Z1DA--FY22 Tier 2: NRM (PROJ: 548-22-140) DB Upgrade CLC Hospice Outbuildings Transformer
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 36C24822R0082
- Agency
-
Veterans Integrated Service Network 8
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks design-build services to upgrade electrical infrastructure at a Department of Veterans Affairs medical center. The contractor will replace two transformers feeding multiple buildings, replace associated automatic transfer switches, install a new medium voltage transfer switch, and provide temporary generator power during construction. Proposals will be evaluated using a tradeoff process between technical and price factors. The response deadline is July 8, 2022 and work must be completed within 200 calendar days of notice to proceed.
This opportunity is set aside for verified Service-Disabled Veteran-Owned Small Businesses. The primary NAICS code is 238210 and PSC code R499 covers electrical work. The location for performance of work is the West Palm Beach VA Medical Center. Key details include replacing two transformers, one rated at 750KVA and the other at 225KVA, upgrading switches and adding a new automatic transfer switch to improve reliability of power serving critical buildings on the medical center campus.
Notice text
5 versions
Update #5 · Latest ·
This amendment does the following:
Phase II close date has been extended until August 26th, 2022, at 4:00 PM EST
Answers to RFI are attached
Provide schematics and pictures requested.
Update #4 ·
This amendment does the following:
1. Phase I close date has been extended until July 15, 2022.
2. Attached are the RFI responses.
Update #3 ·
Project Description: This is a 2 face Design Build(DB) The Contractor is to design and Install a new transformer. The new transformer is a 750 KVA, 13200 V to 480Y/277 V, Class OA 60 Hertz, three Phase Distribution Transformer, copper windings and 4 position switch (A, B, Open, Open) in the West Palm Beach VAMC Building No 3
This solicitation will be evaluated on a Trade-Off basis. As stated elsewhere in this solicitation, this procurement is a two (2) Phase Design/Build IAW FAR Part 36.3. One solicitation will be issued covering both phases. In Phase I proposals will be evaluated to determine which offerors will submit proposals in Phase II. Block 13 A refers to Phase I proposals.
Update #2 ·
Solicitation Description Install new building #3 (CLC) transformer. The new CLC transformer is a 750 KVA, 13200 V to 480Y/277 V, Class OA 60 Hertz, Three Phase Distribution Transformer, copper windings, and 4 position switch (A, B, Open, Open). The building #3 (CLC) transformer is located in a fenced area next to building #3 (CLC). See attachment 1 and 2. The transformer feeds the main electrical room 1K-115 located in building #3 (CLC). Additional buildings fed from this electrical room 1K-115 are building #7 (VA Police), building #12 (HR), building #5 (water tower pump house), building #19 (Hospice), and building #4 (Fisher House). The transformer also directly feeds the transformer (13200 B-feed only) for building #16 (Mental Health).
Update #1 ·
Solicitation Description
Install new building #3 (CLC) transformer. The new CLC transformer is a 750 KVA, 13200 V to 480Y/277 V, Class OA 60 Hertz, Three Phase Distribution Transformer, copper windings, and 4 position switch (A, B, Open, Open).
The building #3 (CLC) transformer is located in a fenced area next to building #3 (CLC). See attachment 1 and 2.
The transformer feeds the main electrical room 1K-115 located in building #3 (CLC).
Additional buildings fed from this electrical room 1K-115 are building #7 (VA Police), building #12 (HR), building #5 (water tower pump house), building #19 (Hospice), and building #4 (Fisher House).
The transformer also directly feeds the transformer (13200 B-feed only) for building #16 (Mental Health).
Files
Show all 36
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z1DA--FY22 Tier 2: NRM (PROJ: 548-22-140) DB Upgrade CLC Hospice Outbuildings Transformer | Award Notice | |
| This notice | Solicitation | |
| Z1DA--FY22 Tier 2: NRM (PROJ: 548-22-140) DB Upgrade CLC Hospice Outbuildings Transformer | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z1DA--Project No. 583-22-106- Replace Electrical Panels & Expand Distribution. | Veterans Integrated Service Network 10 | No set-aside | |
| Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 for Philadelphia VAMC | Veterans Integrated Service Network 4 | Service-Disabled Veteran-Owned Small Business | |
| Increase Emergency Power | Veterans Integrated Service Network 1 | Service-Disabled Veteran-Owned Small Business | |
| C222--657A5-24-108, FCA Replace Medium Voltage Feeder 3 and Transformers l MC FY27 NRM VISN Base DE | Veterans Integrated Service Network 15 | Service-Disabled Veteran-Owned Small Business | |
| 540-22-700 | EHRM Infrastructure Upgrades Construction | Clarksburg WV | VA Technology Acquisition Center | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity