This document is a cost estimate worksheet for a federal solicitation to expand an in-ground cremation section at Jefferson Barracks National Cemetery in St. Louis, Missouri. The solicitation number is 36C78624B0008 and is being conducted by the Department of Veterans Affairs National Cemetery Administration. The cost estimate worksheet requires lump sum pricing for various construction divisions involved in the project, including general conditions, site work, concrete, masonry, metals, and other divisions. Offerors should complete and submit the worksheet to detail their total base construction cost as well as any applicable insurance, bonding, overhead, and profit amounts to derive their grand total price.

View the file

Other files

File Type Posted
36C78624B0008 0001.docx DOCX document
17312_Addendum-1_COMBINED.pdf PDF
36C78624B0008.docx DOCX document
DOL Wage Determination - St Louis County.pdf PDF
Specifications.pdf PDF
Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IFB Contractor Cost Estimate Worksheet
Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number.

If a Division is not being used put N/A in that field.

Additional lines/items can be added if needed or appropriate.

Offeror shall use and edit to fit Task Order Project
Project Number:852-MM22-009
Solicitation Number:36C78624B0008
Project Title:In-Ground Cremation (IGC) Section 1GJ Expansion, Jefferson Barracks National Cemetery
DivisionUnit of Measure# of UnitsUnit Cost $Extended/Total Cost $Comments / Remarks
Division 0 - Special Sections
General Conditions and AdministrationJB1
Division 01 - General Requirements
MobilizationJB1
Division 02 - Existing Conditions
Site InvestigationJB1
Division 03 - Concrete

Division 04 - Masonry

Division 05 - Metals

Division 06 - Wood, Plastic, and Composites

Division 07 - Thermal and Moisture Protection

Division 08 - Openings (Doors, Windows, etc...)

Division 09 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12- Furnishings

Division 13 - Special Construction

Division 14 - Fire Suppression

Division 22 - Plumbing

Division 23 - Heat, Ventilating, and Air Conditioning

Division 25 - Integrated Automation

Division 26 - Electrical

Division 27 - Communications

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Mechanical, Electrical, Plumbing Subtotal
General Construction Subtotal
Total Base Construction Cost
Insurance (if applicable)
Bonding (if applicable)
Overhead________ %$0.00
Profit________ %$0.00
GRAND TOTALS$