Prelim Letter_WY NP YELL 10(24).pdf

PDF 229 KB Posted

Attached to
WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
Solicitation number
69056726R000020
Issued by

About this file

Presolicitation Notice

This presolicitation notice announces an upcoming Task Order Contract (MATOC) for the Grand Loop Road Norris to Golden Gate, Phase 3 project (WY NP YELL 10(24), Solicitation No. 69056726R000020) under the Western Federal Lands Highway Division. Proposals will only be accepted from six prime contractors previously awarded positions on the underlying MATOC: H-K Contractors, Inc.; M.A. Deatley Construction, Inc.; Missouri River Contractors, LLC; Oftedal Construction, Inc.; Riverside Contracting Inc; and Sundt Construction, Inc. The work consists of reconstructing 0.7 miles of roadway and visitor facilities along the Grand Loop Road in Yellowstone National Park, including excavation and blasting at Golden Gate, slope scaling, MSE wall construction, stone masonry, waterline replacement, parking area improvements, boardwalk construction, drainage improvements, base aggregate, and asphalt paving.

The project will be solicited under two bid schedules and one option, with only one schedule to be awarded. Schedule A includes mainline construction with a 22-foot typical section pavement width and Norris Geyser Basin parking lot reconstruction; Schedule B includes mainline construction with a 30-foot typical section pavement width and parking lot reconstruction; Option Z includes grading, base, pavement, major drainage, and steel boardwalk work on Rustic Falls Boardwalk and Osprey Pit Road Box Culvert. Preliminary plans are available to assist prospective offerors, with project viewing encouraged during fall before November 1, 2026, when snow may restrict access. Full solicitation documents will be released during winter 2026/2027, with notifications available through SAM.gov. Technical questions should be directed to wfl.plansspec@dot.gov, and general inquiries to wfl.contracts@dot.gov or 360-619-7520.

View the file

Other files

File Type Posted
QA_10-05-2026.pdf PDF
PROJECT DESCRIPTION_WY NP YELL 10(24).pdf PDF
yell10-24_Preliminary Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Western Federal Lands Highway Division 610 E. Fifth Street

Vancouver, WA 98661 Phone 360-619-7700

Fax 360-619-7846

NOTICE TO PROSPECTIVE OFFERORS

RE: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Solicitation No. 69056726R000020

SPECIAL NOTICE RE: Yellowstone, Grand Teton, and Surrounding Area Multiple Award

Task Order Contract (MATOC).

THIS PRESOLICITATION NOTICE IS BEING POSTED ON SAM.GOV TO ANNOUNCE

THE UPCOMING PROJECT AND ASSIST POTENTIAL SUBCONTRACTORS BY

PUBLICIZING OPPORTUNITIES. A PROPOSAL WILL ONLY BE ACCEPTED FROM

THE PRIME CONTRACTORS LISTED BELOW.

Contract Number Contractor Name Phone

69056724D000010 H-K CONTRACTORS, INC. 208-523-6600

69056724D000011 M.A. DEATLEY CONSTRUCTION, INC. 509-751-1580

69056724D000012 MISSOURI RIVER CONTRACTORS, LLC 406-443-2524

69056724D000013 OFTEDAL CONSTRUCTION, INC. 406-232-5911

69056724D000014 RIVERSIDE CONTRACTING INC 406-721-9267

69056724D000015 SUNDT CONSTRUCTION, INC. 801-853-8070

The attached preliminary plans are being furnished to aid prospective Offerors in identifying the location and type of work for this project. The project will be advertised during a period when viewing of the project may not be possible due to snow. Therefore, prospective Offerors are encouraged to view the project during fall as conditions permit. After November 1, 2026, access may not be available. No Federal Highway Administration personnel will be available for show-me tours.

Two Bid Schedules and one Option - The work will be solicited under two schedules and one

Option. One schedule will be awarded. See the Project Description document posted on

SAM.gov under “Attachments” for additional details.

• Schedule A consists of mainline construction with a 22-foot typical section pavement width and reconstruction of Norris Geyser Basin parking lot.

• Schedule B consists of mainline construction with a 30-foot typical section pavement width and reconstruction of Norris Geyser Basin parking lot.

September 23, 2026

Preliminary Plans letter

Project: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

• Option Z consists of grading, base, pavement, major drainage, and steel boardwalk on the

Rustic Falls Boardwalk and the Osprey Pit Road Box Culvert.

Project Location and Type of Work - All project work is located along the Grand Loop Road in Yellowstone National Park. The purpose of this project is reconstruct the 0.7 mile roadway section and adjacent visitor facilities. Work items include excavation (blasting) at Golden Gate, slope scaling, MSE wall construction, stone masonry, waterline replacement, parking area improvements, boardwalk construction, roadway excavation, drainage improvements, base aggregate, and asphalt paving. The work also includes reconstruction of the parking area at

Norris Geyser Basin.

Technical Questions – All technical questions must be submitted by email wfl.plans-spec@dot.gov .

General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520.

Solicitation documents - Documents will be available during the winter of 2026/2027. Please monitor the SAM site (www.sam.gov) for actual date of solicitation release. To receive automatic notification through SAM, you must be logged in and select the “Follow” feature. For more information go to How do I follow items on SAM.gov?.

Thank you for your interest in this project.