This is a presolicitation document for a federal construction project at Yellowstone National Park in Wyoming.
The project, WY NP YELL 10(24), involves 4R roadway reconstruction of the Grand Loop Road from Norris to Golden Gate, Phase 3, spanning 0.7 miles plus a parking lot located 0.4 miles southwest of Mammoth, WY. The work scope encompasses excavation, blasting, rock scaling, embankment and drainage improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility and waterline relocation, boardwalk construction, obliteration, base aggregate installation, asphalt paving, concrete curb and gutter, striping, and signage. The estimated price range is $45,000,000 to $55,000,000, with a tentative solicitation date of Winter 2026/2027 and a tentative fixed completion date of Fall 2028. The document provides a detailed breakdown of work quantities organized by division, including project requirements (survey, quality control, erosion control), earthwork (clearing, grubbing, excavation, rock blasting), slope reinforcement and retaining walls, aggregate and base courses, asphalt pavements, incidental construction (culverts, drains, curb and gutter, water systems, sidewalks, stone masonry, traffic control), and landscaping elements. Three schedule options (Schedule A, Schedule B, and Option Z) are presented with varying quantities for specific line items, allowing for flexibility in project scope or phasing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_10-05-2026.pdf | ||
| Prelim Letter_WY NP YELL 10(24).pdf | ||
| yell10-24_Preliminary Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
Yellowstone National Park
Park County, Wyoming
The work consists of 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, draining improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage.
Project length: 0.7 miles and parking lot
Tentative Fixed Completion Date: Fall 2028
(Once solicitation is issued, see SF1442 Continuation, Block 11 for exact date.)
Tentative Solicitation Date: Winter 2026/2027
Estimated Price Range: $45,000,000 to $55,000,000
Location: 0.4 miles SW of Mammoth, WY
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-24
S ch ed u le A ed u
B
O p ti o n Z
DIVISION 150 – Project Requirements
152 Construction Survey & Staking (yes/no) Yes Yes Yes
153 Contractor Quality Control and Assurance (yes/no) Yes Yes Yes
154 Contractor Sampling & Testing (yes/no) Yes Yes Yes
155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes Yes Yes
157 Soil Erosion & Sediment Control (erosion control devices)
19,600
LNFT
19,600
LNFT 2,340 LNFT
158 Watering for Dust Control LPSM LPSM LPSM
DIVISION 200 – Earthwork
201 Clearing & Grubbing 14.8 Acre 14.8 ACRE 2.8 ACRE ed u ed u ti o
203 Removal of Structures & Obstructions (structures, demolition) 138 Each 138 EACH
204 Excavation & Embankment 18,030
CUYD
18,000
CUYD 360 CUYD
205 Rock Blasting: Controlled Blast Hole (rock blasting)
85,150
CUYD
85,150
CUYD
207 Earthwork Geosynthetics 3,850 SQYD 3,960 SQYD 100 SQYD
211 Roadway Obliteration 3,280 SQYD 3,280 SQYD
DIVISION 250 – Slope Reinforcement and Retaining Walls
251 Riprap 37 CUYD 111 CUYD 150 CUYD
255 Mechanically Stabilized Earth Walls (retaining walls) 1,825 SQFT 1,825 SQFT
260 Rock Bolts & Dowels 1,855 LNFT 1,855 LNFT
261 Reinforced Soil Slopes 3,550 SQFT 3,550 SQFT
DIVISION 300 – Aggregate and Base Courses
301 Untreated Aggregate Courses (crushed aggregate) 1,530 SQYD 1,530 SQYD
311 Stabilized Aggregate Surface Course 340 SQYD 340 SQYD
DIVISION 400 – Asphalt Pavements & Surface Treatments
401 Asphalt Concrete Pavement By Gyratory Mix Design Method 9,530 TON 9,710 TON
403 Asphalt Concrete 105 TON 105 TON 120 TON
412 Asphalt Tack Coat (asphalt surface treatment) 38 TON 40 TON
DIVISION 600 – Incidental Construction
601 Minor Concrete Structures (concrete – minor structures) 4 CUYD 4 CUYD
602 Culverts & Drains (indicate one or both) 1,070 LNFT 1,124 LNFT
604 Manholes, Inlets, & Catch Basins(culverts & drains) (indicate which) 29 EACH 29 EACH
605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) (indicate which) 3 LNFT 3 LNFT ed u ed u ti o
609 Curb & Gutter (concrete – minor structures) (indicate which)
10,874
LNFT
10,874
LNFT
611 Water Systems LPSM LPSM
612 Sanitary Sewer Systems LPSM LPSM
615 Sidewalks, Pads & Paved Medians (concrete – minor structures) 6,098 SQYD 6,098 SQYD
619 Fences, Gates, Cattle Guards & Bollard Posts 8 Each 8 EACH 1 EACH
620 Stone Masonry 4,460 SQYD 4,460 SQYD 13 CUYD
622 Rental Equipment (yes/no) Yes Yes Yes
623 General Labor (yes/no) Yes Yes Yes
624 Topsoil (landscaping & related items) 1.8 ACRE 1.8 ACRE 0.3 ACRE
625 Turf Establishment (indicate seeding or mulching separately) 4.4 ACRE 4.4 ACRE 0.3 ACRE
626 Plants, Trees, Shrubs, Vines & Groundcovers 95 EACH 95 EACH
633 Permanent Traffic Control (traffic control devices) 569 EACH 569 EACH 12 EACH
634 Permanent Pavement Markings (traffic pavement markings)
66,610
LNFT
66,610
LNFT
635 Temporary Traffic Control – Flagger 12,980
HOUR
12,980
HOUR
635 Temporary Traffic Control – Pilot Car 3,280 HOUR 3,280 HOUR
636 Traffic Signal, Traffic Counter, Lighting, & Electrical Systems LPSM LPSM
637 Facilities & Services (field offices, laboratories, & housing) 1 EACH 1 EACH
645 Locating Utilities LPSM LPSM
646 Roadside Development (use pay item description) 65 LNFT 65 LNFT
651 Rockfall Protection LPSM LPSM