P01- Drawings - 528A6-19-605 REPLACE ROOF BUILDING 76.pdf
PDF 15 MB Posted
- Attached to
- Z1DA--528A6-19-605 REPLACE BUILDING 76 ROOFS Federal contract opportunity
- Solicitation number
- 36C24224B0028
About this file
This document appears to be a set of drawings related to a solicitation from the Department of Veterans Affairs (VA) for construction services to remove and replace the existing natural slate roof on Building 76 at the Bath, NY VA Medical Center.
The key details are:
- Solicitation Number: 36C24224B0028
- Project Name: Z1DA--528A6-19-605 REPLACE BUILDING 76 ROOFS
- Scope of Work: Remove the existing natural slate roof and replace it with an approved synthetic slate product. Work includes installing a new electrical ice melt system, addressing roof penetrations and flashing, and providing structural support for the new roof. The building is considered a historical site.
- Building Details: Building 76 is the main hospital building, a six-story structure built in 1938, with a total roof area of approximately 31,000 square feet across four distinct roof sections.
- Contractor Requirements: The contractor must provide all materials, labor, and supervision to complete the project in accordance with the plans and specifications, adhering to all applicable trades (electrical, mechanical, carpentry, plumbing).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24224B0028 0003.docx | DOCX document | |
| S04 - PRE BID CONFERENCE ATTENDEES 2 - 36C24223B0019 REPLACE ROOF BUILDING 76.pdf | ||
| S04 - Site Visit Conference Agenda - 36C24224B0028 REPLACE ROOF BUILDING 76.pdf | ||
| 36C24224B0028 0002.docx | DOCX document | |
| 36C24224B0028 0001.docx | DOCX document | |
| S02 - Revised Specs - 528A6-19-605 REPLACE ROOF BUILDING 76.pdf | ||
| 36C24224B0028_1.docx | DOCX document | |
| RFI Sheet - 528A6-19-605 REPLACE ROOF BUILDING 76.pdf | ||
| P01- Specifications - 528A6-19-605 REPLACE ROOF BUILDING 76.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3610 LAWSON ROAD « JAMESTOWN, NY 14701
(716) 484 - 1366 « (716) 484 - 1519 FAX
P TRIOT
DESIGN & CONSULTING
STILL SERVING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Revisions: Date:
NOTE:
USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING
EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD
o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s e f o o t o n e a n d o n e h a l f i n c h e s e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
Bath VAMC
NAME TITLE DATE REVIEWED/APPROVED
DRAWING NO. SHEETSYMBOL TITLE
VAMC-528A6-XXXX
ISSUED FOR BID
AutoCAD SHX Text VAMC-528A6-XXXX GI-001 1 OF 13 COVER SHEET GI-001 1 OF 13 COVER SHEET 1 OF 13 COVER SHEET COVER SHEET VAMC-528A6-XXXX GI-002 2 OF 13 GENERAL NOTES AND ABBREVIATIONS GI-002 2 OF 13 GENERAL NOTES AND ABBREVIATIONS 2 OF 13 GENERAL NOTES AND ABBREVIATIONS GENERAL NOTES AND ABBREVIATIONS VAMC-528A6-XXXX HA-100 3 OF 13 HAZARDOUS MATERIALS REMOVAL PLAN HA-100 3 OF 13 HAZARDOUS MATERIALS REMOVAL PLAN 3 OF 13 HAZARDOUS MATERIALS REMOVAL PLAN HAZARDOUS MATERIALS REMOVAL PLAN VAMC-528A6-XXXX HA-101 4 OF 13 FIRST FLOOR HAZARDOUS MATERIALS REMOVAL PLAN HA-101 4 OF 13 FIRST FLOOR HAZARDOUS MATERIALS REMOVAL PLAN 4 OF 13 FIRST FLOOR HAZARDOUS MATERIALS REMOVAL PLAN FIRST FLOOR HAZARDOUS MATERIALS REMOVAL PLAN VAMC-528A6-XXXX AD-100 5 OF 13 DEMOLITION ROOF PLAN AD-100 5 OF 13 DEMOLITION ROOF PLAN 5 OF 13 DEMOLITION ROOF PLAN DEMOLITION ROOF PLAN VAMC-528A6-XXXX AS-100 6 OF 13 ROOF PLAN AS-100 6 OF 13 ROOF PLAN 6 OF 13 ROOF PLAN ROOF PLAN VAMC-528A6-XXXX EP-100 7 OF 13 ROOF PLAN NORTH ELECTRICAL PLAN EP-100 7 OF 13 ROOF PLAN NORTH ELECTRICAL PLAN 7 OF 13 ROOF PLAN NORTH ELECTRICAL PLAN ROOF PLAN NORTH ELECTRICAL PLAN VAMC-528A6-XXXX EP-101 8 OF 13 ROOF PLAN SOUTH ELECTRICAL PLAN EP-101 8 OF 13 ROOF PLAN SOUTH ELECTRICAL PLAN 8 OF 13 ROOF PLAN SOUTH ELECTRICAL PLAN ROOF PLAN SOUTH ELECTRICAL PLAN VAMC-528A6-XXXX EP-102 9 OF 13 SEVENTH FLOOR ELECTRICAL PLAN AND ONE LINE DIAGRAM EP-102 9 OF 13 SEVENTH FLOOR ELECTRICAL PLAN AND ONE LINE DIAGRAM 9 OF 13 SEVENTH FLOOR ELECTRICAL PLAN AND ONE LINE DIAGRAM SEVENTH FLOOR ELECTRICAL PLAN AND ONE LINE DIAGRAM VAMC-528A6-XXXX EP-103 10 OF 13 PARTIAL GROUND FLOOR ELECTRICAL PLANS EP-103 10 OF 13 PARTIAL GROUND FLOOR ELECTRICAL PLANS 10 OF 13 PARTIAL GROUND FLOOR ELECTRICAL PLANS PARTIAL GROUND FLOOR ELECTRICAL PLANS VAMC-528A6-XXXX EP-104 11 OF 13 FIRST FLOOR NORTH ELECTRICAL PLAN EP-104 11 OF 13 FIRST FLOOR NORTH ELECTRICAL PLAN 11 OF 13 FIRST FLOOR NORTH ELECTRICAL PLAN FIRST FLOOR NORTH ELECTRICAL PLAN VAMC-528A6-XXXX EP-105 12 OF 13 ICE MELT CONTROL SYSTEM AND ONE LINE DIAGRAM EP-105 12 OF 13 ICE MELT CONTROL SYSTEM AND ONE LINE DIAGRAM 12 OF 13 ICE MELT CONTROL SYSTEM AND ONE LINE DIAGRAM ICE MELT CONTROL SYSTEM AND ONE LINE DIAGRAM VAMC-528A6-XXXX EP-106 13 OF 13 MISCELLANEOUS ELECTRICAL DETAILSEP-106 13 OF 13 MISCELLANEOUS ELECTRICAL DETAILS13 OF 13 MISCELLANEOUS ELECTRICAL DETAILSMISCELLANEOUS ELECTRICAL DETAILS
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS PROJECT NO. 528A6-19-605 BATH, NY
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
SITE PLAN
AutoCAD SHX Text
GI-001
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text Office of
AutoCAD SHX Text Construction
AutoCAD SHX Text and Facilities
AutoCAD SHX Text Management
AutoCAD SHX Text
ARCHITECT/ENGINEER OF RECORD
AutoCAD SHX Text
STAMP
AutoCAD SHX Text
CONSULTANT
AutoCAD SHX Text
REPLACE ROOF BUILDING 76
AutoCAD SHX Text Bath, NY
AutoCAD SHX Text 528A6-19-605
AutoCAD SHX Text
AutoCAD SHX Text
LLJ
