36C24426B0010 0002.docx
DOCX document 224 KB Posted
- Attached to
- Z2DA--542-23-201 | Replace Roofs Building 69 and 139 | NCO 4 Construction East (VA-26-00047303)
- Solicitation number
- 36C24426B0010
About this file
This file contains contractor questions and VA responses for a roof replacement project at the Coatesville VA Medical Center. The project (No. 542-23-201, Solicitation 36C24426B0010) involves demolition, abatement, repair, and replacement of roofs on Buildings 139 and 69. Building 139 work includes removal and replacement of both pitched asphalt shingle roofing and flat low-slope EPDM roofing, along with removal of existing skylights to be infilled with roofing membrane and replacement of lightning protection systems. Building 69 requires flat roof replacement. The contract is firm fixed price with no unit price allowances or lump sum allowances for unforeseen conditions. Bids were due July 9, 2026, at 12:00 PM EDT, with a mandatory site visit held on 6/10/2026.
Key clarifications provided include confirmation that only roof drains (not piping risers) require replacement, both reuse of existing equipment and new equipment replacements are included in scope, roof drain pipe sizes must be verified by the contractor, and asbestos survey/report information is available in the attached design narrative. The VA clarified that tapered insulation layouts shown in drawings do not include base layer information and that shop drawing submittals must demonstrate compliance with minimum R-10 and average R-33 requirements per Specification Section 07 22 00. The contractor must develop phasing plans in coordination with Coatesville VA Medical Center to minimize disruption to existing facilities while maximizing energy efficiency in accordance with VA Technical Information Library standards and applicable code requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24426B0010 0003.docx | DOCX document | |
| 542-23-201 Replace roof 69 and 139 sign in.pdf | ||
| Design Narrative.pdf | ||
| 36C24426B0010 0001.docx | DOCX document | |
| S02 36C24426B0010 542-23-201 06012026.docx | DOCX document | |
| P11 EOC-20.pdf | ||
| P11 2025-05-15 - 542-23-201 - Electrical.pdf | ||
| S02 Attachment 5 GEMS Contractor Training.doc | DOC document | |
| P11 VHA ICRA 542-23-201 - Signed.pdf | ||
| P11 Submittal Log Buildings 69 and 139 CVAMC.xlsx | XLSX spreadsheet | |
| Drone Pre-Flight Checklist.pdf | ||
| S02 542-23-201 Specifications.pdf | ||
| S02 542-23-201 Drawing.pdf | ||
| NARA RM CONTRACT LANGUAGE CLAUSE for CVAMC Contracts.docx | DOCX document | |
| P11 VHA PCRA 542-23-201 - Signed.pdf | ||
| P11 20939V-1.pdf | ||
| S02 Attachment 6 Construction Safety Standards 8_17_22.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Roofs Building 69 and 139 Project No. 542-23-201, Solicitation 36C24426B0010 Amendment No. 002
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-02-2026 542-23-201 00244 Department of Veterans Affairs Network Contracting Office 4 Coatesville VAMC 1400 Blackhorse Hill Road Coatesville
PA
19320 00244 Department of Veterans Affairs Network Contracting Office 4 Coatesville VAMC 1400 Blackhorse Hill Road Coatesville
PA
19320 To all Offerors/Bidders
36C24426B0010 06-01-2026
X X X Solicitation is amended to provide the following:
1. Provide Part 2 of answers to RFI received.
All bids must be submitted by 7/9/2026 at 12:00 PM EDT via email ONLY to vanessa.chmielewski@va.gov
1. Additional Contractor Questions and VA responses (bold).
1. Please provide a copy of the phase 1 asbestos survey/report (or any applicable hazardous materials report) covering the scope of work for this project. This can be found in the Design Narrative - Appendix D
2. The taper drawing on sheet A-105 shows a Y-panel start at the roof drain with a starting thickness of 1½-inch (R-8.6). The taper drawing on sheet A-110 shows an X-panel start at the roof drain with a starting thickness of ½-inch (< R-3). This contradicts with Specification Section 07 22 00, paragraph 2.1.A.2 which requires an R-10 minimum (or 1¾-inch) at any location. Which taper should be provided, the ones shown in the plans, or that which is in the specifications? The tapered insulation layouts included in the drawings are provided to show intended slope of the finished roof. These do not include information about a base layer which will be required on each building to achieve the required R-values: minimum R-10 and overall average R-33 as required in the specification – refer to section 072200 2.1 A. Tapered insulation shop drawing submittal shall include evidence of calculated average R-value meeting this minimum requirement.
3. Please provide a typical roof system detail for the shingle assembly similar to that shown on Detail 2/A-503 for the low-slope assembly.
4. Where does the composite nail base specified in Section 07 22 00, paragraph 2.4.D get installed? Please specify the thickness required. This was taken from the VA.TIL specs –we had left this in the specifications for the penthouse shingled roof. VA requires adherence with the specification.
5. For the skylight removal on Building 139, Details 2 & 3/S-104 appear to indicate that a new raised deck will be installed approximately 14-inches above the existing roof. This would create a base flashing condition. Sheet A-107 does not show this raised area. Will the new structural deck at the skylight removal be flush with the existing deck, or will it be raised? If raised, please provide details showing the roof flashing and termination conditions at this area. The design intent is for the roof deck infill to be placed on the existing curbs and be raised as shown in the detail on S104. This allows for the 6" cold form to be installed to support the new ceiling within these skylights. The flashing detail is similar to Detail 4 found on sheet A503.
6. Section 07 31 13, paragraph 2.1.A refers to Section 09 06 00 for the shingle Basis of Design. The 09 06 00 specification states the shingle size, shape, and manufacturer are to be selected. Please provide a basis of design for the shingles. Refer to section 073113 2.2, for requirements.
7. Will snow guards be required on the shingle roof? There are currently snow guards installed in the shingle roof only above the penthouse doorway but not the entire perimeter. VA requires to maintain snow guards in that location. These are listed in 073113 2.7
8. Section 07 52 16.11, paragraph 2.3.C.2: are bio-based SBS modified bitumen products applicable to this project? Yes, cold applied membrane adhesives are required to have bio-based content. Refer to 075216 2.5 C and D
9. Referring to Detail 3/A-503, the replacement fascia appears to be a unique custom prefabricated item. Please provide a manufacturer basis of design for this fascia. Include material type and size/thickness. Also, please provide attachment requirements and details. Match existing adjacent trim in materiality and method of connection.
10. Referring to Detail 3/A-503, the shingles and roof felt appear to be installed over some sort of insulation and a wood starter block. Is this insulation currently in-place? What substrate will the shingles be nailed to? Nail base (refer to question 4). Note that this is not a vented product – consider a vented nailboard (see Hunter Cool-vent as an example).
11. Refer to the phasing plan for Building 139 (Sheet A-108). Phases 03, 04, and 05 entail installing and flashing new HVAC units prior to installing the new roof assembly under phases 06, 07, and 08. The new roofing and flashing assemblies (SBS modified bitumen) are incompatible with the existing EPDM assemblies. The new flashing installed during phases 03, 04, and 05 cannot be properly sealed to the existing EPDM. Can Phases 03, 04, and 05 be combined with phases 06, 07, and 08? If not, please provide tie-in details between the new modified system and the existing EPDM system. The specified final membrane flashings for the modified bitumen roof system should be installed during phase 06, 07 and 08. Install temporary watertight seals compatible with existing EPDM roofing for work in phases 03, 04 and 05. Unless otherwise noted, prep surrounding existing roofing with membrane cleaner and primer, and install EPDM membrane patch material (typical “peel and stick” patch roll with pressure sensitive adhesive backing and release liner) to make curbs weathertight until reroofing phase work begins.
12. Refer to the phasing plan for Building 139 (Sheet A-108). Which trade provides and installs the penetration housings listed under Phases 03, 04, and 05? Typically a mechanical contractor provides/installs and the roofing contractor flashes to the roof, but decision falls on prime contractor and specifications.
13. Advise what are the ICRA Levels in the areas below the roof level where items are to be removed and decking repairs are required. For example, where skylights and penetrations are to be removed. Refer to Appendix E of the Design Narrative
14. Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements? ICRA barrier approval will come after formal submittal process to awarded contractor.
15. Roof plans indicate providing roof curb extensions. Please advise if sizes of curbs or model numbers of existing equipment can be provided. Please clarify required height of extension. Refer to General Notes on M101. Additional info requested was "if possible" - I do not have that information at this minute, and I have not yet received any further detail. But the question regarding the curbs is covered in the General Notes. If I get anything further today I will send it but this response should be satisfactory.
16. Confirm there are no existing asbestos or hazardous materials to be removed. This can be found in the Design Narrative - Appendix D End of Document image1.png
File details come from the government source that posted it. Updated .