Z1DA--528A6-19-605 replace building 76 roofs

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C24224B0028
Agency
Veterans Integrated Service Network 2 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
238160 Roofing Contractors
PSC
Z1DA Maintenance Of Hospitals And Infirmaries
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 2 is seeking construction services to remove the existing natural slate shingles and replace them with an approved synthetic slate product, as well as install a new electrical ice melt system on Building 76, the main hospital building at the Bath VA Medical Center in Bath, New York. Key contract requirements include the removal and disposal of asbestos and lead-containing materials, submission of a safety plan to prevent falling debris, and adherence to the project plans and specifications. The solicitation number is 36C24224B0028, and the bid due date is May 8, 2024.

This is an unrestricted solicitation, not set aside for any specific business category. The existing six-story building was constructed in 1938 and the total roof area is approximately 31,000 square feet. The estimated value of the contract is between $2,000,000 and $5,000,000. The work must be performed at the Bath VA Medical Center located at 76 Veterans Avenue, Bath, New York 14810.

Notice text

3 versions

Update #3 · Latest ·

Page 1 of 3

500 CANAL VIEW BOULEVARD

SUITE 500

ROCHESTER, NY 14623

(585) 448-0686

RFI RESPONSE

COMPANY:

Bath VA Medical Center

PROJECT:

PROJECT NUMBER:

Replace Roof Building 76

528A6-19-605

RE:

RFI responses

RFI No 1

Spec 07 31 26-4 Metal Flashing calls for copper 20 oz in the valleys and 16 oz in other locations. Prints call for stainless steel. Provide copper flashing as specified.

Spec 07 31 26-4 Snow guards. Who is the manufacturer and what style in copper? Snow guards were not specified for this project.

Instead of using felt paper can we install ice and water on the deck instead of felt? It would be more watertight in the end. Yes. Provide ice and water shield membrane directly to roof decking and as detailed on AS-100.

RFI No 2

Section 04 01 00 Maintenance of Masonry describes work involving Repointing existing damaged masonry joints and Replacing existing damaged masonry units. It isn t shown anywhere else in the drawings or specifications the actual scope of this required work. Can you provide clarification to the locations and scope of masonry work required for this project? There are small areas of damaged brick above the roof line at the ends of the ridge.

Under section 02 82 13.19 Asbestos Floor Tile and Mastic Abatement is a full decontamination unit with shower required for this minimal interior abatement? Contractor to develop and implement a written Respiratory Protection Plan in compliance with OSHA requirements.

Under section 02 82 13.19 Asbestos Floor Tile and Mastic Abatement is there any requirement for floor prep or flooring repair after the abatement process? Floor to be left cleaned and ready for new flooring install. Repair any damage created after the abatement process.

Is the VPIH responsible for all flooring and roofing Asbestos abatement visual and air clearance testing or is the contractor responsible for hiring a 3rd party Industrial hygienist for this? VA to provide.

Section 02 82 33.13 mentions lead based paint removal but the drawings and specifications don t offer any clarification on this. Is the contractor responsible for any lead testing or lead paint removal for this project or only the removal of lead lined copper flashing? Lead testing is not required but any paint encountered to be treated as lead paint removal.

Would it be possible to have the scaffolding contractor arrive on site and start setting up scaffolding before full contractor mobilization to ensure work can begin and progress uninhibited after full contractor mobilization? Scaffolding is part of contractor mobilization.

The dormers are mentioned in both the specs and the drawings as possible-lead containing paint, but there seems to be no mention of restoring the dormers themselves other than the re-shingling. The dormers are not to be restored on this contract? Dormers to be painted.

We saw this was asked in the previous RFI but we would request the VA to reconsider allowing weekend work of an exterior project of this magnitude and complexity. Allowing the contractor to work when the weather is favorable increases the likelihood this project will get finished in 2024. Is there any roof for consideration of this request? VA will allow weekend work but must be arranged with the COR/ facility.

Will the VA require the roofing contractor/ installer to be approved certified EcoStar applicator to install the EcoStar Sustainable Roofing System and offer the Gold Star 50-Year Limited Labor and Material Warranty? Yes.