AutoCAD SHX Text
EHA/WTO
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
SITE LOCATION
AutoCAD SHX Text
AutoCAD SHX Text
FIREPLACE
AutoCAD SHX Text
COHOCTON RIVER
AutoCAD SHX Text
AVENUE A
AutoCAD SHX Text
AutoCAD SHX Text
VETERANS AVENUE
AutoCAD SHX Text
SHED
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHED
AutoCAD SHX Text
GARDEN PLOT
AutoCAD SHX Text
AutoCAD SHX Text
FIRE PIT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHED
AutoCAD SHX Text
EMPTY TRANSFORMER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BLOCK BUILDING
AutoCAD SHX Text
DUGOUT
AutoCAD SHX Text
AutoCAD SHX Text
SAN JUAN AVENUE
AutoCAD SHX Text
GETTYSBURG AVENUE
AutoCAD SHX Text
RIVER ROAD
AutoCAD SHX Text
GETTYSBURG AVENUE
AutoCAD SHX Text
LAUNDRY SERVICE ROAD
AutoCAD SHX Text
AutoCAD SHX Text
ARGONNE AVENUE
AutoCAD SHX Text
CONCRETE WALL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 29A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COHOCTON RIVER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DUGOUT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BELFAST STREET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NATIONAL CEMETERY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
31 BOILER PLANT
AutoCAD SHX Text
30 SECTION 6 - ADMINISTRATION BUILDING
AutoCAD SHX Text
18 VOLUNTEER SERVICES
AutoCAD SHX Text
114 GAUGE HOUSE
AutoCAD SHX Text
113 METER HOUSE
AutoCAD SHX Text
7 INTERN HOUSING
AutoCAD SHX Text
4 LUMBER SHED
AutoCAD SHX Text
103 SUPPLY WAREHOUSE
AutoCAD SHX Text
97 BLEACHERS - NORTH
AutoCAD SHX Text
94 PARADE GROUND - FLAG POLE
AutoCAD SHX Text
106 CANTEEN PATIO
AutoCAD SHX Text
104 SECTION 1 - DOMICILIARY
AutoCAD SHX Text
112 GAZEBO
AutoCAD SHX Text
98 COVERED PICNIC AREA
AutoCAD SHX Text
96 BLEACHERS - EAST
AutoCAD SHX Text
95 CEMETERY FLAG POLE
AutoCAD SHX Text
108 HEAVY EQUIPMENT STORAGE
AutoCAD SHX Text
44 STATION POLICE
AutoCAD SHX Text
1301 NATIONAL CEMETERY SERVICE
AutoCAD SHX Text
84 COMPENSATED WORK THERAPY
AutoCAD SHX Text
75 ENGINEERING SHOPS: HVAC, PAINT, ELECT., PLUMBING
AutoCAD SHX Text
41 FISCAL, CONTRACTING
AutoCAD SHX Text
32 RESEARCH PSYCHOLOGY, SOCIAL WORK
AutoCAD SHX Text
24 MAIN DINING ROOM, KITCHEN
AutoCAD SHX Text
15 GARAGES, MASONRY STORAGE
AutoCAD SHX Text
76 HOSPITAL
AutoCAD SHX Text
56 QUARTERS
AutoCAD SHX Text
57 THREE CAR GARAGE
AutoCAD SHX Text
53 THREE CAR GARAGE
AutoCAD SHX Text
55 QUARTERS
AutoCAD SHX Text
54 QUARTERS
AutoCAD SHX Text
51 QUARTERS
AutoCAD SHX Text
52 QUARTERS
AutoCAD SHX Text
50 QUARTERS
AutoCAD SHX Text
42 HONOR GUARD
AutoCAD SHX Text
35 SECTION 3 - PERSONNEL, CANTEEN
AutoCAD SHX Text
39 MAIN CHAPEL
AutoCAD SHX Text
38 NY STATE VETERANS REPRESENTATIVE
AutoCAD SHX Text
78 SECTION 2 - COMMUNITY LIVING CENTER (CLC)
AutoCAD SHX Text
79 BRIDGE
AutoCAD SHX Text
93 FIELD HOUSE
AutoCAD SHX Text
92 RECREATION & EMPLOYEE EDUCATION
AutoCAD SHX Text
81 UNDERGROUND RESERVOIR
AutoCAD SHX Text
16 CARPENTER SHOP
AutoCAD SHX Text
17 LAUNDRY, PRINTING SHOP
AutoCAD SHX Text
14 FIRE DEPARTMENT, GARAGE
AutoCAD SHX Text
10 DAY TREATMENT (PRRC)
AutoCAD SHX Text
9 VACANT
AutoCAD SHX Text
34 SECTION 4 - DOMICILIARY
AutoCAD SHX Text
20 SEWER PUMP HOUSE
AutoCAD SHX Text
33 SECTION 5 - INFORMATION TECHNOLOGY (IT)
AutoCAD SHX Text
29A MUSEUM, UPHOLSTERY, EMS, ENGINEERING
AutoCAD SHX Text
6 ENGINEERING STORAGE
AutoCAD SHX Text
3 EQUIPMENT STORAGE
AutoCAD SHX Text
115 GREENHOUSE
AutoCAD SHX Text
119 SMOKE SHELTER (ANNEX)
AutoCAD SHX Text
121 SMOKE SHELTER (B35)
AutoCAD SHX Text
116 IMPOUND YARD
AutoCAD SHX Text
120 SMOKE SHELTER (B24)
AutoCAD SHX Text
122 SMOKE SHELTER (B92)
AutoCAD SHX Text
APPROVALS
AutoCAD SHX Text
%%ULIST OF DRAWINGS:
AutoCAD SHX Text
REPLACE ROOF BUILDING 76
AutoCAD SHX Text 02/07/2022
P TRIOT
DESIGN & CONSULTING
STILL SERVING
ISSUED FOR BID
AutoCAD SHX Text %%uGENERAL NOTES:%%U
AutoCAD SHX Text %%uGENERAL NOTES CONTINUED:%%U
AutoCAD SHX Text
1. THE NOTES ON THIS SHEET ARE APPLICABLE TO THE ENTIRE SET OF DRAWINGS AND THE NOTES ON THIS SHEET ARE APPLICABLE TO THE ENTIRE SET OF DRAWINGS AND ARE NOT SHOWN ON EACH INDIVIDUAL SHEET. THE CONTRACTOR IS RESPONSIBLE FOR APPLYING THESE NOTES THROUGHOUT THE ENTIRE PROJECT. 2. IN THE EVENT THAT THE CONTRACTOR DISCOVERS A DISCREPANCY ON THE IN THE EVENT THAT THE CONTRACTOR DISCOVERS A DISCREPANCY ON THE CONSTRUCTION PLANS OR A POTENTIAL UTILITY CONFLICT, HE SHALL CONTACT THE COR IMMEDIATELY FOR CLARIFICATION, PRIOR TO PROCEEDING WITH CONSTRUCTION OF THE PORTION IN QUESTION. 3. THE CONTRACTOR SHALL PROVIDE AT HIS EXPENSE, ALL AUTOMOBILE AND PEDESTRIAN THE CONTRACTOR SHALL PROVIDE AT HIS EXPENSE, ALL AUTOMOBILE AND PEDESTRIAN TRAFFIC CONTROL DEVICES REQUIRED BY FEDERAL, STATE, COUNTY, CITY, OR LOCAL AGENCIES. THE AMOUNT, LOCATION, AND SIZE SHALL BE AS REQUIRED BY AGENCY. 4. CONTRACTOR SHALL CONDUCT A "WALK THROUGH" MEETING WITH COR WHEN THE CONTRACTOR SHALL CONDUCT A "WALK THROUGH" MEETING WITH COR WHEN THE CONTRACTOR BELIEVES THE FINAL RESTORATION IS COMPLETE TO ENSURE THE RESTORATION MEETS THE REASONABLE EXPECTATIONS OF BATH VAMC. 5. CONDUCT REMOVAL OPERATIONS TO PREVENT INJURY TO PEOPLE AND DAMAGE TO CONDUCT REMOVAL OPERATIONS TO PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT SURFACES AND AREAS. 6. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MAINTAINING A SECURE AND THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MAINTAINING A SECURE AND SAFE SITE DURING THE ENTIRE PROJECT. 7. RESTORE ALL DISTURBED AREAS TO EQUAL OR BETTER THAN PRE-PROJECT RESTORE ALL DISTURBED AREAS TO EQUAL OR BETTER THAN PRE-PROJECT CONDITION. 