Bid_Tabs_-_Bid_Opening_3_2_2017.pdf
PDF 31 KB Posted
- Attached to
- WY FLAP US212(8) Beartooth Highway Federal contract opportunity
- Solicitation number
- DTFH6816B00026
About this file
Bid Tabs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA.docx | DOCX document | |
| Bid_Opening_Summary.pdf | ||
| QnA_2_28_17_for_posting.pdf | ||
| QnA_2_27_17_for_posting.pdf | ||
| A002.pdf | ||
| A001.pdf | ||
| QnA_2_21_17_for_posting.pdf | ||
| Questions_and_Answers_during_Advertisement_for.pdf | ||
| DTFH6816B00026_IFB.pdf | ||
| Pages_60_to_118_from_WY_FLAP_US212(8)_100__XS_Set_11-01-2016-2.pdf | ||
| Pages_67_to_132_WY_FLAP_US212(8)_100__Plan_Set_11-28-2016.pdf | ||
| Pages_1_to_66from_WY_FLAP_US212(8)_100__Plan_Set_11-28-2016-3.pdf | ||
| Pages_133_to_198_WY_FLAP_US212(8)_100__Plan_Set_11-28-2016-2.pdf | ||
| Pages_1_to_59_from_WY_FLAP_US212(8)_100__XS_Set_11-01-2016.pdf | ||
| WY.HPP.4-1(5).Beartooth_Highway.Pavements.2008.pdf | ||
| Revised_Final_Fish_Passage_Memo.pdf | ||
| Site_Visit_Sign_In_9.27.16.pdf | ||
| DTFH6816B00026_IFB.pdf | ||
| Final_Fish_Passage_Recommendation_January_2005.pdf | ||
| WY_FLAP_US212(8)_95__Sheets_A1_and_A-6.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T A B U L A T I O N O F B I D S
Total of Bid Items: 13,304,000.00$ -28.6% 9,495,180.56$ -19.3% 10,735,645.10$ -11.7% 11,744,333.00$ -10.3% 11,938,997.50$ -18.4% 10,860,459.98$ -5.8% 12,538,967.00$ -4.4% 12,714,216.00$ 10.1% 14,643,847.00$ Project No: WY/ FLAP US212(8)
Project Name: Beartooth Highway
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15101-0000
Line A0020 ALL LPSM 1,960,436.00$ 1,960,436.00$ 949,000.00$ 2,100,000.00$ 1,949,827.50$ 1,995,000.00$ 940,000.00$ 2,275,000.00$ 1,400,000.00$ 1,500,000.00$
15206-0000
Line A0040 3.773 km 5,000.00$ 18,865.00$ 56,595.00$ 22,619.14$ 26,411.00$ 26,411.00$ 35,126.63$ 26,411.00$ 37,730.00$ 37,730.00$
15214-1000
Line A0060 ALL LPSM 11,000.00$ 11,000.00$ 25,000.00$ 15,750.00$ 14,000.00$ 14,000.00$ 18,280.00$ 12,000.00$ 40,000.00$ 25,000.00$
15215-1000
Line A0080 3 Each 3,500.00$ 10,500.00$ 15,000.00$ 5,550.00$ 6,000.00$ 4,800.00$ 6,330.00$ 5,400.00$ 6,600.00$ 15,000.00$
15215-3000
Line A0100 20 Each 900.00$ 18,000.00$ 24,000.00$ 10,000.00$ 30,000.00$ 28,000.00$ 35,200.00$ 36,000.00$ 40,000.00$ 50,000.00$
15216-2000
Line A0120 7.545 km 4,000.00$ 30,180.00$ 27,162.00$ 30,157.37$ 49,042.50$ 47,533.50$ 63,604.35$ 45,270.00$ 67,905.00$ 60,360.00$
15301-0000
Line A0140 ALL LPSM 400,000.00$ 400,000.00$ 150,000.00$ 251,000.00$ 320,000.00$ 275,000.00$ 384,950.00$ 550,000.00$ 275,000.00$ 500,000.00$
15401-0000
Line A0160 ALL LPSM 400,000.00$ 400,000.00$ 150,000.00$ 110,100.00$ 10,000.00$ 250,000.00$ 160,980.00$ 50,000.00$ 450,000.00$ 760,000.00$
15501-0000
Line A0180 ALL LPSM 40,000.00$ 40,000.00$ 14,500.00$ 2,603.00$ 15,000.00$ 15,000.00$ 16,830.00$ 15,000.00$ 50,000.00$ 30,000.00$
15703-1500
Line A0200 17.100 ha 4,000.00$ 68,400.00$ 30,096.00$ 15,685.66$ 102,600.00$ 25,650.00$ 40,869.00$ 20,520.00$ 20,520.00$ 17,100.00$
15705-0100
Line A0220 7,500 m 12.00$ 90,000.00$ 75,000.00$ 86,250.00$ 112,500.00$ 97,500.00$ 37,125.00$ 75,000.00$ 75,000.00$ 112,500.00$
15705-1400
Line A0240 225 m 17.00$ 3,825.00$ 1,980.00$ 3,825.00$ 4,725.00$ 5,175.00$ 2,700.00$ 2,250.00$ 3,375.00$ 5,400.00$
15706-0200
Line A0260 130 Each 450.00$ 58,500.00$ 30,940.00$ 8,255.00$ 6,500.00$ 35,750.00$ 175,500.00$ 19,500.00$ 19,500.00$ 22,100.00$
15706-0300
Line A0280 25 Each 30.00$ 750.00$ 1,112.50$ 637.50$ 500.00$ 3,125.00$ 90.00$ 1,250.00$ 175.00$ 750.00$
15706-1600
Line A0300 1 Each 3,000.00$ 3,000.00$ 1,630.00$ 3,220.00$ 3,500.00$ 5,500.00$ 3,980.00$ 2,500.00$ 1,800.00$ 4,000.00$
15802-0000
Line A0320 ALL LPSM 175,000.00$ 175,000.00$ 16,800.00$ 31,740.00$ 50,000.00$ 40,000.00$ 26,250.00$ 300,000.00$ 200,000.00$ 750,000.00$
20101-0000
Line A0340 15.000 ha 10,000.00$ 150,000.00$ 300,000.00$ 25,410.00$ 60,000.00$ 117,000.00$ 64,800.00$ 22,500.00$ 105,000.00$ 30,000.00$
20202-0000
Line A0360 200 m2 (CQ) 100.00$ 20,000.00$ 20,000.00$ 3,400.00$ 8,000.00$ 8,600.00$ 18,500.00$ 4,000.00$ 18,000.00$ 4,000.00$
20301-0400
Line A0380 1 Each 55,000.00$ 55,000.00$ 75,000.00$ 21,000.00$ 34,000.00$ 50,000.00$ 36,730.00$ 70,000.00$ 80,000.00$ 100,000.00$
20301-1100
Line A0400 1 Each 500.00$ 500.00$ 418.00$ 515.50$ 1,000.00$ 1,000.00$ 337.00$ 900.00$ 310.00$ 1,500.00$
20301-1900
Line A0420 14 Each 2,000.00$ 28,000.00$ 26,880.00$ 8,356.88$ 7,000.00$ 26,600.00$ 31,080.00$ 14,000.00$ 15,400.00$ 56,000.00$
20301-2400
Line A0440 8 Each 200.00$ 1,600.00$ 212.00$ 200.00$ 1,280.00$ 2,000.00$ 1,344.00$ 2,800.00$ 352.00$ 2,000.00$
20301-2700
Line A0460 1 Each 20,000.00$ 20,000.00$ 10,000.00$ 4,920.00$ 3,000.00$ 16,000.00$ 11,610.00$ 25,000.00$ 50,000.00$ 50,000.00$
20303-1600
Line A0480 3,000 m2 8.00$ 24,000.00$ 7,200.00$ 13,050.00$ 15,000.00$ 24,000.00$ 45,000.00$ 12,000.00$ 90,000.00$ 18,000.00$
20401-0000
Line A0500 64,000 m3 35.00$ 2,240,000.00$ 1,196,800.00$ 1,568,000.00$ 1,664,000.00$ 1,792,000.00$ 1,504,000.00$ 1,120,000.00$ 2,432,000.00$ 1,600,000.00$
20402-0000
Line A0520 5,200 m3 45.00$ 234,000.00$ 423,800.00$ 448,500.00$ 286,000.00$ 280,800.00$ 226,200.00$ 192,400.00$ 208,000.00$ 520,000.00$
20441-0000
Line A0540 4,500 m3 18.00$ 81,000.00$ 56,250.00$ 67,500.00$ 117,000.00$ 112,500.00$ 87,750.00$ 47,250.00$ 180,000.00$ 81,000.00$
20701-0700
Line A0560 18,000 m2 5.00$ 90,000.00$ 61,200.00$ 33,300.00$ 54,000.00$ 49,500.00$ 51,120.00$ 90,000.00$ 54,000.00$ 54,000.00$
20801-0000
Line A0580 200 m3 (CQ) 50.00$ 10,000.00$ 8,000.00$ 5,250.00$ 15,000.00$ 10,000.00$ 8,600.00$ 4,400.00$ 7,200.00$ 25,000.00$
20803-0000
Line A0600 600 m3 (CQ) 100.00$ 60,000.00$ 73,200.00$ 56,700.00$ 21,000.00$ 52,800.00$ 80,400.00$ 49,200.00$ 40,800.00$ 150,000.00$
20811-0000
Line A0620 500 m2 4.00$ 2,000.00$ 154,000.00$ 147,500.00$ 250,000.00$ 155,000.00$ 205,000.00$ 75,000.00$ 25,000.00$ 140,000.00$
21101-1000
Line A0640 10,000 m2 10.00$ 100,000.00$ 100,000.00$ 132,500.00$ 150,000.00$ 170,000.00$ 220,000.00$ 170,000.00$ 140,000.00$ 140,000.00$
25101-2000
Line A0660 150 m3 180.00$ 27,000.00$ 12,075.00$ 29,550.00$ 18,000.00$ 21,000.00$ 21,000.00$ 19,500.00$ 12,750.00$ 36,000.00$
25101-3000
Line A0680 150 m3 180.00$ 27,000.00$ 14,100.00$ 35,625.00$ 21,000.00$ 24,000.00$ 21,000.00$ 18,000.00$ 12,750.00$ 39,000.00$
25101-3000
Line A0700 50 m3 180.00$ 9,000.00$ 4,025.00$ 9,850.00$ 5,000.00$ 7,500.00$ 7,000.00$ 7,000.00$ 4,250.00$ 13,000.00$
25101-4000
Line A0720 200 m3 200.00$ 40,000.00$ 16,100.00$ 49,000.00$ 15,000.00$ 32,000.00$ 27,800.00$ 24,000.00$ 16,400.00$ 53,000.00$
Survey and staking, approach road
5,000.00$ 1,850.00$ 2,000.00$ 1,600.00$ 2,110.00$ 1,800.00$ 2,200.00$ 5,000.00$
Structural backfill (Mechanically Reinforced)
Shoring and bracing (Other Structures)
Roadway obliteration, method 1
Placed riprap, class 2
Placed riprap, class 3 (With Soil)
Placed riprap, class 3
Placed riprap, class 4
Mobilization
Slope, reference, and clearing and grubbing stake
Survey and staking, bridge
Watering for dust control
Clearing and grubbing
Selective clearing
Contractor quality control
Contractor testing
Construction schedule
Soil erosion control, temporary soil tackifier
Soil erosion control, silt fence
Soil erosion control, sediment log
Roadway excavation
Subexcavation
Waste
Earthwork geotextile, type II-A
Structure excavation
Removal of bridge
Removal of gate
Removal of pipe culvert
Removal of signs
Removal of structure (Shower House)
Removal of pavement, asphalt
Survey and staking, drainage structure
Survey and staking, grade finishing stakes
Soil erosion control, check dam
Soil erosion control, sandbag
Soil erosion control, stabilized construction entrance
2,100,000.00$ 1,949,827.50$ 1,995,000.00$
40,000.00$ 25,000.00$
Missouri River Contractors Stormwater Plans LLC DBA SWPAmerican Civil Constructors, LLCOftedal Construction, Inc. JTL DBA KnifeRiver Yellowstone HK Contractors, Inc. Riverside Contracting, Inc. ESCO Construction
15,000.00$
949,000.00$
1,200.00$ 500.00$ 1,500.00$ 1,400.00$ 1,760.00$ 1,800.00$ 2,000.00$ 2,500.00$
940,000.00$ 2,275,000.00$ 1,400,000.00$ 1,500,000.00$
5,995.00$ 7,000.00$ 7,000.00$ 9,310.00$ 7,000.00$ 10,000.00$ 10,000.00$
25,000.00$ 15,750.00$ 14,000.00$ 14,000.00$ 18,280.00$ 12,000.00$
150,000.00$ 110,100.00$ 10,000.00$ 250,000.00$ 160,980.00$ 50,000.00$ 450,000.00$ 760,000.00$
150,000.00$ 251,000.00$ 320,000.00$ 275,000.00$ 384,950.00$ 550,000.00$ 275,000.00$ 500,000.00$
3,600.00$ 3,997.00$ 6,500.00$ 6,300.00$ 8,430.00$ 6,000.00$ 9,000.00$ 8,000.00$
1,760.00$ 917.29$ 6,000.00$ 1,500.00$ 2,390.00$ 1,200.00$ 1,200.00$ 1,000.00$
14,500.00$ 2,603.00$ 15,000.00$ 15,000.00$ 16,830.00$ 15,000.00$ 50,000.00$ 30,000.00$
8.80$ 17.00$ 21.00$ 23.00$ 12.00$ 10.00$ 15.00$ 24.00$
10.00$ 11.50$ 15.00$ 13.00$ 4.95$ 10.00$ 10.00$ 15.00$
44.50$ 25.50$ 20.00$ 125.00$ 3.60$ 50.00$ 7.00$ 30.00$
238.00$ 63.50$ 50.00$ 275.00$ 1,350.00$ 150.00$ 150.00$ 170.00$
16,800.00$ 31,740.00$ 50,000.00$ 40,000.00$ 26,250.00$ 300,000.00$ 200,000.00$ 750,000.00$
1,630.00$ 3,220.00$ 3,500.00$ 5,500.00$ 3,980.00$ 2,500.00$ 1,800.00$ 4,000.00$
100.00$ 17.00$ 40.00$ 43.00$ 92.50$ 20.00$ 90.00$ 20.00$
20,000.00$ 1,694.00$ 4,000.00$ 7,800.00$ 4,320.00$ 1,500.00$ 7,000.00$ 2,000.00$
418.00$ 515.50$ 1,000.00$ 1,000.00$ 337.00$ 900.00$ 310.00$ 1,500.00$
75,000.00$ 21,000.00$ 34,000.00$ 50,000.00$ 36,730.00$ 70,000.00$ 80,000.00$ 100,000.00$
26.50$ 25.00$ 160.00$ 250.00$ 168.00$ 350.00$ 44.00$ 250.00$
1,920.00$ 596.92$ 500.00$ 1,900.00$ 2,220.00$ 1,000.00$ 1,100.00$ 4,000.00$
2.40$ 4.35$ 5.00$ 8.00$ 15.00$ 4.00$ 30.00$ 6.00$
10,000.00$ 4,920.00$ 3,000.00$ 16,000.00$ 11,610.00$ 25,000.00$ 50,000.00$ 50,000.00$
81.50$ 86.25$ 55.00$ 54.00$ 43.50$ 37.00$ 40.00$ 100.00$
18.70$ 24.50$ 26.00$ 28.00$ 23.50$ 17.50$ 38.00$ 25.00$
3.40$ 1.85$ 3.00$ 2.75$ 2.84$ 5.00$ 3.00$ 3.00$
12.50$ 15.00$ 26.00$ 25.00$ 19.50$ 10.50$ 40.00$ 18.00$
122.00$ 94.50$ 35.00$ 88.00$ 134.00$ 82.00$ 68.00$ 250.00$
40.00$ 26.25$ 75.00$ 50.00$ 43.00$ 22.00$ 36.00$ 125.00$
10.00$ 13.25$ 15.00$ 17.00$ 22.00$ 17.00$ 14.00$ 14.00$
308.00$ 295.00$ 500.00$ 310.00$ 410.00$ 150.00$ 50.00$ 280.00$
94.00$ 237.50$ 140.00$ 160.00$ 140.00$ 120.00$ 85.00$ 260.00$
80.50$ 197.00$ 120.00$ 140.00$ 140.00$ 130.00$ 85.00$ 240.00$
80.50$ 245.00$ 75.00$ 160.00$ 139.00$ 120.00$ 82.00$ 265.00$
80.50$ 197.00$ 100.00$ 150.00$ 140.00$ 140.00$ 85.00$ 260.00$
Engineer's Estimate
3/8/2017 Page 1 of 4
Total of Bid Items: 13,304,000.00$ -28.6% 9,495,180.56$ -19.3% 10,735,645.10$ -11.7% 11,744,333.00$ -10.3% 11,938,997.50$ -18.4% 10,860,459.98$ -5.8% 12,538,967.00$ -4.4% 12,714,216.00$ 10.1% 14,643,847.00$ Project No: WY/ FLAP US212(8)
Project Name: Beartooth Highway
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Missouri River Contractors Stormwater Plans LLC DBA SWPAmerican Civil Constructors, LLCOftedal Construction, Inc. JTL DBA KnifeRiver Yellowstone HK Contractors, Inc. Riverside Contracting, Inc. ESCO ConstructionEngineer's Estimate
25120-2000
Line A0740 120 m 375.00$ 45,000.00$ 9,660.00$ 42,060.00$ 9,000.00$ 36,600.00$ 56,880.00$ 45,600.00$ 31,200.00$ 64,200.00$
25125-0000
Line A0760 300 Each 150.00$ 45,000.00$ 51,300.00$ 48,750.00$ 30,000.00$ 112,500.00$ 169,200.00$ 67,500.00$ 33,000.00$ 54,000.00$
30101-0000
Line A0780 30,000 t 50.00$ 1,500,000.00$ 1,200,000.00$ 810,000.00$ 990,000.00$ 780,000.00$ 945,000.00$ 810,000.00$ 1,320,000.00$ 930,000.00$
40301-0000
Line A0800 7,500 t 180.00$ 1,350,000.00$ 847,500.00$ 937,500.00$ 750,000.00$ 750,000.00$ 1,537,500.00$ 1,402,500.00$ 900,000.00$ 1,312,500.00$
40920-1000
Line A0820 20 t 400.00$ 8,000.00$ 13,500.00$ 8,740.00$ 12,000.00$ 19,000.00$ 27,200.00$ 22,000.00$ 14,000.00$ 22,000.00$
41103-0000
Line A0840 42,000 m2 1.20$ 50,400.00$ 46,200.00$ 90,300.00$ 42,000.00$ 105,000.00$ 82,740.00$ 67,200.00$ 63,000.00$ 52,500.00$
41105-0000
Line A0860 330 t 60.00$ 19,800.00$ 11,880.00$ 6,270.00$ 10,560.00$ 14,850.00$ 38,940.00$ 31,350.00$ 11,550.00$ 16,500.00$
41201-1000
Line A0880 20.0 t 750.00$ 15,000.00$ 11,820.00$ 15,080.00$ 10,500.00$ 12,000.00$ 19,360.00$ 16,000.00$ 12,000.00$ 22,000.00$
55201-0200
Line A0900 205 m3 (CQ) 1,500.00$ 307,500.00$ 215,250.00$ 205,000.00$ 307,500.00$ 215,250.00$ 371,050.00$ 246,000.00$ 348,500.00$ 615,000.00$
55302-1000
Line A0920 191.20 m (CQ) 3,500.00$ 669,200.00$ 499,032.00$ 478,000.00$ 669,200.00$ 497,120.00$ 835,544.00$ 573,600.00$ 439,760.00$ 764,800.00$
55401-2000
Line A0940 31,288 kg (CQ) 3.00$ 93,864.00$ 115,765.60$ 109,508.00$ 156,440.00$ 117,330.00$ 179,906.00$ 132,974.00$ 125,152.00$ 125,152.00$
55601-0900
Line A0960 82 m (CQ) 480.00$ 39,360.00$ 68,552.00$ 65,600.00$ 123,000.00$ 68,470.00$ 81,426.00$ 78,720.00$ 65,600.00$ 45,100.00$
56305-0000
Line A0980 480 m2 (CQ) 16.00$ 7,680.00$ 13,440.00$ 13,440.00$ 24,000.00$ 31,200.00$ 18,720.00$ 16,080.00$ 19,200.00$ 12,000.00$
56901-0000
Line A1000 114 m 800.00$ 91,200.00$ 41,724.00$ 39,900.00$ 125,400.00$ 125,400.00$ 160,740.00$ 47,880.00$ 171,000.00$ 148,200.00$
56905-0000
Line A1020 1 Each 3,500.00$ 3,500.00$ 40,800.00$ 39,000.00$ 16,500.00$ 41,000.00$ 21,090.00$ 47,000.00$ 5,500.00$ 25,000.00$
60103-2160
Line A1040 2 Each 6,500.00$ 13,000.00$ 66,800.00$ 61,700.00$ 40,000.00$ 44,000.00$ 50,000.00$ 94,000.00$ 60,000.00$ 70,000.00$
60201-0300
Line A1060 5 m 215.00$ 1,075.00$ 905.00$ 692.50$ 2,000.00$ 1,250.00$ 1,835.00$ 1,750.00$ 1,100.00$ 2,500.00$
60201-0600
Line A1080 60 m 225.00$ 13,500.00$ 8,880.00$ 8,400.00$ 16,500.00$ 16,500.00$ 13,320.00$ 18,000.00$ 15,600.00$ 21,000.00$
60201-0800
Line A1100 260 m 275.00$ 71,500.00$ 53,300.00$ 59,800.00$ 58,500.00$ 74,100.00$ 61,360.00$ 78,000.00$ 78,000.00$ 104,000.00$
60201-0900
Line A1120 120 m 300.00$ 36,000.00$ 28,200.00$ 31,080.00$ 30,000.00$ 45,000.00$ 30,240.00$ 42,000.00$ 42,000.00$ 51,000.00$
60201-1000
Line A1140 30 m 550.00$ 16,500.00$ 8,130.00$ 19,680.00$ 9,750.00$ 15,750.00$ 8,010.00$ 10,500.00$ 12,000.00$ 15,300.00$
60202-1600
Line A1160 50 m 1,200.00$ 60,000.00$ 58,500.00$ 51,300.00$ 75,000.00$ 91,250.00$ 48,400.00$ 125,000.00$ 41,000.00$ 90,000.00$
60210-0300
Line A1180 2 Each 150.00$ 300.00$ 464.00$ 764.00$ 1,000.00$ 850.00$ 1,874.00$ 1,100.00$ 380.00$ 1,000.00$
60210-0600
Line A1200 6 Each 200.00$ 1,200.00$ 1,212.00$ 2,331.00$ 1,200.00$ 2,700.00$ 10,620.00$ 3,300.00$ 1,800.00$ 3,000.00$
60210-0800
Line A1220 20 Each 300.00$ 6,000.00$ 5,860.00$ 8,860.00$ 4,500.00$ 10,500.00$ 20,800.00$ 13,000.00$ 9,000.00$ 13,000.00$
60210-0900
Line A1240 14 Each 400.00$ 5,600.00$ 5,236.00$ 7,560.00$ 4,200.00$ 8,750.00$ 15,820.00$ 9,800.00$ 8,540.00$ 11,200.00$
60210-1000
Line A1260 2 Each 675.00$ 1,350.00$ 1,120.00$ 1,770.00$ 850.00$ 1,500.00$ 3,280.00$ 1,600.00$ 1,640.00$ 2,600.00$
60212-0300
Line A1280 1 Each 350.00$ 350.00$ 361.00$ 341.50$ 250.00$ 150.00$ 935.00$ 550.00$ 300.00$ 100.00$
60212-0800
Line A1300 2 Each 400.00$ 800.00$ 1,712.00$ 1,110.00$ 500.00$ 650.00$ 2,260.00$ 1,400.00$ 1,400.00$ 600.00$
60212-0900
Line A1320 1 Each 450.00$ 450.00$ 1,890.00$ 1,099.00$ 300.00$ 850.00$ 1,610.00$ 1,200.00$ 750.00$ 375.00$
60404-1000
Line A1340 1 Each 5,000.00$ 5,000.00$ 3,430.00$ 10,270.00$ 8,000.00$ 6,000.00$ -$ 7,200.00$ 7,300.00$ 6,000.00$
60901-0400
Line A1360 600 m 100.00$ 60,000.00$ 130,200.00$ 119,700.00$ 150,000.00$ 180,000.00$ -$ 150,000.00$ 60,000.00$ 75,000.00$
60908-1000
Line A1380 750 m2 75.00$ 56,250.00$ 37,875.00$ 27,000.00$ 37,500.00$ 56,250.00$ -$ 30,000.00$ 33,750.00$ 71,250.00$
61501-0800
Line A1400 30 m2 10.00$ 300.00$ 7,050.00$ 15,480.00$ 18,000.00$ 15,000.00$ -$ 3,450.00$ 3,300.00$ 2,700.00$
61701-1150
Line A1420 150 m 200.00$ 30,000.00$ 40,500.00$ 35,250.00$ 34,500.00$ 36,750.00$ -$ 45,000.00$ 40,500.00$ 30,000.00$
61702-1100
Line A1440 4 Each 3,000.00$ 12,000.00$ 24,120.00$ 22,600.00$ 28,000.00$ 26,000.00$ -$ 28,000.00$ 32,000.00$ 12,000.00$ 6,030.00$ 5,650.00$ 7,000.00$ 6,500.00$ 7,000.00$ 8,000.00$ 3,000.00$
270.00$ 235.00$ 230.00$ 245.00$ 300.00$ 270.00$ 200.00$
235.00$ 516.00$ 600.00$ 500.00$ 115.00$ 110.00$ 90.00$
50.50$ 36.00$ 50.00$ 75.00$ 40.00$ 45.00$ 95.00$
217.00$ 199.50$ 250.00$ 300.00$ 250.00$ 100.00$ 125.00$
3,430.00$ 10,270.00$ 8,000.00$ 6,000.00$ 7,200.00$ 7,300.00$ 6,000.00$
1,890.00$ 1,099.00$ 300.00$ 850.00$ 1,610.00$ 1,200.00$ 750.00$ 375.00$
856.00$ 555.00$ 250.00$ 325.00$ 1,130.00$ 700.00$ 700.00$ 300.00$
361.00$ 341.50$ 250.00$ 150.00$ 935.00$ 550.00$ 300.00$ 100.00$
560.00$ 885.00$ 425.00$ 750.00$ 1,640.00$ 800.00$ 820.00$ 1,300.00$
374.00$ 540.00$ 300.00$ 625.00$ 1,130.00$ 700.00$ 610.00$ 800.00$
Riprap ditch, class 2
Boulder
Aggregate base
Hot asphalt concrete pavement
Fog seal, emulsified asphalt grade CSS-1 or CSS-1h, SS-1 or SS-1h
Prime coat (grade MC-70)
Rock stain
Micropiles
Micropile load verification test
Concrete, headwall for 2400mm equivalent diameter pipe culvert
200mm pipe culvert
450mm pipe culvert
Blotter
Tack coat grade CSS-1, CSS-1h, SS-1, or SS-1h
Structural concrete, class A (AE)
Precast, prestressed concrete box beam, type B1-48
Reinforcing steel, epoxy coated
Bridge railing, steel (WYDOT TL-3)
End section for 600mm pipe culvert
End section for 750mm pipe culvert
End section for 900mm pipe culvert
Elbow, 200mm
Elbow, 600mm
Elbow, 750mm
600mm pipe culvert
750mm pipe culvert
900mm pipe culvert
2400mm equivalent diameter arch or elliptical pipe culvert
End section for 200mm pipe culvert
End section for 450mm pipe culvert
Catch basin, type 1
Curb, concrete, 150mm depth
Paved ditch, asphalt
Sidewalk, aggregate
Guardrail system G3 (Wyoming Box Beam System G3 Steel Posts)
Terminal section, type FAT-G3 (Wyoming Box Beam End Anchorage)
171.00$ 162.50$ 100.00$ 375.00$ 564.00$ 225.00$ 110.00$ 180.00$
80.50$ 350.50$ 75.00$ 305.00$ 474.00$ 380.00$ 260.00$ 535.00$
113.00$ 125.00$ 100.00$ 100.00$ 205.00$ 187.00$ 120.00$ 175.00$
40.00$ 27.00$ 33.00$ 26.00$ 31.50$ 27.00$ 44.00$ 31.00$
1.10$ 2.15$ 1.00$ 2.50$ 1.97$ 1.60$ 1.50$ 1.25$
675.00$ 437.00$ 600.00$ 950.00$ 1,360.00$ 1,100.00$ 700.00$ 1,100.00$
591.00$ 754.00$ 525.00$ 600.00$ 968.00$ 800.00$ 600.00$ 1,100.00$
36.00$ 19.00$ 32.00$ 45.00$ 118.00$ 95.00$ 35.00$ 50.00$
2,610.00$ 2,500.00$ 3,500.00$ 2,600.00$ 4,370.00$ 3,000.00$ 2,300.00$ 4,000.00$
1,050.00$ 1,000.00$ 1,500.00$ 1,050.00$ 1,810.00$ 1,200.00$ 1,700.00$ 3,000.00$
836.00$ 800.00$ 1,500.00$ 835.00$ 993.00$ 960.00$ 800.00$ 550.00$
3.70$ 3.50$ 5.00$ 3.75$ 5.75$ 4.25$ 4.00$ 4.00$
366.00$ 350.00$ 1,100.00$ 1,100.00$ 1,410.00$ 420.00$ 1,500.00$ 1,300.00$
28.00$ 28.00$ 50.00$ 65.00$ 39.00$ 33.50$ 40.00$ 25.00$
33,400.00$ 30,850.00$ 20,000.00$ 22,000.00$ 25,000.00$ 47,000.00$ 30,000.00$ 35,000.00$
40,800.00$ 39,000.00$ 16,500.00$ 41,000.00$ 21,090.00$ 47,000.00$ 5,500.00$ 25,000.00$
148.00$ 140.00$ 275.00$ 275.00$ 222.00$ 300.00$ 260.00$ 350.00$
181.00$ 138.50$ 400.00$ 250.00$ 367.00$ 350.00$ 220.00$ 500.00$
235.00$ 259.00$ 250.00$ 375.00$ 252.00$ 350.00$ 350.00$ 425.00$
205.00$ 230.00$ 225.00$ 285.00$ 236.00$ 300.00$ 300.00$ 400.00$
1,170.00$ 1,026.00$ 1,500.00$ 1,825.00$ 968.00$ 2,500.00$ 820.00$ 1,800.00$
271.00$ 656.00$ 325.00$ 525.00$ 267.00$ 350.00$ 400.00$ 510.00$
293.00$ 443.00$ 225.00$ 525.00$ 1,040.00$ 650.00$ 450.00$ 650.00$
202.00$ 388.50$ 200.00$ 450.00$ 1,770.00$ 550.00$ 300.00$ 500.00$
232.00$ 382.00$ 500.00$ 425.00$ 937.00$ 550.00$ 190.00$ 500.00$
3/8/2017 Page 2 of 4
Total of Bid Items: 13,304,000.00$ -28.6% 9,495,180.56$ -19.3% 10,735,645.10$ -11.7% 11,744,333.00$ -10.3% 11,938,997.50$ -18.4% 10,860,459.98$ -5.8% 12,538,967.00$ -4.4% 12,714,216.00$ 10.1% 14,643,847.00$ Project No: WY/ FLAP US212(8)
Project Name: Beartooth Highway
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Missouri River Contractors Stormwater Plans LLC DBA SWPAmerican Civil Constructors, LLCOftedal Construction, Inc. JTL DBA KnifeRiver Yellowstone HK Contractors, Inc. Riverside Contracting, Inc. ESCO ConstructionEngineer's Estimate
61707-0000
Line A1460 62 m (CQ) 375.00$ 23,250.00$ 18,848.00$ 17,670.00$ 21,700.00$ 21,700.00$ -$ 21,700.00$ 4,960.00$ 23,250.00$
61902-0000
Line A1480 1 Each 10,000.00$ 10,000.00$ 10,500.00$ 10,680.00$ 12,000.00$ 10,000.00$ -$ 12,000.00$ 4,000.00$ 15,000.00$
62002-0000
Line A1500 150 m2 1,200.00$ 180,000.00$ 159,000.00$ 154,200.00$ 157,500.00$ 150,000.00$ -$ 195,000.00$ 180,000.00$ 187,500.00$
62026-1000
Line A1520 15 m2 (CQ) 1,200.00$ 18,000.00$ 18,450.00$ 21,075.00$ 22,500.00$ 22,500.00$ -$ 25,500.00$ 25,500.00$ 30,000.00$
62201-0150
Line A1540 160 Hour 120.00$ 19,200.00$ 19,360.00$ 22,640.00$ 17,600.00$ 24,000.00$ -$ 14,400.00$ 20,800.00$ 24,800.00$
62201-0350
Line A1560 100 Hour 110.00$ 11,000.00$ 11,100.00$ 12,850.00$ 14,000.00$ 12,500.00$ -$ 16,000.00$ 12,000.00$ 13,000.00$
62201-0900
Line A1580 110 Hour 115.00$ 12,650.00$ 12,870.00$ 16,995.00$ 13,750.00$ 14,300.00$ -$ 30,250.00$ 14,300.00$ 18,150.00$
62201-1300
Line A1600 90 Hour 150.00$ 13,500.00$ 15,930.00$ 22,185.00$ 16,200.00$ 13,500.00$ -$ 16,650.00$ 18,000.00$ 24,300.00$
62201-2850
Line A1620 90 Hour 130.00$ 11,700.00$ 11,610.00$ 16,020.00$ 16,200.00$ 14,400.00$ -$ 19,350.00$ 13,500.00$ 17,100.00$
62201-3000
Line A1640 170 Hour 150.00$ 25,500.00$ 28,050.00$ 31,110.00$ 25,500.00$ 28,050.00$ -$ 42,500.00$ 34,000.00$ 34,000.00$
62201-3150
Line A1660 80 Hour 150.00$ 12,000.00$ 13,200.00$ 14,640.00$ 12,000.00$ 13,600.00$ -$ 20,000.00$ 16,000.00$ 16,000.00$
62301-0000
Line A1680 130 Hour 60.00$ 7,800.00$ 8,645.00$ 9,620.00$ 7,800.00$ 7,150.00$ -$ 12,350.00$ 4,160.00$ 5,200.00$
62302-1000
Line A1700 120 Hour 140.00$ 16,800.00$ 20,400.00$ 18,480.00$ 19,800.00$ 16,200.00$ -$ 19,200.00$ 20,400.00$ 21,000.00$
62302-1100
Line A1720 160 Hour 175.00$ 28,000.00$ 37,600.00$ 20,000.00$ 26,400.00$ 24,800.00$ -$ 37,600.00$ 35,200.00$ 44,000.00$
62402-0200
Line A1740 8.000 ha 7,000.00$ 56,000.00$ 35,440.00$ 102,400.00$ 640,000.00$ 504,000.00$ -$ 400,000.00$ 352,000.00$ 100,000.00$
62407-0000
Line A1760 17,000 m3 5.00$ 85,000.00$ 98,600.00$ 395,250.00$ 136,000.00$ 255,000.00$ -$ 263,500.00$ 119,000.00$ 391,000.00$
62510-1000
Line A1780 2.000 ha 6,500.00$ 13,000.00$ 2,720.00$ 763.52$ 4,000.00$ 1,830.00$ 3,700.00$ 12,000.00$ 10,000.00$ 930.00$
62510-1000
Line A1800 9.000 ha 6,500.00$ 58,500.00$ 7,389.00$ 3,769.92$ 18,000.00$ 8,550.00$ 10,080.00$ 9,000.00$ 45,000.00$ 4,590.00$
62510-1000
Line A1820 4.000 ha 6,500.00$ 26,000.00$ 7,080.00$ 5,238.60$ 10,000.00$ 6,400.00$ 9,600.00$ 52,000.00$ 26,000.00$ 6,400.00$
62510-1000
Line A1840 10.000 ha 6,500.00$ 65,000.00$ 26,100.00$ 20,572.60$ 30,000.00$ 25,000.00$ 35,000.00$ 70,000.00$ 50,000.00$ 25,000.00$
62515-3000
Line A1860 19.000 ha 10,000.00$ 190,000.00$ 120,460.00$ 127,539.78$ 190,000.00$ 123,500.00$ 163,590.00$ 209,000.00$ 190,000.00$ 155,800.00$
62520-0000
Line A1880 18.000 ha 4,000.00$ 72,000.00$ 48,600.00$ 67,571.64$ 82,800.00$ 72,000.00$ 65,880.00$ 99,000.00$ 59,400.00$ 81,000.00$
62631-0000
Line A1900 1.000 ha 30,000.00$ 30,000.00$ 8,450.00$ 20,440.00$ 20,000.00$ 36,000.00$ 11,130.00$ 45,000.00$ 30,000.00$ 28,000.00$
62631-0000
Line A1920 2.000 ha 30,000.00$ 60,000.00$ 7,680.00$ 28,620.00$ 34,000.00$ 32,000.00$ 10,120.00$ 62,000.00$ 110,000.00$ 24,000.00$
62631-0000
Line A1940 3.000 ha 30,000.00$ 90,000.00$ 5,370.00$ 32,190.00$ 9,000.00$ 27,000.00$ 7,080.00$ 63,000.00$ 45,000.00$ 6,000.00$
62901-0700
Line A1960 750 m2 4.00$ 3,000.00$ 6,300.00$ 2,385.00$ 6,000.00$ 5,625.00$ 1,957.50$ 30,000.00$ 5,250.00$ 3,000.00$
63301-0000
Line A1980 12 Each 2,250.00$ 27,000.00$ 13,440.00$ 12,600.00$ 6,000.00$ 27,000.00$ 8,352.00$ 15,600.00$ 4,200.00$ 30,000.00$
63301-0000
Line A2000 3 Each 38,000.00$ 114,000.00$ 193,500.00$ 149,820.00$ 180,000.00$ 150,000.00$ 100,590.00$ 243,000.00$ 90,000.00$ 135,000.00$
63309-0100
Line A2020 211 Each 60.00$ 12,660.00$ 6,752.00$ 6,330.00$ 8,862.00$ 10,972.00$ 9,178.50$ 8,440.00$ 7,596.00$ 18,990.00$
63309-0300
Line A2040 27 Each 80.00$ 2,160.00$ 945.00$ 891.00$ 1,188.00$ 2,106.00$ 2,106.00$ 1,080.00$ 972.00$ 3,105.00$
63309-0900
Line A2060 39 Each 70.00$ 2,730.00$ 663.00$ 624.00$ 780.00$ 2,028.00$ 1,618.50$ 780.00$ 1,404.00$ 3,900.00$
63309-1000
Line A2080 211 Each 130.00$ 27,430.00$ 4,009.00$ 3,798.00$ 4,642.00$ 10,972.00$ 5,908.00$ 4,642.00$ 3,165.00$ 31,650.00$
63316-1000
Line A2100 6 Each 660.00$ 3,960.00$ 2,238.00$ 2,100.00$ 3,600.00$ 15,000.00$ 2,238.00$ 2,160.00$ 1,500.00$ 7,200.00$
63404-0200
Line A2120 700 L 25.00$ 17,500.00$ 36,750.00$ 10,500.00$ 35,000.00$ 21,000.00$ 14,700.00$ 12,600.00$ 24,500.00$ 42,000.00$
63501-1000
Line A2140 ALL LPSM 150,000.00$ 150,000.00$ 210,000.00$ 153,900.00$ 210,000.00$ 260,000.00$ 137,690.00$ 250,000.00$ 400,000.00$ 400,000.00$
63502-1300
Line A2160 210 Each 30.00$ 6,300.00$ 10,080.00$ 9,450.00$ 11,130.00$ 7,560.00$ 32,970.00$ 11,550.00$ 18,900.00$ 22,050.00$ 48.00$ 45.00$ 53.00$ 36.00$ 157.00$ 55.00$ 90.00$ 105.00$
210,000.00$ 153,900.00$ 210,000.00$ 260,000.00$ 137,690.00$ 250,000.00$ 400,000.00$ 400,000.00$
52.50$ 15.00$ 50.00$ 30.00$ 21.00$ 18.00$ 35.00$ 60.00$
373.00$ 350.00$ 600.00$ 2,500.00$ 373.00$ 360.00$ 250.00$ 1,200.00$
19.00$ 18.00$ 22.00$ 52.00$ 28.00$ 22.00$ 15.00$ 150.00$
17.00$ 16.00$ 20.00$ 52.00$ 41.50$ 20.00$ 36.00$ 100.00$
35.00$ 33.00$ 44.00$ 78.00$ 78.00$ 40.00$ 36.00$ 115.00$
32.00$ 30.00$ 42.00$ 52.00$ 43.50$ 40.00$ 36.00$ 90.00$
64,500.00$ 49,940.00$ 60,000.00$ 50,000.00$ 33,530.00$ 81,000.00$ 30,000.00$ 45,000.00$
1,120.00$ 1,050.00$ 500.00$ 2,250.00$ 696.00$ 1,300.00$ 350.00$ 2,500.00$
8.40$ 3.18$ 8.00$ 7.50$ 2.61$ 40.00$ 7.00$ 4.00$
1,790.00$ 10,730.00$ 3,000.00$ 9,000.00$ 2,360.00$ 21,000.00$ 15,000.00$ 2,000.00$
3,840.00$ 14,310.00$ 17,000.00$ 16,000.00$ 5,060.00$ 31,000.00$ 55,000.00$ 12,000.00$
8,450.00$ 20,440.00$ 20,000.00$ 36,000.00$ 11,130.00$ 45,000.00$ 30,000.00$ 28,000.00$
2,700.00$ 3,753.98$ 4,600.00$ 4,000.00$ 3,660.00$ 5,500.00$ 3,300.00$ 4,500.00$
6,340.00$ 6,712.62$ 10,000.00$ 6,500.00$ 8,610.00$ 11,000.00$ 10,000.00$ 8,200.00$
2,610.00$ 2,057.26$ 3,000.00$ 2,500.00$ 3,500.00$ 7,000.00$ 5,000.00$ 2,500.00$
1,770.00$ 1,309.65$ 2,500.00$ 1,600.00$ 2,400.00$ 13,000.00$ 6,500.00$ 1,600.00$
821.00$ 418.88$ 2,000.00$ 950.00$ 1,120.00$ 1,000.00$ 5,000.00$ 510.00$
1,360.00$ 381.76$ 2,000.00$ 915.00$ 1,850.00$ 6,000.00$ 5,000.00$ 465.00$
5.80$ 23.25$ 8.00$ 15.00$ 15.50$ 7.00$ 23.00$
4,430.00$ 12,800.00$ 80,000.00$ 63,000.00$ 50,000.00$ 44,000.00$ 12,500.00$
235.00$ 125.00$ 165.00$ 155.00$ 235.00$ 220.00$ 275.00$
170.00$ 154.00$ 165.00$ 135.00$ 160.00$ 170.00$ 175.00$
66.50$ 74.00$ 60.00$ 55.00$ 95.00$ 32.00$ 40.00$
165.00$ 183.00$ 150.00$ 170.00$ 250.00$ 200.00$ 200.00$
165.00$ 183.00$ 150.00$ 165.00$ 250.00$ 200.00$ 200.00$
129.00$ 178.00$ 180.00$ 160.00$ 215.00$ 150.00$ 190.00$
177.00$ 246.50$ 180.00$ 150.00$ 185.00$ 200.00$ 270.00$
117.00$ 154.50$ 125.00$ 130.00$ 275.00$ 130.00$ 165.00$
111.00$ 128.50$ 140.00$ 125.00$ 160.00$ 120.00$ 130.00$
121.00$ 141.50$ 110.00$ 150.00$ 90.00$ 130.00$ 155.00$
1,230.00$ 1,405.00$ 1,500.00$ 1,500.00$ 1,700.00$ 1,700.00$ 2,000.00$
1,060.00$ 1,028.00$ 1,050.00$ 1,000.00$ 1,300.00$ 1,200.00$ 1,250.00$
10,500.00$ 10,680.00$ 12,000.00$ 10,000.00$ 12,000.00$ 4,000.00$ 15,000.00$
304.00$ 285.00$ 350.00$ 350.00$ 350.00$ 80.00$ 375.00$
Structure transition railing
Gate
Stone masonry
Remove and reset stone masonry
Dump truck, 7 cubic meter minimum capacity
Backhoe
Special labor, hired technical services
Special labor, hired survey services
Furnishing and placing topsoil, 75mm depth
Placing conserved topsoil
Seeding, dry method (Seed Mix A: Riparian/Wetland)
Seeding, dry method (See Mix C)
Wheel loader, 2 cubic meter minimum rated capacity
Bulldozer, 120kW minimum flywheel power
Motor grader, 3.6 meter minimum blade
Hydraulic excavator
Hydraulic excavator, crawler mounted, 0.7m3 minimum capacity with thumb attachment
General labor
Plantings (List 7)
Rolled erosion control product, type 2.C
Sign system
Sign system (Special)
Delineator, type 1
Delineator, type 3
Seeding, dry method (Seed Mix D: Forbs)
Seeding, dry method (See Mix E: Ghost Creek)
Mulching, hydraulic method, bonded fiber matrix
Fertilizer (Organic)
Plantings (List 1)
Plantings (List 3)
Delineator, type flexible
Delineator, type snowpole
Remove and reset sign
Pavement markings, type B
Temporary traffic control, traffic and safety supervisor
Temporary traffic control, drum
3/8/2017 Page 3 of 4
Total of Bid Items: 13,304,000.00$ -28.6% 9,495,180.56$ -19.3% 10,735,645.10$ -11.7% 11,744,333.00$ -10.3% 11,938,997.50$ -18.4% 10,860,459.98$ -5.8% 12,538,967.00$ -4.4% 12,714,216.00$ 10.1% 14,643,847.00$ Project No: WY/ FLAP US212(8)
Project Name: Beartooth Highway
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Missouri River Contractors Stormwater Plans LLC DBA SWPAmerican Civil Constructors, LLCOftedal Construction, Inc. JTL DBA KnifeRiver Yellowstone HK Contractors, Inc. Riverside Contracting, Inc. ESCO ConstructionEngineer's Estimate
63502-1500
Line A2180 40 Each 25.00$ 1,000.00$ 740.00$ 700.00$ 2,480.00$ 800.00$ 2,540.00$ 880.00$ 4,000.00$ 1,000.00$
63502-1700
Line A2200 185 Each 50.00$ 9,250.00$ 3,422.50$ 3,237.50$ 9,805.00$ 3,700.00$ 11,747.50$ 4,070.00$ 18,500.00$ 4,625.00$
63502-2000
Line A2220 4 Each 10,000.00$ 40,000.00$ 42,000.00$ 39,200.00$ 48,000.00$ 26,000.00$ 38,240.00$ 48,000.00$ 52,000.00$ 100,000.00$
63502-2100
Line A2240 9 Each 3,000.00$ 27,000.00$ 50,850.00$ 47,700.00$ 90,000.00$ 42,300.00$ 113,310.00$ 58,500.00$ 117,000.00$ 31,500.00$
63502-3100
Line A2260 2 Each 60,000.00$ 120,000.00$ 43,800.00$ 41,000.00$ 30,000.00$ 56,000.00$ 100,080.00$ 50,000.00$ 50,000.00$ 190,000.00$
63503-0300
Line A2280 50 m 55.00$ 2,750.00$ 8,000.00$ 7,500.00$ 5,000.00$ 15,750.00$ 10,150.00$ 10,000.00$ 1,550.00$ 12,500.00$
63503-1000
Line A2300 2,500 m 20.00$ 50,000.00$ 26,250.00$ 35,000.00$ 32,500.00$ 37,500.00$ 23,875.00$ 21,250.00$ 32,500.00$ 37,500.00$
63504-1000
Line A2320 80.0 m2 270.00$ 21,600.00$ 24,320.00$ 22,800.00$ 19,200.00$ 58,000.00$ 29,680.00$ 28,000.00$ 6,800.00$ 19,600.00$
63505-1000
Line A2340 9.360 km 2,500.00$ 23,400.00$ 7,824.96$ 7,020.00$ 9,360.00$ 37,440.00$ 9,828.00$ 9,360.00$ 7,020.00$ 37,440.00$
63506-0500
Line A2360 7,000 Hour 50.00$ 350,000.00$ 245,000.00$ 231,000.00$ 224,000.00$ 280,000.00$ 434,000.00$ 280,000.00$ 231,000.00$ 420,000.00$
64703-1000
Line A2380 25 Each 525.00$ 13,125.00$ 4,600.00$ 2,112.50$ 7,500.00$ 25,000.00$ 20,775.00$ 8,750.00$ 7,500.00$ 2,750.00$ 184.00$ 84.50$ 300.00$ 1,000.00$ 831.00$ 350.00$ 300.00$ 110.00$
35.00$ 33.00$ 32.00$ 40.00$ 62.00$ 40.00$ 33.00$ 60.00$
836.00$ 750.00$ 1,000.00$ 4,000.00$ 1,050.00$ 1,000.00$ 750.00$ 4,000.00$
304.00$ 285.00$ 240.00$ 725.00$ 371.00$ 350.00$ 85.00$ 245.00$
10.50$ 14.00$ 13.00$ 15.00$ 9.55$ 8.50$ 13.00$ 15.00$
160.00$ 150.00$ 100.00$ 315.00$ 203.00$ 200.00$ 31.00$ 250.00$
21,900.00$ 20,500.00$ 15,000.00$ 28,000.00$ 50,040.00$ 25,000.00$ 25,000.00$ 95,000.00$
5,650.00$ 5,300.00$ 10,000.00$ 4,700.00$ 12,590.00$ 6,500.00$ 13,000.00$ 3,500.00$
10,500.00$ 9,800.00$ 12,000.00$ 6,500.00$ 9,560.00$ 12,000.00$ 13,000.00$ 25,000.00$
18.50$ 17.50$ 53.00$ 20.00$ 63.50$ 22.00$ 100.00$ 25.00$
18.50$ 17.50$ 62.00$ 20.00$ 63.50$ 22.00$ 100.00$ 25.00$
Temporary traffic control, warning light type A
Temporary traffic control, warning light type C
Temporary traffic control, portable changeable message sign
Temporary traffic control, crash cushion
Temporary traffic control, traffic signal system
Temporary traffic control, barricade type 3
Temporary traffic control, plastic fence
Temporary traffic control, construction sign
Temporary traffic control, pavement markings
Temporary traffic control, flagger
Mitigation, landscaping log
3/8/2017 Page 4 of 4