EXHIBIT D - Calculation of Self Performed Work.pdf

PDF 211 KB Posted

Attached to
Z1NE--405-23-001 | Water Tank Painting and Repair
Solicitation number
36C24123R0112
Issued by

About this file

This exhibit provides a template for offerors to calculate the percentage of work to be self-performed in response to solicitation number 36C24123R0112 from the Department of Veterans Affairs for water tank painting and repair services at the VA Medical Center in White River Junction, Vermont. Offerors must self-perform a minimum of 25% of the work to be considered for award as a general contractor. The template requires offerors to identify the specific work to be self-performed, provide the total offer price and amount to be self-performed, subtract overhead and profit from the total price to calculate the total work under the contract, and then show the percentage of self-performed work by dividing the self-performed amount by the total contract work.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT D: CALCULATION OF SELF-PERFORMED WORK

SUBMITTED IN RESPONSE TO RFP 36C24123R0112 – Water Tank Painting and Repair

- VA Medical Center White River Junction, VT - Project Number 405-23-001

Use a format similar to the following to identify and calculate cost of the work to be self-performed.

Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.

Explain in detail how you will perform the minimum percentage required (25% GC) with your own resources. Note: An offeror who has the capability to perform both as a general contractor and self-perform a major element of construction, for example, prefabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work: __________________________________

B.1 Total Offer Price: $_________________

B.2 If applying for consideration as a General Contractor (multi-discipline projects) work must be self-performed $_____________

B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc.

B.4 Remainder is “Total amount of work to be performed under the Contract” = $__________________

B.5 “Work to be self-performed”: = $ _________________________________ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”? (Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B.6 Self-performed Work = Line B.5 / B.4 X 100% = ________________________%

File details come from the government source that posted it. Updated .