8. ALL INSPECTIONS/SITE ASSESSMENTS MUST BE PERFORMED BY A QUALIFIED ALL INSPECTIONS/SITE ASSESSMENTS MUST BE PERFORMED BY A QUALIFIED PROFESSIONAL. 9. DISTURBED AREA SHALL BE MINIMIZED TO THE EXTENT POSSIBLE. DISTURBED AREA SHALL BE MINIMIZED TO THE EXTENT POSSIBLE. 10. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO PROTECT EXISTING FEATURES. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO PROTECT EXISTING FEATURES. DAMAGED FEATURES SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 11. ANY CHANGES OR SUBSTITUTIONS MUST RECEIVE PRIOR APPROVAL FROM THE ANY CHANGES OR SUBSTITUTIONS MUST RECEIVE PRIOR APPROVAL FROM THE CONTRACT OFFICER. 12. THE CONTRACTOR AND SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR THE CONTRACTOR AND SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL FEDERAL, STATE, AND LOCAL SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS AT ALL TIMES FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. THE CONTRACTOR SHALL COMPLY WITH THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 DURING THE CONDUCT AND PERFORMANCE ON AND IN CONNECTION WITH THIS PROJECT. IT IS ALSO THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INITIATE, MAINTAIN, AND SUPERVISE ALL SAFETY REQUIREMENTS, PRECAUTIONS, AND PROGRAMS IN CONNECTION WITH THE WORK. 13. CONTRACTOR SHALL BE RESPONSIBLE FOR EXERCISING REASONABLE CARE IN CONTRACTOR SHALL BE RESPONSIBLE FOR EXERCISING REASONABLE CARE IN OPERATING EQUIPMENT IN THE VICINITY OF UTILITIES, WHETHER OVERHEAD, AT GROUND LEVEL, OR BURIED, AND SHALL SAVE AND HOLD HARMLESS TOLMAN ENGINEERING, ARCHITECTURE & SURVEYING, PLLC, THE OWNER AND ANY OF THEIR DESIGNATED AGENTS FROM AND AGAINST ANY AND ALL CLAIMS AND DAMAGES OF ANY KIND OF INJURY TO, OR DEATH TO, ANY PERSON OR PERSONS AND FROM DAMAGE TO OR LOSS OF PROPERTY, ARISING OUT OF, OR ATTRIBUTED TO THE NEGLIGENCE OF CONTRACTOR'S OPERATIONS. 14. THE CONTRACTOR SHALL BE THOROUGHLY FAMILIAR WITH THE REGULATIONS OF THE THE CONTRACTOR SHALL BE THOROUGHLY FAMILIAR WITH THE REGULATIONS OF THE U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), THE U.S. DEPARTMENT OF TRANSPORTATION (DOT), THE U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA), AND SIMILAR STATE AND OTHER AGENCIES HAVINGJURISDICTION OVER THE WORK BEING PERFORMED. 15. THE CONTRACTOR SHALL PROVIDE NECESSARY HEALTH AND SAFETY TRAINING FOR ALL THE CONTRACTOR SHALL PROVIDE NECESSARY HEALTH AND SAFETY TRAINING FOR ALL OF THE CONTRACTOR'S ON-SITE PERSONNEL. 16. CONTRACTOR WARRANTS WHEN REQUIRED BY A PROJECT THAT ALL ITS EMPLOYEES CONTRACTOR WARRANTS WHEN REQUIRED BY A PROJECT THAT ALL ITS EMPLOYEES PERFORMING WORK ON SAID PROJECT ARE PERMITTED TO ENGAGE IN HAZARDOUS WASTE OPERATIONS THAT COULD EXPOSE THEM TO HAZARDOUS SUBSTANCES, SAFETY, OR HEALTH HAZARDS, AND SHALL PROVIDE EVIDENCE PRIOR TO COMMENCING WORK THAT ALL WORKERS HAVE OBTAINED THE NECESSARY HEALTH AND SAFETY TRAINING AND MEDICAL SURVEILLANCE AS REQUIRED BY OSHA 1910.120. 17. SURFACE DEBRIS SHALL BE PICKED UP AND DISPOSED OF PRIOR TO DEMOBILIZATION. SURFACE DEBRIS SHALL BE PICKED UP AND DISPOSED OF PRIOR TO DEMOBILIZATION. ALSO, ALL ASPHALT SURFACES SHALL BE BROOM CLEANED. 18. ALL REQUIREMENTS DESCRIBED WITHIN THE GENERAL NOTES SECTION AND CONTRACT ALL REQUIREMENTS DESCRIBED WITHIN THE GENERAL NOTES SECTION AND CONTRACT DOCUMENTS, UNLESS OTHERWISE INDICATED, SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT WITH NO ASSOCIATED PAY ITEM AND NO ADDITIONAL COMPENSATION TO BE AWARDED TO THE CONTRACTOR. 19. THESE PLANS HAVE BEEN PREPARED USING THE MOST ACCURATE INFORMATION AND THESE PLANS HAVE BEEN PREPARED USING THE MOST ACCURATE INFORMATION AND DATA AVAILABLE AT THE TIME OF PREPARATION. FIELD CONDITIONS MAY BE ENCOUNTERED DURING CONSTRUCTION WHICH VARIES FROM THOSE DEPICTED HEREIN. AS SUCH, THESE PLANS SHOULD BE USED AS A CONSTRUCTION CONTROL REFERENCE, NOT A PRECISE CONSTRUCTION DOCUMENT. MODIFICATIONS TO THE IMPROVEMENTS AS SHOWN MAY BE REQUIRED BASED ON FIELD CONDITIONS AT THE TIME OF CONSTRUCTION. 20. THE TRACKING OR SPILLAGE OF MUD, DIRT, OR DEBRIS UPON STATE, COUNTY, TOWN, THE TRACKING OR SPILLAGE OF MUD, DIRT, OR DEBRIS UPON STATE, COUNTY, TOWN, COUNTY, TOWN, CITY OR VAMC ROADWAYS IS PROHIBITED, AND ANY SUCH OCCURRENCE SHALL BE CLEANED UP IMMEDIATELY BY THE CONTRACTOR. 21. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MAINTAINING A SECURE AND THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MAINTAINING A SECURE AND SAFE SITE DURING THE ENTIRE PROJECT. DURING NON-WORK HOURS, BARRICADES AND GATES SUPPLIED BY THE CONTRACTOR SHALL BE SET OR LOCKED TO PROTECT TRESPASSERS AND TO SECURE THE WORK ZONE. THE CONTRACTOR SHALL PROVIDE PROPER BARRICADES FOR ANY EXCAVATION OR HAZARDOUS AREA. 22. THE CONTRACTOR WILL BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, THE CONTRACTOR WILL BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, PROCEDURES, AND/OR TECHNIQUES. 23. THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ALL NECESSARY PERMITS ASSOCIATED WITH THE WORK AS DESCRIBED WITHIN THE PROJECT SPECIFICATIONS AND DRAWINGS. 24. ANY MODIFICATION TO THE SPECIFICATIONS OR CHANGES TO THE WORK AS SHOWN ANY MODIFICATION TO THE SPECIFICATIONS OR CHANGES TO THE WORK AS SHOWN ON THE DRAWINGS MUST HAVE PRIOR WRITTEN APPROVAL BY THE CONTRACT OFFICER. 25. BEFORE BIDDING PROJECT, CONTRACTOR SHALL VERIFY ALL SITE FEATURES. BEFORE BIDDING PROJECT, CONTRACTOR SHALL VERIFY ALL SITE FEATURES. CONTRACTOR IS RESPONSIBLE FOR RESTORING ALL SITE FEATURES DISTURBED BY PROJECT.
AutoCAD SHX Text
26. PROVIDE AND MAINTAIN A SAFE WORK AREA IN ACCORDANCE WITH OSHA GUIDELINES. PROVIDE AND MAINTAIN A SAFE WORK AREA IN ACCORDANCE WITH OSHA GUIDELINES. 27. DUST CONTROL SHALL BE INTEGRATED THROUGHOUT THE PROJECT. DUST CONTROL SHALL BE INTEGRATED THROUGHOUT THE PROJECT. 28. RECYCLING AND SALVAGING SHALL BE COMPLETED FOR PROJECT, REFER TO RECYCLING AND SALVAGING SHALL BE COMPLETED FOR PROJECT, REFER TO SPECIFICATIONS FOR REQUIREMENTS. CONSTRUCTION WASTE MANAGEMENT PLAN SHALL BE SUBMITTED AND APPROVED IN ACCORDANCE WITH THE SPECIFICATIONS. 29. REMOVE AND LEGALLY DISPOSE OF ALL MATERIALS AND ITEMS NOTED FOR REMOVE AND LEGALLY DISPOSE OF ALL MATERIALS AND ITEMS NOTED FOR DEMOLITION OR REMOVAL AS PART OF PROJECT WORK. UNLESS OTHER WISE INDICATED, MATERIALS AND ITEMS REMOVED SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL PERMITS, RULES AND/OR REGULATIONS. 30. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 31. THE CONTRACTOR SHALL HAVE AN ACCIDENT PREVENTION PLAN (APP) AND THE CONTRACTOR SHALL HAVE AN ACCIDENT PREVENTION PLAN (APP) AND PREPARE ACTIVITY HAZARD ANALYSIS (AHAS) SPECIFIC TO THE PROJECT. APP AND AHAS SHALL BE SUBMITTED TO VA FOR REVIEW AND APPROVAL. REFER TO SPECIFICATION 01 35 20 (SAFETY REQUIREMENTS) FOR ADDITIONAL INFORMATION. 32. THE CONTRACTOR SHALL AT ALL TIMES MEET ALL SAFETY REQUIREMENTS SET FORTH THE CONTRACTOR SHALL AT ALL TIMES MEET ALL SAFETY REQUIREMENTS SET FORTH IN THEIR ACCIDENT PREVENTION PLAN (APP) FOR THE SITE. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONDITIONS AT THE SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY WHILE PERFORMING THE WORK. THIS REQUIREMENT WILL THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL COMPLY WITH THE CONSTRUCTION SAFETY COMMISSION "GENERAL SAFETY RULES AND REGULATIONS FOR THE CONSTRUCTION INDUSTRY", 29 CFR 1926 AND SAFETY RULES. THE CONTRACTOR SHALL REQUIRE ALL PERSONNEL TO WEAR APPROPRIATE PROTECTIVE CLOTHING, HARD HATS, ETC., AS REQUIRED BY LAW. 33. IN ACCORDANCE WITH GENERALLY ACCEPTED PRACTICES, THE CONTRACTOR SHALL BE IN ACCORDANCE WITH GENERALLY ACCEPTED PRACTICES, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATTERS RELATING TO THE HEALTH AND SAFETY OF ITS PERSONNEL AND EQUIPMENT AND THE PUBLIC IN PERFORMANCE OF THE WORK. THIS INCLUDES RECOGNITION OF THE POTENTIAL HEALTH AND SAFETY HAZARDS ASSOCIATED WITH THE WORK AND INCLUDES COMPLIANCE WITH THE MINIMUM REQUIREMENTS OF THE HEALTH AND SAFETY PLAN IN FORCE FOR THE WORK, IF APPLICABLE. IT IS UNDERSTOOD THAT PROTECTIVE MEASURES SPECIFIED IN ANY HEALTH AND SAFETY PLAN ARE MINIMUM REQUIREMENTS FOR THE WORK. 34. PROVIDE DESIRED CONSTRUCTION STAGING AREA SIZE TO VAMC AND COORDINATE WITH PROVIDE DESIRED CONSTRUCTION STAGING AREA SIZE TO VAMC AND COORDINATE WITH COR TO DETERMINE FINAL LOCATION. CONSTRUCTION STAGING AREA SHALL BE SURROUNDED WITH TEMPORARY CHAIN LINK FENCE. 35. ALL CRANES, LIFTS OR OTHER EQUIPMENT THAT WILL BE OPERATING IN THE VICINITY ALL CRANES, LIFTS OR OTHER EQUIPMENT THAT WILL BE OPERATING IN THE VICINITY OF POWER TRANSMISSION FACILITIES SHALL BE ELECTRICALLY GROUNDED. 36. CONSTRUCTION MATERIALS, EQUIPMENT, ETC., SHALL NOT BE LEFT ON THE CONSTRUCTION MATERIALS, EQUIPMENT, ETC., SHALL NOT BE LEFT ON THE SHOULDERS OR PAVEMENT AFTER WORKING HOURS, NOR AT ANY TIME BE PLACED IN A MANNER OR LOCATION THAT WILL OBSTRUCT HIGHWAY SAFETY, OR THE CLEAR SIGHT DISTANCE AT INTERSECTIONS, INCLUDING DRIVEWAY ENTRANCES, WITHOUT PROPER TRAFFIC CONTROL DEVICES AND MEASURES. 37. CONDUCT REMOVAL OPERATIONS TO PREVENT INJURY TO PEOPLE AND DAMAGE TO CONDUCT REMOVAL OPERATIONS TO PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT SURFACES AND AREAS. 38. PROMPTLY DISPOSE OF DEMOLISHED MATERIALS. DO NOT ALLOW DEMOLISHED PROMPTLY DISPOSE OF DEMOLISHED MATERIALS. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON SITE. 39. WOOD AND OTHER WASTE SHALL NOT BE BURNED AT THE SITE, BUT SHALL BE WOOD AND OTHER WASTE SHALL NOT BE BURNED AT THE SITE, BUT SHALL BE REMOVED WITH OTHER DEBRIS. 40. THE CONTRACTOR SHALL BE THOROUGHLY FAMILIAR WITH SECTION 111, CHAPTER 4: THE CONTRACTOR SHALL BE THOROUGHLY FAMILIAR WITH SECTION 111, CHAPTER 4: "HEAT STRESS" OF THE OSHA TECHNICAL MANUAL AND SHALL BE RESPONSIBLE FOR A HEAT STRESS PROGRAM TO BE IMPLEMENTED BY THE CONTRACTOR AND SUB-CONTRACTORS WHILE PERFORMING DUTIES. 41. WHERE A CONFLICT MAY EXIST BETWEEN THE SPECIFICATIONS, DRAWINGS AND ACTUAL WHERE A CONFLICT MAY EXIST BETWEEN THE SPECIFICATIONS, DRAWINGS AND ACTUAL EXISTING CONDITIONS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO SEEK CLARIFICATION FROM THE COR. WHERE A CONFLICT MAY EXIST BETWEEN THE SPECIFICATIONS, DRAWINGS, LAWS OR REGULATIONS, THE MORE STRINGENT REQUIREMENTS APPLY. 42. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED LAYOUTS TO COMPLETE THIS THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED LAYOUTS TO COMPLETE THIS PROJECT. 43. ALL DIMENSIONS ARE APPROXIMATE AND MUST BE VERIFIED BY THE CONTRACTOR AT ALL DIMENSIONS ARE APPROXIMATE AND MUST BE VERIFIED BY THE CONTRACTOR AT THE SITE BEFORE STARTING WORK. NOTIFY COR OF ANY DISCREPANCIES. 44. REMOVE ONLY AS MUCH ROOFING IN ONE DAY AS CAN BE MADE WEATHERTIGHT IN REMOVE ONLY AS MUCH ROOFING IN ONE DAY AS CAN BE MADE WEATHERTIGHT IN THE SAME DAY. 45. WEATHER LIMITATIONS: PROCEED WITH REROOFING PREPARATIONS ONLY DURING DRY WEATHER LIMITATIONS: PROCEED WITH REROOFING PREPARATIONS ONLY DURING DRY WEATHER CONDITIONS AS SPECIFIED FOR NEW ROOFING INSTALLATION IN SECTION 073200 COMPOSITE ROOF TILE SYSTEMS. 46. REMOVE AND REPLACE ROOFING SYSTEM IN PHASES. CONTRACTOR SHALL SUBMIT REMOVE AND REPLACE ROOFING SYSTEM IN PHASES. CONTRACTOR SHALL SUBMIT PHASING PLAN TO COR FOR APPROVAL AND COORDINATION PRIOR TO COMMENCING ANY WORK. ALL WORK ON THIS PROJECT MUST BE COORDINATED WITH WORK BEING PERFORMED BY OTHER CONTRACTORS UNDER OTHER PROJECTS BEING PERFORMED SIMULTANEOUSLY. COORDINATE WITH COR. 47. ALL CONTRACTORS ARE RESPONSIBLE FOR MAKING THEMSELVES AND THEIR ALL CONTRACTORS ARE RESPONSIBLE FOR MAKING THEMSELVES AND THEIR EMPLOYEES AWARE OF THE PRESENCE, LOCATION, AND QUANTITY OF EXISTING ASBESTOS-CONTAINING BUILDING MATERIALS, AND TO WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF EXPOSURE TO ASBESTOS. ANY DISTURBANCE OF ASBESTOS-CONTAINING MATERIALS SHALL BE PERFORMED BY A LICENSED ASBESTOS ABATEMENT CONTRACTOR EMPLOYING CERTIFIED WORKERS. 48. THE CONTRACTOR IS ADVISED THAT THE WORK OF THE CONTRACT MAY IMPOSE THE CONTRACTOR IS ADVISED THAT THE WORK OF THE CONTRACT MAY IMPOSE CERTAIN OBLIGATIONS AND REQUIREMENTS MANDATED BY THE US DEPARTMENT OF LABOR OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION REGULATIONS, TITLE 29 CFR 1926.62 LEAD EXPOSURE IN CONSTRUCTION, RELATIVE TO THE POTENTIAL EXPOSURE TO LEAD BY ITS EMPLOYEES. THE CONTRACTOR ASSUMES ENTIRE RESPONSIBILITY AND LIABILITY FOR COMPLYING FULLY IN ALL RESPECTS WITH THESE REGULATIONS. ADDITIONALLY, IF THE SCOPE OF WORK REQUIRES THE CONTRACTOR TO SCRAPE LOOSE PAINT, OR GENERATES OTHER LEAD WASTE, THEN THE WASTE GENERATED SHALL TO BE ANALYZED FOR APPROPRIATE WASTE DISPOSAL REQUIREMENTS AS PER US EPA RCRA REGULATIONS.
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text A/C UNIT AIR CONDITIONING UNIT AIR CONDITIONING UNIT A/E ARCHITECT/ENGINEER ARCHITECT/ENGINEER AAMA AMERICAN ARCHITECTURAL AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION AC ASBESTOS CEMENT OR ASPHALTIC ASBESTOS CEMENT OR ASPHALTIC CONCRETE ADMIN ADMINISTRATION ADMINISTRATION AFF ABOVE FINISHED FLOOR ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE ABOVE FINISHED GRADE AFS ABOVE FINISHED SLAB ABOVE FINISHED SLAB AGC ASSOCIATED GENERAL CONTRACTORS ASSOCIATED GENERAL CONTRACTORS AHU AIR HANDLING UNIT AIR HANDLING UNIT AIA AMERICAN INSTITUTE OF ARCHITECTS AMERICAN INSTITUTE OF ARCHITECTS AISC AMERICAN INSTITUTE OF STEEL AMERICAN INSTITUTE OF STEEL CONSTRUCTION ALT ALTERNATE ALTERNATE ALT NO ALTERNATE NUMBER ALTERNATE NUMBER ALUM ALUMINUM ALUMINUM AMT AMOUNT AMOUNT ANSI AMERICAN NATIONAL STANDARDS AMERICAN NATIONAL STANDARDS INSTITUTE APA AMERICAN PLYWOOD ASSOCIATION AMERICAN PLYWOOD ASSOCIATION APPD APPROVED APPROVED APPROX APPROXIMATE APPROXIMATE AR AS REQUIRED AS REQUIRED ARCH ARCHITECT ARCHITECT ASB ASBESTOS ASBESTOS ASI ARCHITECT'S SUPPLEMENTAL ARCHITECT'S SUPPLEMENTAL INSTRUCTION ASPH ASPHALT ASPHALT ASSN ASSOCIATION ASSOCIATION ASTM AMERICAN SOCIETY FOR TESTING AMERICAN SOCIETY FOR TESTING AND MATERIALS ATCH ATTACHMENT ATTACHMENT AVE AVENUE AVENUE B PL BASE PLATE BASE PLATE BALC BALCONY BALCONY BAT BATTEN BATTEN BD BOARD BOARD BD FT BOARD FEET (FOOT) BOARD FEET (FOOT) BKG BACKING BACKING BLDG BUILDING BUILDING BM BEAM BEAM BOT BOTTOM BOTTOM BRCG BRACING BRACING BRDG BRIDGING BRIDGING BRDG JST BRIDGING JOIST BRIDGING JOIST BRG BEARING BEARING BRG PL BEARING PLATE BEARING PLATE BRKT BRACKET BRACKET BTWN BETWEEN BETWEEN BUR BUILT-UP ROOFING BUILT-UP ROOFING C/C CENTER TO CENTER CENTER TO CENTER CL CENTER LINE CENTER LINE CLR CLEAR CLEAR CM CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT CMU CONCRETE MASONRY UNIT CONCRETE MASONRY UNIT CNR CORNER CORNER COL COLUMN COLUMN CONC CONCRETE CONCRETE COND CONDITION CONDITION CONSTR CONSTRUCTION CONSTRUCTION CONT CONTINUE CONTINUE CONTR CONTRACTOR CONTRACTOR COORD COORDINATE COORDINATE CORR CORRIDOR CORRIDOR CPM CRITICAL PATH METHOD CRITICAL PATH METHOD CSI CONSTRUCTION SPECIFICATIONS CONSTRUCTION SPECIFICATIONS INSTITUTE
AutoCAD SHX Text DEMO DEMOLITION DEMOLITION DEPT DEPARTMENT DEPARTMENT DET DETAIL DETAIL DIA DIAMETER DIAMETER DIFF DIFFERENCE OR DIFFUSER DIFFERENCE OR DIFFUSER DIM DIMENSION DIMENSION DIR DIRECTION DIRECTION DIST DISTANCE DISTANCE DIV DIVIDE OR DIVISION DIVIDE OR DIVISION DL DEAD LOAD DEAD LOAD DOC DOCUMENT DOCUMENT DS DOWNSPOUT DOWNSPOUT DSGN DESIGN DESIGN DWG DRAWING DRAWING E EAST EAST EA EACH EACH EFF EFFICIENCY EFFICIENCY EL ELEVATION ELEVATION EMER EMERGENCY EMERGENCY ENCL ENCLOSURE ENCLOSURE ENGR ENGINEER ENGINEER EQ EQUAL EQUAL EQL SP EQUALLY SPACED EQUALLY SPACED EQUIP EQUIPMENT EQUIPMENT EQUIV EQUIVALENT EQUIVALENT ERD EXISTING ROOF DRAIN EXISTING ROOF DRAIN ETC AND SO FORTH OR ET CETERA AND SO FORTH OR ET CETERA EW EACH WAY EACH WAY EXIST EXISTING EXISTING EXP EXPANSION OR EXPOSED EXPANSION OR EXPOSED EXT EXTERIOR, EXTERNAL, OR EXTERIOR, EXTERNAL, OR EXTINGUISHER FAS FASCIA FASCIA FF FINISH FACE FINISH FACE FIN FINISH FINISH FLASH FLASHING FLASHING FLR FLOOR FLOOR FO FINISHED OPENING FINISHED OPENING FOF FACE OF FINISH FACE OF FINISH FOM FACE OF MASONRY FACE OF MASONRY FOW FACE OF WALL FACE OF WALL FP FIRE PROTECTION OR FIREPROOF FIRE PROTECTION OR FIREPROOF FT FEET OR FOOT FEET OR FOOT FURG FURRING FURRING GC GENERAL CONTRACTOR GENERAL CONTRACTOR GUT GUTTER GUTTER HAZ MAT HAZARDOUS MATERIALS HAZARDOUS MATERIALS HOSP HOSPITAL HOSPITAL HSKPG HOUSEKEEPING HOUSEKEEPING HT HEIGHT HEIGHT HVAC HEATING, VENTILATING, AND AIR HEATING, VENTILATING, AND AIR CONDITIONING IBC INTERNATIONAL BUILDING CODE INTERNATIONAL BUILDING CODE ID IDENTIFICATION, INSIDE DIAMETER, OR IDENTIFICATION, INSIDE DIAMETER, OR INTERIOR DESIGN ID NO IDENTIFICATION NUMBER IDENTIFICATION NUMBER INCL INCLUDED INCLUDED INSUL INSULATION INSULATION INT INTERIOR INTERIOR LAD LADDER LADDER LD BRG LOAD-BEARING LOAD-BEARING LDR LEADER LEADER LF LINEAR FEET (FOOT)LINEAR FEET (FOOT)
AutoCAD SHX Text MAINT MAINTENANCE MAINTENANCE MAN MANUAL MANUAL MATL MATERIAL MATERIAL MAX MAXIMUM MAXIMUM MEMB MEMBRANE MEMBRANE MISC MISCELLANEOUS MISCELLANEOUS MTL METAL METAL MWP MEMBRANE WATERPROOFING MEMBRANE WATERPROOFING N NORTH NORTH NA NOT APPLICABLE NOT APPLICABLE NIC NOT IN CONTRACT NOT IN CONTRACT NO NUMBER NUMBER NOM NOMINAL NOMINAL OC ON CENTER ON CENTER OCC OCCUPY OCCUPY OH OVERHANG OVERHANG OPNG OPENING OPENING OPP OPPOSITE OPPOSITE OSHA OCCUPATIONAL SAFETY AND HEALTH OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PAR PARALLEL OR PARAPET PARALLEL OR PARAPET PART PARTIAL PARTIAL PAT PATTERN PATTERN PERF PERFORATED PERFORATED QA QUALITY ASSURANCE QUALITY ASSURANCE QC QUALITY CONTROL QUALITY CONTROL QTR QUARTER QUARTER QTY QUANTITY QUANTITY QUAL