On Page 3 of the drawings for the roofing abatement, all of the Annex shingles contain ACM while on the main building, the ACM is on the ridges, valleys, and flashing but not the entire field tiles, correct? Black asbestos-containing asphalt adhesive is present throughout the entirety of the main roof and annex building roof fields.

Will the new snow melt system need to be integrated into the existing VA BMS? Va to answer. Yes

According to the drawings, we are removing the existing gutter liner. What type of material is the new gutter liner? Copper.

2.6 SNOW GUARDS A. Snow Guards: Individual copper snow guards. Is there a desired pattern the VA wants for this and can provide a spec? No snow guards specified.

Would the VA extend the due date two weeks? VA has extended bid to May 8th, 2024.

RFI No 3

Scaffolding:

It is assumed that scaffolding is safety measure required beneath the roof drip edge of each section being worked on.

Please confirm. Yes this is correct. There will be additional requirements if contractors wish to move from scaffolding to roof.

Scaffolding will need to be erected on top of the flat roof portions of the building up to the roof edge on the north and south side of the main entrance.

Are there any load bearing restrictions that need to be identified?

The flat roof is EPDM. The contractor s intent is to lay down a protective barrier (i.e. ¾ plywood) on the roof surface and erect scaffolding on top on the protective barrier. Is this acceptable? There are load bearing restrictions. Any damage to be prevented and repaired

Is the contractor allowed to use concrete anchors into brick-and-mortar exterior to secure scaffolding to building? Upon completion all exterior surfaces to be like before. SHPO restrictions apply.

Is the contractor allowed to employ the use of a Hydro Scaffolding type system?

This system provides proper safety protection and provides labor crews a more efficient way to transfer tools, equipment, materials, and debris between the ground and the roof. Scaffolding methods are per contractor. Ensure systems meet safety requirements and of commercial quality and availability.

Snow Guards:

Are snow guards getting installed? There are no specifics on this unless I missed it. No snow guards.

The use of Stainless steel:

Plans call for use of stainless steel to be installed for cricket flashing as directed in drawing number AS-100. The cricket flashing will come in to contact with existing copper counter flashing. The two metals when in contact create a chemical reaction. Can we use copper in place of stainless steel for cricket flashing? Drawing specify the use of stainless steel. Use Copper flashing as specified.

Auto Desk Cloud:

A requirement for Auto Desk Cloud was mentioned at the site visit. What exactly is an Auto Desk Cloud and is there alternatives that can satisfy this requirement? Same type of product as Newforma, Procor, and other construction tracking databases. As it is paid for by VA, training is available through VA, it is to be used and no alternatives.

RFI No 4

Please confirm that snow pads are required over the entire roof area in a pattern recommended by the snow pad manufacturer. ? No snow guards on project.

Update #2 ·

RFI SHEET

Solicitation # 36C24223B0019

REPLACE ROOF BUILDING 76 - Bath VA Medical Center

RFI # 1

Question - In the bid documents, it says that the VA will only choose a contractor who is certified for asbestos removal in NY. Will the VA allow us to sub the asbestos removal OR can they change the language so that the contractor has time to get certified before the notice to proceed?

Answer A new specs document has been uploaded that has an amended Section 1.2 - General Intention - A.

RFI # 2

Question Will plywood need to be installed as a substrate over the existing tongue and groove deck?

Answer - Tongue and groove decking is an acceptable substrate and there is no warranty requirement for the installation of plywood over the existing T&G

RFI # 3

Question - Is there current Sheathing on the building?

Answer Yes, the existing sheathing is 1x6 T&G (see attached photo on last page).

Question - Are there security fence areas?

Answer - No

Question - Scaffolding Areas for stair towers

Answer - Limited

Question - Laydown area(s) for dumpsters, forklift, job trailer, material trailer, parking, and additional materials

Answer - The area will away from the immediate construction site. There isn t much room around the main hospital building.

Question - Are there other projects going on at the building and adjacent areas?

Answer - Yes. There will be 3 projects at this building.

Question - Where can we hook up power to the job trailer from the power source?

Answer - There is power available near the designated job trailer site.

Question - Are there roof access areas from inside the building?

Answer Yes, there is an existing roof access hatch located in the elevator penthouse.

Question - Patient and staff access points

Answer All four sides of the building.

Question - Could we have weekend work authorization (bring up weather limitations due to the time of the project)?

Answer - No. Normal work hours only.

Question - Plan for slate removed (VA retains or do we need to dispose of it)

Answer The removed existing slate shall be disposed of by the contractor.

RFI # 4

Is the IMPS and IMPN new panels? Are they provided by us?

Answer NEW, PROVIDED BY CONTRACTOR. SEE RESPONSE IN RFI#5, DRAWINGS AND SPECS FOR ADDITIONAL INFORMATION.

Is the measurements on the heat trace just the roof or is it the length of the heat trace including the zig zag?

Answer LENGTHS INDICATED ARE THE LENGTH OF THE SPECIFICED DESIGN MAKE HEAT TRACE THAT IS ON THE ROOF, FROM THE HOMERUN POWER WIRING JUNTION TO THE END OF THE RUN.

RFI # 5

Contractor is inquiring to get information on the electric panels (IMPS - IMPN) that will be installed on the 7th floor based on the drawing EP-102. Need size of panel, qty of breakers. This is not covered on dwgs or in specs.

Answer

IMPS: 480/277V; 225A MCB; 30 CKT. PROVIDE (12) ACTIVE SINGLE POLE 30A BREAKERS AND (8) SPARE. (10) SPACE.

IMPN: 480/277V; 225A MCB; 30 CKT. PROVIDE (7) ACTIVE SINGLE POLE 30A BREAKERS AND (13) SPARE. (10) SPACE.

There is a discrepancy in the IM control panels. This may vary between vendors but they are saying the IMP requires a single pole 277v-30a breakers - not dbl pole 20a.

Answer ALL BREAKERS SHALL BE SINGLE POLE 30A 277V.

RFI #3 3.) Photo

Update #1 ·

SCOPE OF WORK

Project No. 528A6-19-603

Replace Existing Roof Building 76

Construction Services

Bath VA Medical Center 76 Veterans Avenue Bath, NY 14810

The general scope of this project is for construction services to remove the existing natural

slate shingles and replace with an approved synthetic slate product, install a new electrical

ice melt system as specified and shown on the construction documents for building 76

which is the main hospital building at the VA Medical Center located in Bath, New York.

Work shall address but not limited to existing roof removal, penetrations, flashing, and

structural support of new artificial slate roofing. The building is listed as historical

buildings at the VA Medical Center located in Bath, New York.

EXISTING CONDITIONS

The existing six story structure was constructed in 1938. The existing Building 76 roof is

approximately 31,000 square feet, made up of 4 distinct sections: The North wing, Center

Portion, South Wing, and the Annex Addition. The North and South wings are six stories

with attic space under the wood framed sloped roof. The Center portion is 7 stories with

attic space under the wood framed sloped roof. The Annex addition is a two-story building

also with a wood framed sloped roof. All roof sections have a built-in gutter system lined

with copper sheeting. The existing downspouts are located along the interior face of the

exterior wall chases. All roof slopes are approximately 8:12.

Construction will include, but is not limited to:

Complete removal of existing slate roofing system including

1. all flashing,

2. underlayment, and

3. certain other items.

4. The work involves the removal and disposal of asbestos containing materials and lead

containing materials.

Complete installation of new synthetic slate product including

1. all flashing

2. underlayment

3. certain other items

Safety Measures:

1. Submit safety plan indicating how the contractor intends to prevent falling debris

during demolition and new installation.

Electrical Work:

1. Install power and systems required for the installation and operation of specified ice

melt system.

The Contractor shall supply:

1. All the materials, tools, labor, and supervision to complete this project as required on

the contract drawings and in the specifications.

2. Contractor will adhere strictly to the plans and specifications unless directed

otherwise by the CO in writing.

3. The work will include all trades for general building construction. The trades used

will include but are not limited to:

a. Electrical

b. Mechanical

c. Carpentry

d. Plumbing

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Z1DA--NRM-const 528A6-19-605 replace building 76 roofs Award Award Notice
Z1DA--528A6-19-605 replace building 76 roofs This notice · Latest solicitation Solicitation
Z1DA--528A6-19-605 replace building 76 roofs Original Pre-Solicitation