36C24123R0112 0001.docx
DOCX document 28 KB Posted
- Solicitation number
- 36C24123R0112
About this file
This document is an amendment to a solicitation for water tank painting and repair services at the VA Medical Center in White River Junction, Vermont. The amendment provides answers to two questions from potential offerors. It clarifies that static tanks with temporary pumps could be used instead of tanks holding at least 6,000 gallons able to withstand 70 PSI of pressure. It also explains that a level indicator is needed on the tanks to ensure they remain full and integrate with the Siemens Desigo Building Automation system to communicate tank levels to the two variable frequency drive water tower supply pumps in Building 2. The response date for offers remains unchanged at September 12, 2023 at 1:00 PM Eastern Time. An updated wage determination from August 18, 2023 is also attached.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 405-23-001 Department of Veterans Affairs VAMC Togus
NCO 01
1 VA Center Augusta ME 04330 Department of Veterans Affairs VAMC Togus
NCO 01
1 VA Center Augusta ME 04330 To all Offerors/Bidders
36C24123R0112 08-31-2023
X X X
X
The purpose of this amendment is to:
1) Provide answers to RFI # 1 thru 2
2) Provide updated Wage Determination - VT20230023 - 18 AUG 2023
All other terms and conditions remain unchanged.
Due date for offers remains unchanged at 9/12/2023 @ 13:00 EST.
Diane D. Davis Contracting Officer
NOTICE OF FOR PROPOSAL AMENDMENT
SOLICITATION NUMBER: 36C24123R0112
AMENDMENT NUMBER: 0001
DATE: August 31, 2023
PROJECT NUMBER: 405-23-001
PROJECT TITLE: Water Tank Painting and Repair LOCATION: VA Medical Center, White River Junction, VT 05009 REASON FOR AMENDMENT: Answer RFI Questions 1 thru 2
Question 1 – SOW states “Contractor shall provide two temporary water storage tanks, each holding at least 6,000 gallons. Tanks shall be piped together and tied into the water service and distribution lines. The temporary water storage tanks shall be able to hold at least 70 PSI of water pressure”
· Using tanks that are 6,000 gals and able to handle at least 70 psi of pressure is tall order. Those type of tanks are very expensive at that size. Is it possible to use static tanks with temporary pumps that could be triggered from the BMS?
VA Response: Yes, that would be fine. The tanks are intended to be used as a temporary tower. The 70 PSI will be maintained with the water pumps in building 2. The VA intends to have the water service flow through the tanks to keep the stored water fresh. The tanks will be wired into the BMS system at the water tower. The BMS is a Siemens Desigo Building Automation system.
Question 2 – SOW states ” Water tanks shall be wired into the Building Management System (BMS) to communicate with the two VFD water tower supply pumps in building 2 to maintain a full condition. The water tanks will serve as a temporary water tower, providing an emergency supply of water to the campus in case of any failure by the municipal water system.
· We are not quite clear on what is needed and how to integrate the tanks into the BMS.
· What needs to be “integrated”? Is it the pressure and / or levels?
VA Response: A level indicator needs to be on the tanks to be sure they remain full.
See attached document: Wage Determination - VT20230023 - 18 AUG 2023