Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC

Pre-Solicitation Posted

Not the latest version. See the latest special notice from .

Solicitation number
36C77626B0026
Agency
Responses due
Not on record
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Malcom Randall Vamc Gainesville, Florida 32608, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Health Administration Program Contracting Activity Central anticipates soliciting bids for the EHRM Infrastructure Upgrades and Data Center Construction project at Gainesville VA Medical Center in Gainesville, Florida, with solicitation expected in mid to late July 2026 and award anticipated in late September 2026. This procurement is set aside entirely for Service-Disabled Veteran-Owned Small Businesses; only SDVOSB concerns are eligible to submit offers.

The project scope encompasses replacement of all data infrastructure across the Gainesville VAMC and construction of a new one-story data center building approximately 3,931 square feet in footprint, located where temporary trailer 11 will be demolished. The primary data center room comprises 1,177 square feet, with supporting spaces for unpacking, packing, staging, entrance, storage, mechanical, electrical, and HVAC systems, plus a separate generator room. The contractor will remove all existing equipment and cabling from 59 telecom rooms across the campus; most rooms require architectural redesign for new telecom equipment, though some existing telecom rooms will be reused. In rare cases telecom enclosures will require exceptions or architectural work.

The entire campus remains occupied during construction. The contractor must coordinate all room closures and shutdowns with the Contracting Officer's Representative. Off-hour work is anticipated for critical spaces.

The solicitation will be issued as an Invitation for Bids under FAR Part 14. Estimated project cost falls between $20 million and $50 million. Period of performance is approximately 921 calendar days from notice to proceed. NAICS code 236220 applies with a $45 million size standard.

Notice text

INTRODUCTION

The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) anticipates soliciting bids and subsequently awarding a single firm-fixed-price contract for the design-bid-build EHRM Infrastructure Upgrades and Data Center Construction project at the Gainesville VA Medical Center located at 1601 Southwest Archer Road, Gainesville, FL 32608.

PROJECT DESCRIPTION

The scope of this project is to replace all data infrastructure across the Gainesville VAMC and to build a new data center to support that upgraded system. The data center building will be one story, and the footprint will be approximately 3,931 SF at the location of temporary trailer 11, which will be demolished as part of this project. The primary space within the building is the 1,177 SF Data Center Room. Supporting spaces include Unpacking/Packing/Staging, Entrance Room, and Storage. Mechanical, Electrical, and HVAC spaces. Additionally, a new generator will be housed in a separate Generator Room. Also, this project will be removing all existing equipment and cabling affiliated with the telecom rooms in all campus buildings. There are 59 telecom rooms that may require architectural work. Some rooms are existing TRs being reused, but most are new rooms being redesigned for the telecom equipment. In rare cases telecom enclosures are recommended and/or exceptions will be required. The entire campus will be occupied while work occurs. Contractor will have to coordinate room closures and shutdowns with the COR. Most rooms on campus will be affected. Some off-hour work is anticipated for more critical spaces.

ADMINISTRATIVE

The solicitation will be issued as an Invitation for Bids (IFB) conducted in accordance with FAR part 14 and will be evaluated in accordance with the procedures listed in the solicitation. The solicitation will be issued as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Offers received from other than SDVOSB concerns will not be considered. The applicable North American Industry Classification System (NAICS) code is 236220 with a size standard of $45.0 million. The solicitation will be issued in mid to late July 2026, with an estimated late September 2026 award. The period of performance is approximately 921 calendar days from the issuance of the notice to proceed. In accordance with VAAR 836.204, the magnitude of construction is between $20,000,000 and $50,000,000 (although the middle of this range is more relevant). This notice is not a request for competitive offers. All questions must be submitted in writing to the issuing office via email to Shawn.Tavernia@va.gov. Telephone calls will not be accepted.

Files

File Type Posted
36C77626B0026_1.docx DOCX document

Notice history

Notice Type Posted
Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC Latest special notice Special Notice
Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Y1DA--FY27 NRM - EHRM Base 509-22-701 - EHRM Infrastructure Upgrades - Downtown Division - Construction (VA-27-00011175) Charlie Norwood Vamc Downtown Division Augusta Georgia 30901 · NAICS 236220 VA Technology Acquisition Center No set-aside
5680--FY27 NRM (PROJ 573-24-110) BB - Expand Cardiology Service Gainesville, Florida 32608, United States · NAICS 236220 Veterans Integrated Service Network 8 Service-Disabled Veteran-Owned Small Business
Y1DA--Construction | 619-21-106 | EHRM Infrastructure Upgrades - Montgomery (VA-27-00002289) Montgomery, Alabama 36109, United States · NAICS 236220 VA Technology Acquisition Center Service-Disabled Veteran-Owned Small Business
Y1DA--512A5-22-700 | EHRM Infra Upgrades | Perry Point, MD CO: Samantha Mihaila CS: Ric Sochor Perry Point, Maryland 21902, United States · NAICS 236220 VA Technology Acquisition Center Service-Disabled Veteran-Owned Small Business
763-25-700 EHRM Infrastructure Upgrades Construction Dallas CMOP, TX Dallas, Texas 75216, United States · NAICS 236220 VA Technology Acquisition Center Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors