Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs National Cemetery Administration is soliciting proposals to provide construction services for the expansion of the In-Ground Cremation Section 1GJ at the Jefferson Barracks National Cemetery in St. Louis, Missouri under solicitation number 36C78624B0008. The contractor will be responsible for all management, supervision, labor, materials and equipment necessary to complete the expansion, including general construction, burial areas, structures, roads, walks, grading, drainage, landscaping, irrigation and utility systems. Proposals are due by February 29, 2024 and the period of performance is one hundred eighty-one calendar days from notice to proceed.
The solicitation is not set aside and has an estimated value between $500,000 and $1,000,000. Work will include site preparation, land development, gravesite layout and numbering, and other general construction activities. The place of performance is the Jefferson Barracks National Cemetery in St. Louis, Missouri. Offerors must attend a mandatory pre-bid site visit by February 9, 2024 and submit proposals electronically by the due date. Contractors will be evaluated based on technical qualifications, past performance, and price.
Notice text
2 versions
Update #2 · Latest ·
CONTINUATION PAGE
AMENDMENT 0001
Solicitation Number: 36C78624B0008
Project Description: 852-MM22-009, In-Ground Cremation (IGC) Section 1GJ Expansion,
Jefferson Barracks National Cemetery
The following Request for Information (RFI) questions have been submitted to the Contracting Officer regarding this solicitation. The questions and responses represent all questions submitted to the Contracting Officer prior to the deadline established in the Solicitation. The following questions and responses are provided for bidder s information and use.
RFI 1. Confirm that the 26 oak tree is the only tree requiring removal from the work area and all other trees that are evident in aerial photographs (including on Sheet GI001) have been previously removed.
Response: Yes, confirming that there is only one (1) tree that needs to be removed.
RFI 2. Is tree protection (6-foot fence) required on adjacent trees immediately outside of the construction limits?
It wasn t clear which trees needed protection based off the drawings.
Response: Tree protection is required to trees as identified on plan sheet CD101.
RFI 3. The VA Master Specifications lists a tall fescue blend as the sod and seed type with an asterisk to match existing used on cemetery project site.
Is that tall fescue blend listed in the manual still the preferred sod/seed for that area of Jefferson Barracks National Cemetery?
Response: Yes, correct the tall fescue blend listed in the manual is the preferred product for the area.
RFI 4. Is there an excavated fill pile on site for use by the Contractor to use as suitable backfill if there is not enough suitable fill taken from the site during initial excavation?
If not, is there a soil/fill specification or preferred vendor in the area that the cemetery approves?
Response: No, there is no excavated fill pile on site for use by the Contractor; and No, the Cemetery does not any preferred or approved vendors in the area. Specification 31 20 11 has been revised to provide additional information on requirements for Fills. See 2.1.A for additional information.
RFI 5. Is there a required method for screening and approving excavated soil before backfilling the site to finished grade?
Response: Screening shall comply with specification section 31 20 11 requirements. Approval of excavated soil utilized for backfill shall meet the requirements identified in 31 20 11, 2.1.A and will require approval from the COR prior to placement.
RFI 6. During the site visit, it appeared that the grade and contours more closely matched the desired finished grade in the plans than those of the topo map that showed existing conditions.
Was the grading done before or after the survey of that site?
Who completed the survey?
Response: Site was recently stripped, grubbed, and rough graded. Topo map does not reflect new site conditions.
RFI 7. Specifications - Table of Contents refers to Appendix A Geotechnical Report and Appendix B MU Existing Soils Report. Can these reports be provided?
Response: Appendix A Geotechnical Report and Appendix B MU Existing Soils Report attached.
RFI 8. Is it intended for the awarded contractor to purchase and import fill and topsoil for the job; or should we plan to use only what is onsite?
Response: The Government owned material (fill and topsoil) is not and cannot be used, bidders are required to incorporate the cost of purchasing such material in the bid cost.
RFI 9. Is there an Onsite Dumpsite available for exported soils?
Can surplus excavated soils be disposed of at onsite dump area(s) or will this material be required to be hauled off site?
If material is to be disposed of on-site, please provide location of disposal.
Response: No, there is no Onsite Dumpsite for Contractor s use.
No, surplus excavated soils cannot be disposed of onsite, spoils/trash will be required to be hauled and disposed of off-site as specified in the solicitation.
RFI 10. Drawing Number CS501 Detail 3 (Gravesite Monument Marker): Note #2 indicates Concrete to Extend Below Frost Depth and the depth from ground surface to the compacted gravel base is indicated to be 4 0 (4 feet); however, the concrete monument call-out indicates the concrete is to be 1 6 long. Please clarify the length of the concrete monument.
Response: Concrete to extend 4 -0 (4 feet).
RFI 11. Drawing Number CS501 Detail 3 (Gravesite Monument Marker): Do the Bronze Domed-Top Monument Markers need to identify the grid numbers (i.e., 101 through 125)? Are there any other requirements for marking of the grid numbers?
Response: Bronze Domed-Top Monument Markers do not need to identify the grid numbers; they will need to include text engraving National Cemetery Gravesite Grid Monument per detail 3/CD501 and include a 1 dia. Circle centered in the monument and a field stamped cross hairs for alignment as noted in the detail.
SPECIFICATION CHANGES:
31 20 11 Earth Moving (SF): Update definition and requirements for Fills. See 2.1.A.
DRAWING CHANGES:
CS-501 SITE DETAILS 1: Updated detail 3/CS-501 Gravesite Monument Marker
REPORTS:
GEOTECHNICAL REPORT: Appendix A Geotechnical Report attached.
EXISTING SOILS REPORT: Appendix B MU Existing Soils Report attached.
END OF AMENDMENT 0001
Update #1 ·
The Contractor will provide all Management, Supervision, Labor, Material, Parts, and Equipment necessary to construct the In-Ground Cremation (IGC) Section 1GJ Expansion. Contract work includes but is not limited to General Conditions, General Construction, Burial Areas, Structures, Alterations, Roads, Walks, Grading, Drainage, Landscaping, Irrigation, Structural, Architectural, Electrical, Utility systems, Necessary removal of existing structures and Construction and certain of other items and all other work necessary to construct the improvements as shown and described in the contract documents, Statement of Work, Specifications and Drawing.
The Contractor will have one hundred eighty-one (181) calendar days from the date of the Notice to Proceed (NTP) to complete the work.
All work/services performed must adhere to National Cemetery Administration standards and is to be in accordance with the Scope of Work, Specifications, Drawings, and Terms and Conditions described and attached herein.
Files
| File | Type | Posted |
|---|---|---|
| 17312_Addendum-1_COMBINED.pdf | ||
| 36C78624B0008 0001.docx | DOCX document | |
| Specifications.pdf | ||
| Plans.pdf | ||
| 36C78624B0008.docx | DOCX document | |
| DOL Wage Determination - St Louis County.pdf | ||
| 8 - Cost Estimate Worksheet.xlsx | XLSX spreadsheet |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Y1PZ--852-MM22-009: In-Ground Cremation (IGC) Section 1 GJ Expansion, Jefferson Barracks National Cemetery | Award Notice | |
| This notice | Solicitation | |
| Y1PZ--852-MM22-009: IGC Section 1 GJ, Jefferson Barracks National Cemetery St. Louis, Missouri | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Veterans Affairs St. Louis Health Care System (VASTLHCS) John Cochran (JC) Hospital in St. Louis, Missouri | ENDIST Kansas City | No set-aside | |
| Y1JZ--926CM3010 Cemetery Expansion and FCA Improvements Project Washington Crossing National Cemetery | National Cemetery Administration | Service-Disabled Veteran-Owned Small Business | |
| JELA 325250 335621 - Rehabilitate Cemetery | — | Total Small Business | |
| 8730--Sources Sought JBNC Seed (September Delivery) | National Cemetery Administration | No set-aside | |
| Z2DA--657-26-102JC FCA Replace Various Roofs on BLDG 1, JC | Veterans Integrated Service Network 15 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity