WY FLAP US212(8) Beartooth Highway

Awarded Award Notice Posted

Solicitation number
DTFH6816B00026
Agency
Federal Highway Administration Department of Transportation
Awarded
to Oftedal Construction, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6817C00015 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Park County, Wyoming, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Sep 12, 2016 10:47 am Modified: Jan 25, 2017 8:21 pmTrack Changes

Project Details:  This project includes reconstruction of 3.773 km of roadway on Park County Road US 212, otherwise called Beartooth Highway.


Type of Construction: grading, concrete bridge, culverts, concrete headwalls, riprap, aggregate base course, and paving, traffic control, public information


The route is currently 5.4-6.1 m (18-20 feet) in width the proposed project will increase the roadway width to 9.0 m (30 feet) for the length of project.


The existing asphalt surface is severely degraded and the existing drainage is under hydraulic capacity for the entire project. The proposed project includes drainage improvements by the addition of new culverts and the construction of a concrete bridge over the Little Bear Creek. The proposed project will also address safety items in regard to roadway width, clear zone, signing, and striping.



Estimated total cost is between $12 - $15 million.

Update #1 ·

Added: Sep 12, 2016 10:47 am

This is not an Invitation for Bid, plans and specs are not available.  Advertisement is tentatively planned for November '16 and will be Full and Open Competition.


Non-Mandatory Contractor Site Visit for the WY FLAP 212(8) Beartooth Highway project.

September 27th 10:00am at the Top of the World Store parking lot.  Store is located on Beartooth Highway.  No RSVP is required.

Project Details: 
This project includes reconstruction of 3.773 km of roadway on Park County Road US 212, otherwise called Beartooth Highway.


Type of Construction: grading, concrete bridge, culverts, concrete headwalls, riprap, aggregate base course, and paving, traffic control, public information


The route is currently 5.4-6.1 m (18-20 feet) in width the proposed project will increase the roadway width to 9.0 m (30 feet) for the length of project.


The existing asphalt surface is severely degraded and the existing drainage is under hydraulic capacity for the entire project. The proposed project includes drainage improvements by the addition of new culverts and the construction of a concrete bridge over the Little Bear Creek. The proposed project will also address safety items in regard to roadway width, clear zone, signing, and striping.


Attached at 95% Plan Sheets A1 and A6 for informational purposed for the Site Visit.  The entire 100% Plan Sheets will be posted with the Solicitation.

Estimated total cost is between $12 - $15 million.