QUALITY QUALITY R RADIUS OR RISER RADIUS OR RISER REINF REINFORCE REINFORCE REP REPAIR REPAIR REPL REPLACE REPLACE REQ REQUIRE REQUIRE REQD REQUIRED REQUIRED REV REVISION REVISION RFG ROOFING ROOFING RFI REQUEST FOR INFORMATION REQUEST FOR INFORMATION RM ROOM ROOM RO ROUGH OPENING ROUGH OPENING RT RIGHT RIGHT RV ROOF VENT ROOF VENT SCHED SCHEDULE SCHEDULE SCHEM SCHEMATIC SCHEMATIC SEL SELECT SELECT SEP SEPARATE SEPARATE SF SQUARE FOOT (FEET) SQUARE FOOT (FEET) SIM SIMILAR SIMILAR SLNT SEALANT SEALANT SPEC SPECIFICATION SPECIFICATION SS STAINLESS STEEL STAINLESS STEEL STD STANDARD STANDARD T TREAD TREAD T&G TONGUE AND GROOVE TONGUE AND GROOVE T&M TIME AND MATERIALS TIME AND MATERIALS TECH TECHNICAL TECHNICAL TEL TELEPHONE TELEPHONE TEMP TEMPERATURE OR TEMPORARY TEMPERATURE OR TEMPORARY THK THICKNESS THICKNESS THRES THRESHOLD THRESHOLD THRU THROUGH THROUGH TYP TYPICAL TYPICAL VAR VARIES VARIES VERT VERTICAL VERTICAL VIF VERIFY IN FIELD VERIFY IN FIELD VTR VENT THROUGH ROOF VENT THROUGH ROOF
AutoCAD SHX Text
GENERAL NOTES AND ABBREVIATIONS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Eng. Project Supervisor Date:Date:
AutoCAD SHX Text Project Title
AutoCAD SHX Text Building No.
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
BATH, NEW YORK
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text
REPLACE ROOF BUILDING 76
AutoCAD SHX Text 02/08/2022
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 528A6-19-605
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
LLJ
AutoCAD SHX Text
EHA
AutoCAD SHX Text
AutoCAD SHX Text Approved: Medical Center Director Date:Date:
AutoCAD SHX Text
VAMC-528A6-XXXX
GI-002
P TRIOT
DESIGN & CONSULTING
STILL SERVING
ISSUED FOR BID
GENERAL NOTES
A. PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS.
B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL IS IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE BULK SAMPLES OF SUSPECT MATERIALS
WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.
C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL (ACM), OR SUSPECT ACM, SHALL BE PERFORMED BY A
NEW YORK STATE LICENSED ASBESTOS ABATEMENT CONTRACTOR.
D. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL
ORIENTATION ONLY. REFER TO SPECIFICATION 028213.21 FOR ESTIMATED QUANTITIES.
E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/OWNER'S REPRESENTATIVE.
F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO PERFORM WORK. THE OWNER OR THEIR
REPRESENTATIVE WILL NOT BE RESPONSIBLE FOR LOST, DAMAGED, OR STOLEN ITEMS.
G. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND TO PREVENT UNAUTHORIZED ACCESS DURING THE DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
H. ALL REMOVED ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR TO BEING REMOVED FROM THE WORK AREA(S). WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE CONTAINERS AS APPROPRIATE. ALL ASBESTOS-CONTAINING MATERIALS/ASBESTOS-CONTAMINATED WASTE REMOVED FROM THE WORK AREA(S) SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE OWNER WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.
I. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE ACCEPTABLE TO THE OWNER, AND THAT REMOVALS ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES.
LEAD AWARENESS NOTES
1. THE CONTRACTOR IS ADVISED THAT THE WORK OF THE CONTRACT MAY IMPOSE CERTAIN OBLIGATIONS AND REQUIREMENTS MANDATED BY THE US DEPARTMENT OF LABOR OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION REGULATIONS, TITLE 29 CFR 1926.62 LEAD EXPOSURE IN CONSTRUCTION, RELATIVE TO THE POTENTIAL EXPOSURE TO LEAD BY ITS EMPLOYEES. THE CONTRACTOR ASSUMES ENTIRE RESPONSIBILITY AND LIABILITY FOR COMPLYING FULLY IN ALL RESPECTS WITH THESE REGULATIONS. ADDITIONALLY, IF THE SCOPE OF WORK REQUIRES THE CONTRACTOR TO SCRAPE LOOSE PAINT, OR GENERATES OTHER LEAD WASTE, THEN THE WASTE GENERATED SHALL BE ANALYZED FOR
APPROPRIATE WASTE DISPOSAL REQUIREMENTS AS PER US EPA RCRA REGULATIONS.
2. TESTING FOR THE PRESENCE OF LEAD-BASED PAINT/COATINGS HAS NOT BEEN PERFORMED ON REPRESENTATIVE BUILDING COMPONENTS. THE FOLLOWING SURFACES/COMPONENTS HAVE BEEN ASSUMED TO BE COVERED WITH
LEAD-BASED PAINT/COATINGS ARE:
· LEAD-COPPER FLASHING, CRICKETS, METAL GUTTER AND METAL GUTTER LINER
· PAINTED DORMER COMPONENTS
· PAINTED FASCIA BOARDS
· PLUMBING VENT PIPE COVERINGS
3. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE
DISTURBANCE OF LEAD.
VA ARCHITECTURAL ABBREVIATIONS
LL FLASH - LEAD-LINED COPPER
AC - ASBESTOS CEMENT
ASPH - ASPHALT TAR
RV - ROOF VENT
SLNT - SEALANT
NIC - NOT IN CONTRACT
LEAD REMOVAL NOTES
LL FLASH LEAD-LINED COPPER IS ASSUMED PRESENT ON FLASHING, CRICKETS, METAL GUTTER AND METAL GUTTER LINERS. CLEANABLE ITEMS MUST FIRST BE INSPECTED BY THE ON-SITE PROJECT MONITOR FOR CLEANLINESS PRIOR TO RECYCLING. DEBRIS GENERATED FROM THESE WORK ACTIVITIES SHALL BE CONTAINERIZED AND DISPOSED BASED UPON TCLP ANALYSIS. EXISTING THRU-WALL FLASHING DOWNSPOUTS AND LEADERS TO
REMAIN.
ASBESTOS ABATEMENT NOTES
AC REMOVE ASBESTOS-CONTAINING CEMENT, ALL LAYERS, FROM ROOF VENTS AND ROOF PEAK AND DISPOSE OF
CEMENTS AS AN ACM.
SLNT REMOVE ASBESTOS-CONTAINING ROOF SEALANT ABOVE ANNEX BUILDING STEP FLASHING ALL LAYERS FULL
DEPTH. REMOVE AND DISPOSE ROOF SEALANTS AS AN ACM.
ASPH REMOVE SLATE SHINGLES WITH BLACK ASBESTOS-CONTAINING ASPHALT ADHESIVE (TAR) AND DISPOSE AS AN ACM. ASSUME ADHESIVE IS PRESENT THROUGHOUT THE ENTIRETY OF THE MAIN ROOF AND ANNEX BUILDING ROOF FIELDS. REMAINING ROOF COVERING ASSEMBLY TO BE REMOVED TO EXISTING WOOD DECK. COORDINATE
ROOF ITEMS TO REMAIN WITH ARCHITECTURAL DRAWINGS.
FLG NOT USED.
95 Perry Street , Suite 300 Buffalo, New York 14203 p: 716.206.5100 f: 716.206.5199
BUILDING 76 HAZARDOUS MATERIALS ROOF PLAN
SCALE: 1/16" = 1'-0"
ASPH
ASPH
ASPH
SLNT
DECONTAMINATION UNIT STAGED IN ATTIC
(ACCESS ROOF THROUGH ELEVATOR
MACHINE ROOM)
ACCESS TO WATER HOOKUP TBD
AC (AT ROOF PEAK)
RVRVAC AC
ASBESTOS-CONTAINING CEMENT ON ROOF VENT ANNEX BLDG ASBESTOS-CONTAINING SEALANT ON ANNEX BUILDING FLASHING
BUILDING 76 LEAD-LINED METAL GUTTER AND FLASHING - TYPICAL
BUILDING 76 ASBESTOS-CONTAINING CEMENT AT ROOF PEAK UNDER NON-ACM CAULK
AC
AC
THRU-WALL COUNTER
FLASHING TO REMAIN
AC
(AT ROOF PEAK)
SLNT
HA-100
HA-100
LL FLASH
NIC
NIC
NIC
NIC
NIC
NIC
NIC NIC
NIC NIC
LL FLASHLL FLASH
NIC
NIC
NIC
HA-100 2
HA-100
ANNEX BUILDING
ASPH
AC
AC
SLNT
3 13
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Eng. Project Supervisor Date:Date:
AutoCAD SHX Text Project Title
AutoCAD SHX Text Building No.
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
BATH, NEW YORK
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text
REPLACE ROOF BUILDING 76
AutoCAD SHX Text 01/18/2022
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 528A6-19-605
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
AutoCAD SHX Text Approved: Medical Center Director Date:Date:
AutoCAD SHX Text
VAMC-528A6-XXXX
AutoCAD SHX Text
HAZARDOUS MATERIALS
AutoCAD SHX Text
REMOVAL PLAN
AutoCAD SHX Text
HA-100
AutoCAD SHX Text 02/08/2022
AutoCAD SHX Text
GB
NAK
P TRIOT
DESIGN & CONSULTING
STILL SERVING
ISSUED FOR BID
GENERAL NOTES
A. PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL RULES, REGULATIONS, GUIDELINES, AND THE CONTRACT DOCUMENTS.
B. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL IS IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT AND/OR ANALYZE BULK SAMPLES OF SUSPECT MATERIALS
WITHOUT THE APPROVAL OF THE OWNER OR THEIR REPRESENTATIVE.
C. THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL (ACM), OR SUSPECT ACM, SHALL BE PERFORMED BY A
NEW YORK STATE LICENSED ASBESTOS ABATEMENT CONTRACTOR.
D. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL
ORIENTATION ONLY. REFER TO SPECIFICATION 028213.21 FOR ESTIMATED QUANTITIES.
E. THE LOCATION OF SITE STORAGE OF MATERIAL, EQUIPMENT, WASTE TRAILER/DUMPSTER(S), AS WELL AS CONTRACTOR PARKING, ETC. SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER/OWNER'S REPRESENTATIVE.
F. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT, AND SUPPLIES. CONTRACTOR IS ALSO RESPONSIBLE FOR PROVIDING LADDERS, SCAFFOLDING, LIFTS, PLANKING, ETC. AS REQUIRED TO PERFORM WORK. THE OWNER OR THEIR
REPRESENTATIVE WILL NOT BE RESPONSIBLE FOR LOST, DAMAGED, OR STOLEN ITEMS.
G. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION, PROVIDING TEMPORARY PROTECTION, PROTECTING BUILDING MATERIALS SCHEDULED TO REMAIN, AND TO PREVENT UNAUTHORIZED ACCESS DURING THE DURATION OF THE PROJECT. REPAIR OF DAMAGE CAUSED AS A RESULT OF INADEQUATE TEMPORARY PROTECTION OR CONTRACTOR ACTIVITIES WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
H. ALL REMOVED ASBESTOS-CONTAINING MATERIALS AND ASBESTOS-CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR TO BEING REMOVED FROM THE WORK AREA(S). WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE CONTAINERS AS APPROPRIATE. ALL ASBESTOS-CONTAINING MATERIALS/ASBESTOS-CONTAMINATED WASTE REMOVED FROM THE WORK AREA(S) SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORD. COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE OWNER AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE OWNER WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.
I. COORDINATE ALL WORK ACTIVITIES WITH THE OWNER/OWNER'S REPRESENTATIVE TO ENSURE ONSITE ACTIVITIES ARE ACCEPTABLE TO THE OWNER, AND THAT REMOVALS ARE SUFFICIENT TO ACCOMMODATE THE PROJECT ACTIVITIES.
LEAD AWARENESS NOTES
1. THE CONTRACTOR IS ADVISED THAT THE WORK OF THE CONTRACT MAY IMPOSE CERTAIN OBLIGATIONS AND REQUIREMENTS MANDATED BY THE US DEPARTMENT OF LABOR OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION REGULATIONS, TITLE 29 CFR 1926.62 LEAD EXPOSURE IN CONSTRUCTION, RELATIVE TO THE POTENTIAL EXPOSURE TO LEAD BY ITS EMPLOYEES. THE CONTRACTOR ASSUMES ENTIRE RESPONSIBILITY AND LIABILITY FOR COMPLYING FULLY IN ALL RESPECTS WITH THESE REGULATIONS. ADDITIONALLY, IF THE SCOPE OF WORK REQUIRES THE CONTRACTOR TO SCRAPE LOOSE PAINT, OR GENERATES OTHER LEAD WASTE, THEN THE WASTE GENERATED SHALL BE ANALYZED FOR
APPROPRIATE WASTE DISPOSAL REQUIREMENTS AS PER US EPA RCRA REGULATIONS.
2. TESTING FOR THE PRESENCE OF LEAD-BASED PAINT/COATINGS HAS NOT BEEN PERFORMED ON REPRESENTATIVE BUILDING COMPONENTS. THE FOLLOWING SURFACES/COMPONENTS HAVE BEEN ASSUMED TO BE COVERED WITH
LEAD-BASED PAINT/COATINGS ARE:
· LEAD-COPPER FLASHING, CRICKETS, METAL GUTTER AND METAL GUTTER LINER
· PAINTED DORMER COMPONENTS
· PAINTED FASCIA BOARDS
· PLUMBING VENT PIPE COVERINGS
3. REFER TO DRAWINGS OF THE SPECIFIC TRADES FOR LOCATIONS WHERE WORK OF THE CONTRACT WILL NECESSITATE
DISTURBANCE OF LEAD.
VA ARCHITECTURAL ABBREVIATIONS
LL FLASH - LEAD-LINED COPPER
AC - ASBESTOS CEMENT
ASPH - ASPHALT TAR
RV - ROOF VENT
SLNT - SEALANT
FLG - FLOORING
NIC - NOT IN CONTRACT
LEAD REMOVAL NOTES
LL FLASH LEAD-LINED COPPER IS ASSUMED PRESENT ON FLASHING, CRICKETS, METAL GUTTER AND METAL GUTTER LINERS. CLEANABLE ITEMS MUST FIRST BE INSPECTED BY THE ON-SITE PROJECT MONITOR FOR CLEANLINESS PRIOR TO RECYCLING. DEBRIS GENERATED FROM THESE WORK ACTIVITIES SHALL BE CONTAINERIZED AND DISPOSED BASED UPON TCLP ANALYSIS. EXISTING THRU-WALL FLASHING DOWNSPOUTS AND LEADERS TO
REMAIN.
ASBESTOS ABATEMENT NOTES
AC NOT USED.
SLNT NOT USED.
ASPH NOT USED.
FLG CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF 6 SF(1 SF PER AREA) OF ASBESTOS-CONTAINING FLOOR TILE AND ASSOCIATED MASTIC WITHIN THE AREAS INDICATED AS REQUIRED FOR NEW CONDUIT PENETRATIONS. IF FLOORING AND MASTIC EXTENDS BENEATH A FIXED OBJECT TO REMAIN, LEAVE A STRAIGHT EDGE AT THE PERIMETER OF THE OBJECT. REMOVE ALL FLOORING MATERIALS DOWN TO AND FROM SUBSTRATE INCLUDING ALL FLOOR LEVELERS/ FILLERS. COORDINATE SPECIFIC REMOVAL LOCATIONS WITH ELECTRICAL CONTRACTOR.
95 Perry Street , Suite 300 Buffalo, New York 14203 p: 716.206.5100 f: 716.206.5199
FIRST FLOOR HAZARDOUS MATERIALS PLAN
SCALE: 1/8" = 1'-0"
TYPICAL CLOSET HAZARDOUS
MATERIALS PLAN
SCALE: 1/4" = 1'-0"
FLG
FLG
FIRST FLOOR ROOM 151B
SECOND FLOOR ROOM 227A
THIRD FLOOR ROOM 322
FOURTH FLOOR ROOM 436
FIFTH FLOOR ROOM 531
SIXTH FLOOR ROOM 615A
4 13
AutoCAD SHX Text H.A.C.
AutoCAD SHX Text
PREPACKING
AutoCAD SHX Text
AREA
AutoCAD SHX Text 160K
AutoCAD SHX Text 160C
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
MEDICATION
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
EXAM ROOM
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
AREA
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
COUNSELING
AutoCAD SHX Text 155A
AutoCAD SHX Text 151C
AutoCAD SHX Text 151B
AutoCAD SHX Text
TEL.
AutoCAD SHX Text 155B
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
EDUCATION
AutoCAD SHX Text
1HA8-76
AutoCAD SHX Text
AutoCAD SHX Text
WAITING ROOM
AutoCAD SHX Text
1HA7-76
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
UP
AutoCAD SHX Text
SWC1-76
AutoCAD SHX Text
COMPUTER ROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXAM ROOM
AutoCAD SHX Text
AutoCAD SHX Text H.A.C.
AutoCAD SHX Text
PRESCRIPTION
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text 160J
AutoCAD SHX Text
DRUG VAULT
AutoCAD SHX Text
FILL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 160D
AutoCAD SHX Text 160A
AutoCAD SHX Text
AutoCAD SHX Text 161A
AutoCAD SHX Text
ALCOVE
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
AGENT CASHIER
AutoCAD SHX Text
PROCUREMENT
AutoCAD SHX Text
FILLING
AutoCAD SHX Text 160F
AutoCAD SHX Text
UNIT DOSE
AutoCAD SHX Text
UNIT DOSE
AutoCAD SHX Text 160G
AutoCAD SHX Text
I.V. ROOM
AutoCAD SHX Text 160H
AutoCAD SHX Text
STOCK
AutoCAD SHX Text 160I
AutoCAD SHX Text
SWEX1-76
AutoCAD SHX Text
AutoCAD SHX Text
241 SF
AutoCAD SHX Text
LABORATORY
AutoCAD SHX Text
PROSTHETICS
AutoCAD SHX Text
UP
AutoCAD SHX Text
HYGIENE
AutoCAD SHX Text
115 SF
AutoCAD SHX Text
109 SF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
1HA12-76
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SWNE1-76
AutoCAD SHX Text
VAULT
AutoCAD SHX Text 160E
AutoCAD SHX Text
1HA10-76
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ELECT.
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AREA
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
AutoCAD SHX Text D.F.
AutoCAD SHX Text
AutoCAD SHX Text
MALE
AutoCAD SHX Text
FEMALE
AutoCAD SHX Text
DENTAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PHARM SECRETARY
AutoCAD SHX Text
AutoCAD SHX Text
PHARMACY
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
DENTAL MGR
AutoCAD SHX Text
1HA9-76
AutoCAD SHX Text
NO. 4
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
125 SF
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text #3
AutoCAD SHX Text
1HA11-76
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
SWN1-76
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text
136 SF
AutoCAD SHX Text #2
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text #1
AutoCAD SHX Text
AutoCAD SHX Text
132 SF
AutoCAD SHX Text
INSTRUMENT
AutoCAD SHX Text
PREP.
AutoCAD SHX Text
AutoCAD SHX Text
220 SF
AutoCAD SHX Text
123 SF
AutoCAD SHX Text
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
108 SF
AutoCAD SHX Text
137 SF
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
DATA
AutoCAD SHX Text
AutoCAD SHX Text
122 SF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
29 SF
AutoCAD SHX Text
292 SF
AutoCAD SHX Text
100 SF
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
DENTAL
AutoCAD SHX Text
AutoCAD SHX Text
121 SF
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
160 SF
AutoCAD SHX Text
145 SF
AutoCAD SHX Text
ADMINISTRATIVE
AutoCAD SHX Text
DENTAL
AutoCAD SHX Text
135 SF
AutoCAD SHX Text
AutoCAD SHX Text
67 SF
AutoCAD SHX Text
PROCELAIN
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
ADMIN/MEETING
AutoCAD SHX Text
AREA
AutoCAD SHX Text 160B
AutoCAD SHX Text
O TANK
AutoCAD SHX Text
AutoCAD SHX Text
TREATMENT
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
AutoCAD SHX Text
DENTAL
AutoCAD SHX Text
STORAGE/GROUP
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
AutoCAD SHX Text
DENTAL
AutoCAD SHX Text
ASST. WORK
AutoCAD SHX Text
AREA
AutoCAD SHX Text 176A
AutoCAD SHX Text
DENTAL
AutoCAD SHX Text
X-RAY ROOM
AutoCAD SHX Text
AutoCAD SHX Text
RESTOOM
AutoCAD SHX Text
1HA13-76
AutoCAD SHX Text
CHIEF OF
AutoCAD SHX Text 151C
AutoCAD SHX Text 151B
AutoCAD SHX Text
TEL.
AutoCAD SHX Text 151C
AutoCAD SHX Text 151B
AutoCAD SHX Text
TEL.
AutoCAD SHX Text D.F.
AutoCAD SHX Text
292 SF
AutoCAD SHX Text 151C
AutoCAD SHX Text 151B
AutoCAD SHX Text
TEL.
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Eng. Project Supervisor Date:Date:
AutoCAD SHX Text Project Title
AutoCAD SHX Text Building No.
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Project No.
AutoCAD SHX Text Date
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
BATH, NEW YORK
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text
REPLACE ROOF BUILDING 76
AutoCAD SHX Text 01/18/2022
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 528A6-19-605
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
AutoCAD SHX Text Approved: Medical Center Director Date:Date:
AutoCAD SHX Text
VAMC-528A6-XXXX
AutoCAD SHX Text
FIRST FLOOR HAZARDOUS MATERIALS
AutoCAD SHX Text
REMOVAL PLAN
AutoCAD SHX Text
HA-101
AutoCAD SHX Text 02/08/2022
AutoCAD SHX Text
GB
NAK
P TRIOT
DESIGN & CONSULTING
STILL SERVING
ISSUED FOR BID
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .