Z1NE--405-23-001 | Water Tank Painting and Repair

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C24123R0112
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 is seeking bids for water tank painting and repair services under Solicitation Number 36C24123R0112. The scope of work includes surface preparation, coating application, and repairs to the tank foundation, roof hatches, vents, ladders, and railings of a 500,000-gallon elevated water storage tank located at the VA Medical Center in White River Junction, Vermont. Key requirements include compliance with SSPC and AWWA standards, providing full-time inspection services, and disinfecting the tank after painting. Proposals are due by April 4, 2024 and will be evaluated based on factors such as past performance, safety, and the contractor's approach to self-performing a minimum of 25% of the work.

The solicitation was initially set-aside for Service-Disabled Veteran-Owned Small Businesses and Veteran-Owned Small Businesses, but has been changed to a small business set-aside. The current incumbent is not known. The anticipated contract value is over $150,000, with a period of performance of 365 calendar days from the notice to proceed. Offerors must pay prevailing wages determined by the Department of Labor for the location.

Notice text

4 versions

Update #4 · Latest ·

1

NOTICE OF FOR PROPOSAL AMENDMENT

SOLICITATION NUMBER: 36C24123R0112

AMENDMENT NUMBER: 0003

DATE: March 25, 2024

PROJECT NUMBER: 405-23-001

PROJECT TITLE: Water Tank Painting and Repair

LOCATION: VA Medical Center, White River Junction, VT 05009

REASON FOR AMENDMENT: Answer RFI Questions 1 thru 13 & Extend Proposal Deadline

___________________________________________________________________________

AMENDMENT: 0003

Question 1 SOW states Contractor shall provide two temporary water storage tanks, each holding at least 6,000 gallons. Tanks shall be piped together and tied into the water service and distribution lines. The temporary water storage tanks shall be able to hold at least 70 PSI of water pressure

Using tanks that are 6,000 gals and able to handle at least 70 psi of pressure is tall order. Those type of tanks are very expensive at that size. Is it possible to use static tanks with temporary pumps that could be triggered from the BMS?

VA Response:Â Â Yes, that would be fine. The tanks are intended to be used as a temporary tower. The 70 PSI will be maintained with the water pumps in building 2. The VA intends to have the water service flow through the tanks to keep the stored water fresh. The tanks will be wired into the BMS system at the water tower. The BMS is a Siemens Desigo Building Automation system.

Question 2 SOW states Water tanks shall be wired into the Building Management System (BMS) to communicate with the two VFD water tower supply pumps in building 2 to maintain a full condition. The water tanks will serve as a temporary water tower, providing an emergency supply of water to the campus in case of any failure by the municipal water system.

We are not quite clear on what is needed and how to integrate the tanks into the BMS.

What needs to be integrated ? Is it the pressure and / or levels?

VA Response:Â A level indicator needs to be on the tanks to be sure they remain full.

Question 3 Since the opportunity was changed from SDVOSB set aside to small business set aside, will the VAAR evaluation factors for SDVOSB/VOSBs be included 852.215-70 Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors?

VA Response:Â Â No.

Question 4 The solicitation documentation (SOW, section 3 Task & Requirements, number 12) contains a reference to completing the work in compliance with the Vermont Department of Environmental Conservation, Drinking Water and Ground Water Protection Division VA Hospital Permit to Operate (WSID 12037) dated 6/6/17 . Will you please provide a copy of this document?

VA Response:Â Â Yes. See attachment.

Question 5 For exterior pressure washing, are we required to capture water or allow it to run to the ground as long as we collect paint chips and other debris?

VA Response:Â Â Water is not required to be captured, as long as paint chips and other debris is collected.

Question 6 Are there any as-builts showing details of the tank itself (e.g., detailed schematics for the tank, ladders, walkways, hard points that we can rig from, etc.) If so, will you please provide?

VA Response:Â Â Yes. See attachment.

Question 7 Please confirm the Site Safety and Health Officer (SSHO) may also be the production supervisor.

VA Response:Â Â As long as both roles can be performed fully successfully, they may be managed by a single person.

Question 8 Section 13 90 00 2.01.B. of the spec calls out Tnemec as basis of design and states that product by Jotun and Hempel coatings will also be considered if they meet the performance criteria. Will alternate manufacturers (e.g., Sherwin Williams, PPG, Carboline) be deemed acceptable if they meet the performance criteria?

VA Response:Â Â Yes, alternative manufacturers will be deemed acceptable if they meet performance criteria.

Question 9 Section 13 90 00 3.01.B.1 calls out SSPC SP-11 Power Tool Cleaning to Bare Metal for all repair areas. Please confirm this is only for heavily rusted areas and that areas with sound coating are to be pressure washed in accordance with SSPC WJ-4 Low Pressure Water Cleaning in advance of overcoating.

VA Response:Â Â Correct.

Question 10 No alternate for exterior surface prep and coating including full abrasive blast and recoat found in the specification. Please advise if this alternate price is to be provided.

VA Response:Â Â No alternate line items are proposed.

Question 11 Will owner provide water at no charge for disinfection following coating scope of work?

VA Response:Â Â Yes.

Question 12 Please confirm the third party inspector shall be at a minimum NACE CIP Level 1. (SOW, section 3 Task & Requirements, number 24B).

VA Response:Â Â NACE Level 1 inspector may be used to monitor the painting and cleaning and ensure compliance with the specifications. But the onsite NACE Level 1 inspector must be supported by a NACE Level 3 inspector to assist with technical support and quality control.

Question 13 Are we required to fence the project area?

VA Response:Â Â No, access to natural gas plant needs to remain accessible.

Update #3 ·

1

CONTINUATION PAGE

Update #2 ·

1

NOTICE OF FOR PROPOSAL AMENDMENT

SOLICITATION NUMBER: 36C24123R0112

AMENDMENT NUMBER: 0001

DATE: August 31, 2023

PROJECT NUMBER: 405-23-001

PROJECT TITLE: Water Tank Painting and Repair

LOCATION: VA Medical Center, White River Junction, VT 05009

REASON FOR AMENDMENT: Answer RFI Questions 1 thru 2

__________________________________________________________

AMENDMENT: 0001

Question 1 SOW states Contractor shall provide two temporary water storage tanks, each holding at least 6,000 gallons. Tanks shall be piped together and tied into the water service and distribution lines. The temporary water storage tanks shall be able to hold at least 70 PSI of water pressure

Using tanks that are 6,000 gals and able to handle at least 70 psi of pressure is tall order. Those type of tanks are very expensive at that size. Is it possible to use static tanks with temporary pumps that could be triggered from the BMS?

VA Response:Â Â Yes, that would be fine. The tanks are intended to be used as a temporary tower. The 70 PSI will be maintained with the water pumps in building 2. The VA intends to have the water service flow through the tanks to keep the stored water fresh. The tanks will be wired into the BMS system at the water tower. The BMS is a Siemens Desigo Building Automation system.

Question 2 SOW states Water tanks shall be wired into the Building Management System (BMS) to communicate with the two VFD water tower supply pumps in building 2 to maintain a full condition. The water tanks will serve as a temporary water tower, providing an emergency supply of water to the campus in case of any failure by the municipal water system.

We are not quite clear on what is needed and how to integrate the tanks into the BMS.

What needs to be integrated ? Is it the pressure and / or levels?

VA Response:Â A level indicator needs to be on the tanks to be sure they remain full.

Update #1 ·

405-23-001 | Water Tank Painting and Repair

Files

Show all 20

Notice history

Notice Type Posted
Z1NE--405-23-001 | Water Tank Painting and Repair Award Award Notice
This notice Latest solicitation Solicitation
Z1NE--405-23-001 | Water Tank Painting and Repair Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Z1DA--550-26-121 FY27 NRM Emergent Repairs North Water Tower 71 & South Water Tower 94 CON Danville, Illinois 61832, United States · NAICS 237110 Veterans Integrated Service Network 12 Service-Disabled Veteran-Owned Small Business
Z1DA--542-21-113 | Correct FCA Deficiencies – Repair Water Penetration | NCO 4 Construction East (VA-26-00020634) (VA-26-00020634) Coatesville VA Medical Center 1400 Black Horse Hill Road 19320 · NAICS 238190 Veterans Integrated Service Network 4 Service-Disabled Veteran-Owned Small Business
Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Durham, North Carolina 27705, United States · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Veterans Affiars Medical Center Durham NC 27705 · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
N048-- B41 Isolation Valve Installation Department of Veterans Affairs Veterans Health Administration North Little Rock AR 72114 · NAICS 238220 Veterans Integrated Service Network 16 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors