintenance clearances taken into amount of 12 inches above the EPDM roof and install them.
The contractor is to repair damage due to leakage and age as needed and required for Building 139 s roof structure. This includes but is not limited to roof decking, roof supports, or other structural components.
The contractor is to replace the pitched asphalt shingle roof as well as the flat (low slope) EPDM roofing of Building 139 with proper adherence to the pitch diagrams in the drawings to ensure proper drainage.
The contractor is to remove the current lightning protection on the roof and replace it with code complaint lightning protection equipment for Building 139 as a full replacement.
The contractor is to remove the skylights above the dining hall space in Building 139 their entirety. The voids in the roof where the skylights currently are located will be infilled and have added roofing material applied over the substrate matching the roofing deck and supports adjacent to the voids.
The contractor is to remove the existing sconce lighting in the skylight lightwell, with remaining surfaces patched and repaired as necessary. New pendant fixtures are to be installed in the existing lightwell utilizing existing circuitry. The drywall areas adjacent are to be repainted as noted in construction documents.
The contractor is to install new EPDM protection walking pads to access required equipment upon the roof.
The contractor is to remove two trees alongside the building that have their limbs resting on or hanging over the roof of Building 139 as denoted in the construction documents.
The contractor is to protect the integrity of the equipment that is to be preserved on the roof that will be removed and reinstalled to replace the roof of Building 139.
The contractor is to investigate the space for asbestos, lead, and any other harmful materials. The contractor will create a plan to abate it within Building 139 s construction zone as applicable and intact such plan.
Building 69: Physical Medicine and Rehabilitation, KT, OT, PT, Audiology, Speech, Prosthetics
For building 69, the contractor will fully encompass the abatement of any asbestos, lead, and other hazardous materials and the replacement and repair of the roof of Building 69 in its entirety but not limited to its flat (low slope) EPDM roofing. This will include the protection and preservation of the existing facilities.
There is dunnage on the flat (low slope) EPDM roof that will be removed and the area around it repaired while considering the structural integrity of the roof when performing this task. The lightning protection of the building will be removed and replaced with code required protection equipment.
The Coatesville VAMC has identified existing exhaust fans that are no longer in service which will be removed. Any voids remaining will be infilled and covered with roofing material.
The glazed natatorium will have targeted repairs identified to further ensure it is watertight.
This project will provide complete and functional systems in accordance with the Department of Veterans Affairs (VA) requirements, Technical Information Library (https://www.cfm.va.gov/til/spec.asp), industry standards and all applicable code requirements. This applies to each system and every system, which is affected by this project, even if only partially modified. The systems and equipment will maximize energy efficiency to the extent practical.
The contractor is to demolish the current flat (low slope) EPDM roof of Building 69 while preserving the integrity of the building.
The contractor then will replace the (low slope) EPDM roofing of Building 69 as well as any damaged equipment or structure damaged during demolition. All new installed roofing by the contractor is to be pitched according to the pitch plan in the construction documents to ensure proper drainage.
The contractor is to repair any structural damage due to leakage and age as needed and required for Building 69 s roof structure. This includes but is not limited to the metal roofing decking, roofing supports, and any other structural components.
The contractor is to investigate the space for asbestos, lead, and any other harmful materials. The contractor will create a plan to abate it within Building 69 s construction zone as applicable and intact such plan.
The contractor is to remove the lightning protection on the roof and replace it with code required lightning protection equipment for Building 69.
The contractor is to investigate the structural effect of removing the dunnage on the roof of Building 69 and how it can be efficiently and safely done with minimal impact on the structural integrity of the building. The contractor will then intact the approved plan.
The contractor is to install new EPDM protection walking pads to access required equipment upon the roof.
The contractor is to provide plans for new curb rails for equipment with proper maintenance clearances taken into amount of 12 inches above the EPDM roof and install them.
The contractor is to protect the integrity of the equipment that is to be preserved on the roof that will be removed and reinstalled to replace the roof of Building 69.
The glazed natatorium have targeted repairs identified in the construction documents that the contractor is to complete to ensure it is watertight. This includes investigating any potentially additional issues that would cause water penetration in the glass structure and repair them.
General Requirements -
All work will occur Monday to Friday from 6:30 am to 5 pm. All evidence of work on the project must be cleaned and removed daily to prevent patient tampering. At no time will tools or an active job site be unmanned.
Some after-hours work must be conducted and must be coordinated with the COR, the Electricians, Plumbers, HVAC, and/or the CVAMC medical staff.
Contractors will need to remain highly flexible to rearrange scheduling when necessary. An extensive partnership and coordination must be designed between the contractor, the COR, Contracting Officer, the CVAMC engineering staff, and the CVAMC medical staff.
The contractor must provide their own storage. The CVAMC has a small field where a construction trailer can be placed only for the duration of the project and must be coordinated with the COR for size and footprint. Parking shall occur only in approved places so the need to shuttle men and materials may be necessary. Other than this location, the VA will not supply storage space. All exterior work will require a locked 6-foot chain link fence around the perimeter. A dumpster must always remain secured.
Contractor must be responsible to verify all site conditions prior to performing any work. Contractor must follow all Guidelines and Standards, applicable to the task, as described in the Construction Safety Standards and Master Construction Specifications all available on the VA Technical Information Library. No production or purchases shall occur until all products are submitted for approval as per Section 01Â 33Â 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. Submittal Drawings shall show size, configuration, and fabrication and installation details.
The Contracting Officer is the only one who can authorize the proceeding of work through signed documentation. The Contractor must substantiate those manufacturers and installers qualifications which comply with specifications. Contractor must provide a minimum one-year warranty on all material and workmanship unless otherwise noted in the specifications.
All work shall be performed in compliance with all Federal, State and Local laws and regulations. In addition, work must meet equipment s manufacturer specifications and generally accepted industry standards of good workmanship. All waste materials must be disposed of by the contractor in compliance with Federal State and Local laws and regulations. Contractors will supply receipts for quantities of material removed for recycling accountability. The lot T21 is used for metal recycling and shall receive all metal debris and for disposal.
No work may proceed by the contractor until all material cut sheets are submitted to the COR for approval. COR will review and submit to Contracting Officer. No work may proceed until Contracting Officer authorizes work. The COR is not authorized to issue a Notice to Proceed.
A site visit must be conducted with perspective offerors to visually access the site to avoid mistaken installation practices. The reference materials listed below must be cited with all perspective offerors. Offerors will receive a briefing on parking, facilities, and patient safety prior to submitting a bid as the proposal may be affected by hospital procedures.
Contractor must be required to comply with physical security requirements to include checking in with the VA Police or VA sponsor/COR each time they come on site to perform services and obtaining a VA compliant ID badge which must be always worn while on VA property.
All damage done to structures, equipment, or VA property by the contractor during construction is to be repaired as per the specifications at the contractor s expense.
Contractor will have 270 days to complete the project from NTP.
Files
| File | Type | Posted |
|---|---|---|
| 36C24426B0010 0003.docx | DOCX document | |
| 36C24426B0010 0002.docx | DOCX document | |
| 36C24426B0010 0001.docx | DOCX document | |
| 542-23-201 Replace roof 69 and 139 sign in.pdf | ||
| Design Narrative.pdf | ||
| NARA RM CONTRACT LANGUAGE CLAUSE for CVAMC Contracts.docx | DOCX document | |
| P11 VHA ICRA 542-23-201 - Signed.pdf | ||
| S02 542-23-201 Drawing.pdf | ||
| S02 36C24426B0010 542-23-201 06012026.docx | DOCX document | |
| S02 Attachment 5 GEMS Contractor Training.doc | DOC document | |
| P11 2025-05-15 - 542-23-201 - Electrical.pdf | ||
| P11 20939V-1.pdf | ||
| P11 VHA PCRA 542-23-201 - Signed.pdf | ||
| S02 Attachment 6 Construction Safety Standards 8_17_22.pdf | ||
| Drone Pre-Flight Checklist.pdf | ||
| P11 Submittal Log Buildings 69 and 139 CVAMC.xlsx | XLSX spreadsheet | |
| P11 EOC-20.pdf | ||
| S02 542-23-201 Specifications.pdf |
Show all 18
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z2DA--542-23-201 | Replace Roofs Building 69 and 139 | NCO 4 | Award Notice | |
| Z2DA--542-23-201 | Replace Roofs Building 69 and 139 | NCO 4 | Award Notice | |
| This notice | Solicitation | |
| Z2DA--542-23-201 | Replace Roofs Building 69 and 139 | NCO 4 Construction East (VA-26-00047303) | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z1DA--542-21-113 | Correct FCA Deficiencies – Repair Water Penetration | NCO 4 Construction East (VA-26-00020634) (VA-26-00020634) | Veterans Integrated Service Network 4 | Service-Disabled Veteran-Owned Small Business | |
| Y1DA--replace roofs and repair facades building 6 and 7 at the northport VA medical center project number: 632-23-112 | Veterans Integrated Service Network 2 | No set-aside | |
| Building 13 Stair and Roof Replacement at Castle Point VAMC | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC | Veterans Integrated Service Network 4 | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--657-26-102JC FCA Replace Various Roofs on BLDG 1, JC | Veterans Integrated Service Network 15 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity