WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Pre-Solicitation Posted

Solicitation number
69056726R000020
Agency
Responses due
Not on record
Set-aside
No set-aside

Opportunity facts

Place of performance
Yellowstone National Park, Wyoming, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration intends to solicit a firm-fixed-price task order contract for 4R roadway reconstruction on the Grand Loop Road in Yellowstone National Park, with solicitation anticipated for winter 2026/2027 and a Notice to Proceed planned for May 2027. This procurement is restricted to six MATOC holders: H-K Contractors, Inc.; M.A. Deatley Construction, Inc.; Missouri River Contractors, LLC; Oftedal Construction, Inc.; Riverside Contracting Inc; and Sundt Construction, Inc.

Work encompasses 0.7 miles of roadway and associated parking lot located 0.4 miles southwest of Mammoth, Wyoming, including excavation, blasting, rock scaling, embankment and drainage improvements, retaining wall construction, stone masonry, utility and waterline relocation, boardwalk construction, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage. Slope scaling quantities will be quantified by hours of work with rock bolts and dowels installed at slope scaling locations. The project will be solicited under two bid schedules and one option, with only one schedule awarded.

Estimated price range is $45,000,000 to $55,000,000 with tentative completion in Fall 2028. Preliminary plans are available for site review; prospective offerors are encouraged to view the project before November 1, 2026, when snow may restrict access. Full solicitation documents will be released winter 2026/2027. Questions and answers documents were posted October 5 and October 20, 2026.

Notice text

3 versions

Update #3 · Latest ·

Update 10/20/2026: QA_10-20-2026.pdf posted to attachments.

Update 10/5/2026: QA_10-05-2026.pdf posted to attachments.

PROJECT: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3 

LOCATION:  0.4 miles SW of Mammoth, WY

WORK: The work consists of 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, draining improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage.  See “Project Description” posted under Attachments for additional details.

LENGTH: 0.7 miles and parking lot

TENTATIVE COMPLETION DATE:  Fall 2028

CONTRACT TYPE: Firm-Fixed-Price Task Order Contract

ESTIMATED PRICE RANGE: Between $ 45,000,000   and $55,000,000 . 

INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.

NOTICE OF SUBCONTRACTING OPPORTUNITY

This project will be solicited to the Yellowstone/Grand Teton MATOC contractors.

Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton (linked under Attachments/Links)

This project is anticipated to be solicited Winter 2026/2027                      

PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis.

To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page.  When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.

Update #2 ·

Update 10/5/2026: QA_10-05-2026.pdf posted to attachments.

PROJECT: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3 

LOCATION:  0.4 miles SW of Mammoth, WY

WORK: The work consists of 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, draining improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage.  See “Project Description” posted under Attachments for additional details.

LENGTH: 0.7 miles and parking lot

TENTATIVE COMPLETION DATE:  Fall 2028

CONTRACT TYPE: Firm-Fixed-Price Task Order Contract

ESTIMATED PRICE RANGE: Between $ 45,000,000   and $55,000,000 . 

INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.

NOTICE OF SUBCONTRACTING OPPORTUNITY

This project will be solicited to the Yellowstone/Grand Teton MATOC contractors.

Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton (linked under Attachments/Links)

This project is anticipated to be solicited Winter 2026/2027                      

PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis.

To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page.  When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.

Update #1 ·

PROJECT: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3 

LOCATION:  0.4 miles SW of Mammoth, WY

WORK: The work consists of 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, draining improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage.  See “Project Description” posted under Attachments for additional details.

LENGTH: 0.7 miles and parking lot

TENTATIVE COMPLETION DATE:  Fall 2028

CONTRACT TYPE: Firm-Fixed-Price Task Order Contract

ESTIMATED PRICE RANGE: Between $ 45,000,000   and $55,000,000 . 

INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.

NOTICE OF SUBCONTRACTING OPPORTUNITY

This project will be solicited to the Yellowstone/Grand Teton MATOC contractors.

Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton (linked under Attachments/Links)

This project is anticipated to be solicited Winter 2026/2027                      

PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis.

To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page.  When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.

Files

File Type Posted
QA_10-20-2026.pdf PDF
QA_10-05-2026.pdf PDF
Prelim Letter_WY NP YELL 10(24).pdf PDF
yell10-24_Preliminary Plans.pdf PDF
PROJECT DESCRIPTION_WY NP YELL 10(24).pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 Coeur d Alene, Idaho, United States · NAICS 237310 Federal Highway Administration No set-aside
YELL 338223 - Bridge Preservation NAICS 237310 — No set-aside
Access Road Repair National Elk Refuge NAICS 237310 — Total Small Business
NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip NAICS 237310 — No set-aside
CO OMAD 300(71) Minuteman Missile Access Cheyenne, Wyoming, United States · NAICS 237310 Federal Highway Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors