Attachment f Project Price Breakdown.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z1DA--FY22 Tier 2: NRM (PROJ: 548-22-140) DB Upgrade CLC Hospice Outbuildings Transformer
Solicitation number
36C24822R0082
Issued by

About this file

This document contains a template for a project price breakdown attachment to a federal solicitation. The template requires offerors to provide labor and material costs by construction division for an unspecified VA project. Divisions include general requirements, existing conditions, concrete, masonry, and other typical construction areas. Offerors must also provide overhead, profit, and bond percentages to calculate total base offer cost.

The related federal contract opportunity is a solicitation from the VA for a project at the Z1DA VISN 8 to upgrade the transformer for the community living center and hospice outbuildings at an unspecified location. The project requires installing a new 750 KVA, 13200 V to 480Y/277 V transformer with copper windings and a four position switch in a fenced area next to the community living center. The upgraded transformer will feed the main electrical room and additional buildings on site. The response deadline is not provided.

View the file

Other files

File Type Posted
Sequence of Operation.pdf PDF
Distribution Drawings.pdf PDF
36C24822R0082 0003.docx DOCX document
Building 3 CLC - 3-P3.pdf PDF
NURSINGHOMEA.doc DOC document
NURSINGHOMEATS131416.doc DOC document
3-W1.jpg JPG image
Schematic Diagram 6336S01.pdf PDF
3-W2.pdf PDF
Building 3 CLC - 3-E2.pdf PDF
548.CS103.16.EI601.pdf PDF
Schematic Diagram F529S01.pdf PDF
Schematic Diagram 6336S01 with notes.pdf PDF
36C24822R0082 0002.docx DOCX document
Site Visit Sign-in Sheet.pdf PDF
36C24822R0082 0001.docx DOCX document
36C24822R0082_2.docx DOCX document
05 VA 01 00 00 GENERAL REQUIREMENTS.docx DOCX document
000110 Master Specification Index.pdf PDF
26 12 19 Pad Mounted Liquid Filled Medium Voltage Transformer.docx DOCX document
Design Manual Index.pdf PDF
attachment E Past Performance Questionnaire.pdf PDF
07 Specification VA 01 32 17 Project Schedules.doc DOC document
09 548-21-102 Contractor Trade.docx DOCX document
fl220WD.docx DOCX document
548-22-140 Location Plan.pdf PDF
Upgrade CLC and Outbuildings - Drawing.pdf PDF
548-22-140 Site Plan.pdf PDF
36C24822R0082_2.docx DOCX document
06 Specification VA 01 42 19 Reference Standards 02.docx DOCX document
08 548-21-102 013323 Shop Drawings Product Data and Samples.docx DOCX document
06 Specification VA 01 42 19 Reference Standards.docx DOCX document
attachment D Experience Information Sheet.pdf PDF
3-E16 Marked Up.pdf PDF
attachment C Contractor Safety and Environmental Record Form 02.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Attachment F

Project Price Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Edward L Roy: VA assigned project #

Edward L Roy: VA assigned Project TitleDivision 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Total Base Offer Cost $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .