Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC

Closed Solicitation Posted

Not the latest version. See the latest special notice from .

Solicitation number
36C77626B0026
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Gainesville, Florida 32608, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Technology Acquisition Center (procuring on behalf of Gainesville VAMC) seeks construction of electronic health records management (EHRM) infrastructure upgrades and a new data center at Gainesville VA Medical Center, with proposals due September 24, 2026 at 1:00 PM EDT. This procurement is a 100% Service-Disabled Veteran-Owned Small Business set-aside, restricted to SBA-certified SDVOSB contractors; prime contractors must be certified in the SBA VetCert database. The project carries a firm-fixed-price structure, estimated value between $20 million and $50 million.

Place of performance is Gainesville, Florida (1601 SW Archer Road, Gainesville, FL 32608). The NAICS code is 236220, Commercial and Institutional Building Construction; PSC Y1DA, Construction of Hospitals and Infirmaries.

Scope encompasses a new 4,411 square foot data center building (with 1,152 SF data center room), removal and replacement of telecommunications infrastructure across 45–60 campus buildings, installation of approximately 10,242 Category 6A cable runs with 238 patch panels and fiber-optic backbone, HVAC controls integration (Siemens Desigo BAS), fire protection (Honeywell Notifier), access control (Lenel Onguard 8.3 with PIV readers), and CCTV (Hanwha Wisenet 6.0). The contractor must furnish all structured cabling, racks, cabinets, UPS units, and PDUs; network switches are government-furnished and contractor-installed.

Performance period is 921 calendar days following Notice to Proceed, anticipated within 90 days of award. The campus remains occupied throughout construction; phased work minimizes disruption to active hospital operations. The contractor must obtain VA PIV badges for Project Manager, Superintendent, Safety Officer, and Quality Control Manager; all personnel require temporary badges. Field verification of outlet locations, cable routes, and subsurface conditions is mandatory before material procurement. The contractor is responsible for ground-penetrating radar surveying (Delaware utility modifications), geotechnical field testing, professional sealed surveying certifications, site security, material protection, and compliance with infection control risk assessment (ICRA) containment protocols.

Mandatory design standards include compliance with Florida Building Code (8th edition, 2023), NFPA 101 (2024), and VA Physical Security Design Manual requirements, including blast design criteria (50-foot standoff from unscreened vehicles, 5-foot from screened vehicles). All work must comply with Buy American Act requirements for construction materials and prevailing wage rates established by the Department of Labor for Alachua County, Florida (effective May 18, 2026). For bids exceeding $35 million, Project Labor Agreement requirements apply (FAR 52.222-33 and 52.222-34, Alternate versions, January 2024 with November 2025 deviation).

For SDVOSB set-asides on general construction, the prime contractor may not pay more than 85% of the government-paid contract amount to non-certified SDVOSB/VOSB firms; material costs are excluded from this calculation. Bid guarantee required is 20% of bid price but not exceeding $3 million. Upon award, the contractor must furnish Performance Bond (SF 25) and Payment Bond (SF 25A). Award will be made to the responsible bidder offering the lowest price conforming to solicitation requirements. Bids are electronic (email) only and must include completed SF 1442 offer section, pricing schedule, bid guarantee, and all required representations and certifications. Invoices must be submitted electronically to the VA Financial Services Center.

Design team members are precluded from serving as prime or subcontractors. Brand-name systems are specified: Hanwha Wisenet (CCTV), Lenel OnGuard (access control), Honeywell Notifier (fire alarm), and Siemens Desigo (building automation); manufacturer equivalents are acceptable if coordination is demonstrated. Bonding requirements must be satisfied through SDVOSB entities or approved SBA/VA Mentor-Protégé partnerships.

A mandatory organized site visit was held July 29, 2026. Bid opening occurs via Microsoft Teams on September 24, 2026 at 1:30 PM ET; participants may call 1-205-235-3524, access code 684 257 019#, or use Meeting ID 252 471 389 092 837, Passcode yS3KF2Ex. No in-person bid opening is offered. The 90-day acceptance period is required. Contracting Officer is Donald A. Marsh III; Contract Specialist is Shawn Tavernia (Shawn.Tavernia@va.gov).

Notice text

Solicitation

Files

File Type Posted
Tech Questions Tracker - Gainesville - 9-18-26.docx DOCX document
36C77626B0026 0010.pdf PDF
36C77626B0026 0009.pdf PDF
Tech Questions Tracker - Gainesville - 9-8-26.docx DOCX document
36C77626B0026 0008.pdf PDF
100 PERCENT CIVIL BID SET.zip ZIP file
36C77626B0026 0007.pdf PDF
Tech Questions Tracker - Gainesville - 9-3-26.docx DOCX document
Addendum 1 - Gainesville EHRM - VA 573-21-106 - 8.18.26.pdf PDF
Tech Questions Tracker - Gainesville - 9-2-26.docx DOCX document
36C77626B0026 0006.pdf PDF
CAD Files - 69.zip ZIP file
Technical Questions Spreadsheet - Gainesville - 8-31-26.docx DOCX document
36C77626B0026 0005.pdf PDF
36C77626B0026 0004.pdf PDF
Technical Questions Spreadsheet - Gainesville - 8-27-26.docx DOCX document
Technical Questions Spreadsheet - Gainesville - 8-24-26.docx DOCX document
36C77626B0026 0003.pdf PDF
36C77626B0026 0002.pdf PDF
36C77626B0026 0001.pdf PDF
Site Visit Sign-in Sheet - Gainesville.pdf PDF
Attachment 2 - Drawings Volume 01.pdf PDF
Attachment 3 - Drawings Volume 02.pdf PDF
Attachment 4 - Drawings Volume 03.pdf PDF
Attachment 7 - VHA ICRA-1.4 - April 14 2026 - 0.pdf PDF
Attachment 8 - VHA PCRA-1.1 - May 21 2024 -MAY-2026.pdf PDF
Attachment 10 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 11 - Construction Wage Rates - Alachua - 05-18-26.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 9 - Brand Name Justification - Redacted.pdf PDF
Attachment 12 - Site Visit Instructions.pdf PDF
36C77626B0026.pdf PDF
Attachment 5 - Narrative.pdf PDF
Attachment 6 - GNV EHRM - Phasing Plan - 260618.pdf PDF
Show all 34

Notice history

Notice Type Posted
Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC Latest special notice Special Notice
This notice Solicitation
Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
5680--FY27 NRM (PROJ 573-24-110) BB - Expand Cardiology Service Gainesville, Florida 32608, United States · NAICS 236220 Veterans Integrated Service Network 8 Service-Disabled Veteran-Owned Small Business
763-25-700 EHRM Infrastructure Upgrades Construction Dallas CMOP, TX Dallas, Texas 75216, United States · NAICS 236220 VA Technology Acquisition Center Service-Disabled Veteran-Owned Small Business
Y1DA--FY27 NRM - EHRM Base 509-22-701 - EHRM Infrastructure Upgrades - Downtown Division - Construction (VA-27-00011175) Charlie Norwood Vamc Downtown Division Augusta Georgia 30901 · NAICS 236220 VA Technology Acquisition Center No set-aside
Y1DA--Construction | 619-21-106 | EHRM Infrastructure Upgrades - Montgomery (VA-27-00002289) Montgomery, Alabama 36109, United States · NAICS 236220 VA Technology Acquisition Center Service-Disabled Veteran-Owned Small Business
Y1DA--512A5-22-700 | EHRM Infra Upgrades | Perry Point, MD CO: Samantha Mihaila CS: Ric Sochor Perry Point, Maryland 21902, United States · NAICS 236220 VA Technology Acquisition Center Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors