Attachment f Project Price Breakdown.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Z1DA--FY22 Tier 2: NRM (PROJ: 548-22-140) DB Upgrade CLC Hospice Outbuildings Transformer
- Solicitation number
- 36C24822R0082
About this file
This document contains a template for a project price breakdown attachment to a federal solicitation. The template requires offerors to provide labor and material costs by construction division for an unspecified VA project. Divisions include general requirements, existing conditions, concrete, masonry, and other typical construction areas. Offerors must also provide overhead, profit, and bond percentages to calculate total base offer cost.
The related federal contract opportunity is a solicitation from the VA for a project at the Z1DA VISN 8 to upgrade the transformer for the community living center and hospice outbuildings at an unspecified location. The project requires installing a new 750 KVA, 13200 V to 480Y/277 V transformer with copper windings and a four position switch in a fenced area next to the community living center. The upgraded transformer will feed the main electrical room and additional buildings on site. The response deadline is not provided.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Attachment F
Project Price Breakdown
| Project Number: | Date: | ||
| Project Title | |||
| Project Location | |||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
Edward L Roy: VA assigned project #
| Edward L Roy: VA assigned Project Title | Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 | |
| Division 3 | Concrete | - 0 | - 0 | - 0 | |
| Division 4 | Masonry | - 0 | - 0 | - 0 | |
| Division 5 | Metals | - 0 | - 0 | - 0 | |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 | |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 | |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 | |
| Division 9 | Finishes | - 0 | - 0 | - 0 | |
| Division 10 | Specialties | - 0 | - 0 | - 0 | |
| Division 11 | Equipment | - 0 | - 0 | - 0 | |
| Division 12 | Furnishings | - 0 | - 0 | - 0 | |
| Division 13 | Special Construction | - 0 | - 0 | - 0 | |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 | |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 | |
| Division 22 | Plumbing | - 0 | - 0 | - 0 | |
| Division 23 | HVAC | - 0 | - 0 | - 0 | |
| Division 26 | Electrical | - 0 | - 0 | - 0 | |
| Division 27 | Communications | - 0 | - 0 | - 0 | |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 | |
| Division 31 | Earthwork | - 0 | - 0 | - 0 | |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 | |
| Division 33 | Utilities | - 0 | - 0 | - 0 | |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 | |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Total Base Offer Cost $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .