8 - Cost Estimate Worksheet.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Y1PZ--852-MM22-009: IGC Section 1 GJ, Jefferson Barracks National Cemetery St. Louis, Missouri
- Solicitation number
- 36C78624B0008
About this file
This document is a cost estimate worksheet for a federal solicitation to expand an in-ground cremation section at Jefferson Barracks National Cemetery in St. Louis, Missouri. The solicitation number is 36C78624B0008 and is being conducted by the Department of Veterans Affairs National Cemetery Administration. The cost estimate worksheet requires lump sum pricing for various construction divisions involved in the project, including general conditions, site work, concrete, masonry, metals, and other divisions. Offerors should complete and submit the worksheet to detail their total base construction cost as well as any applicable insurance, bonding, overhead, and profit amounts to derive their grand total price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78624B0008 0001.docx | DOCX document | |
| 17312_Addendum-1_COMBINED.pdf | ||
| 36C78624B0008.docx | DOCX document | |
| DOL Wage Determination - St Louis County.pdf | ||
| Specifications.pdf | ||
| Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number. |
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
| Offeror shall use and edit to fit Task Order Project | |
| Project Number: | 852-MM22-009 |
| Solicitation Number: | 36C78624B0008 |
| Project Title: | In-Ground Cremation (IGC) Section 1GJ Expansion, Jefferson Barracks National Cemetery |
| Division | Unit of Measure | # of Units | Unit Cost $ | Extended/Total Cost $ | Comments / Remarks |
| Division 0 - Special Sections | |||||
| General Conditions and Administration | JB | 1 | |||
| Division 01 - General Requirements | |||||
| Mobilization | JB | 1 |
| Division 02 - Existing Conditions | ||
| Site Investigation | JB | 1 |
| Division 03 - Concrete |
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
| Mechanical, Electrical, Plumbing Subtotal | ||
| General Construction Subtotal | ||
| Total Base Construction Cost | ||
| Insurance (if applicable) | ||
| Bonding (if applicable) | ||
| Overhead | ________ % | $0.00 |
| Profit | ________ % | $0.00 |
| GRAND TOTALS | $ |